[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138996":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1138996,798,1,"单选题","采用工程量清单计价的工程在竣工决算时，暂估价中的材料单价应按（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包方自行购买该材料的单价计入综合单价确定",false,{"key":16,"text":17,"correct":18},"B","发、承包双方最终确认价在综合单价中调整",true,{"key":20,"text":21,"correct":14},"C","招标文件中的暂估价定",{"key":23,"text":24,"correct":14},"D","市场价格信息在综合单价中调整","2012年建设工程经济真题第19题 本题主要考查了竣工结算方法。 B项：竣工结算中其他项目费用的计算：暂估价中的材料单价应按发、承包双方最终确认价在综合单价中调整；专业工程暂估价应按中标价或发包人、承包人与分包人最终确认价计算。故B项正确。 ACD项：选项ACD并不是工程量清单计价的工程在竣工决算时的计价方式。故ACD项不应选。 综上所述，本题正确答案为B项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]