[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138976":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1138976,798,1,"单选题","现场签证费用的计价方式中，对于完成合同以外的零星工作时，按（ ）计算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计日工作单价",true,{"key":16,"text":17,"correct":18},"B","合同中的约定",false,{"key":20,"text":21,"correct":18},"C","计日工作调整单价",{"key":23,"text":24,"correct":18},"D","合同约定的一定比例","本题考查的是现场签证费用的概念。 现场签证费用的计价方式包括两种：第一种是完成合同以外的零星工作时，按计日工单价计算，第二种是完成其他非承包人责任引起的事件，应按合同中的约定计算。 综上所述，本题的正确答案为A。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]