[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138950":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1138950,798,2,"多选题","关于《建设工程施工合同（示范文本）》条件下工程变更的说法，正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","承包人对发包人的变更通知有权拒绝",false,{"key":16,"text":17,"correct":14},"B","施工中承包人经工程师同意，可以为了施工方便对原工程设计进行变更",{"key":19,"text":20,"correct":21},"C","未经工程师同意承包人擅自更改设计，承包人应该承担由此发生的费用",true,{"key":23,"text":24,"correct":21},"D","承发包双方对工期要求的变化，应当由一方提出，双方协商一致后，进行变更",{"key":26,"text":27,"correct":14},"E","因承包人自身原因导致的工程变更，经工程师确认，承包人可以要求追加合同价款","CD","施工中承包人不得为了施工方便而要求对原工程设计进行变更。施工中承包人提出的合理化建议需经监理工程师同意，监理工程师同意变更后，也须经原规划管理部门和其他有关部门审查批准。题目中B项是错的，。正确答案应该是CD。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]