[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138926":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1138926,798,1,"单选题","某灌注桩计量支付条款约定工程量以米计算，若设计长度为20米的灌注桩，承包人做了21米，监理工程师未对施工质量表示异议，则发包人应该按（ ）米支付价款。( 2015真题 )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","19",false,{"key":16,"text":17,"correct":18},"B","20",true,{"key":20,"text":21,"correct":14},"C","21",{"key":23,"text":24,"correct":14},"D","22","本题考查的是工程计量的依据。对于不符合合同文件要求的工程，承包人超出施工图纸范围或因承包人原因造成返工的工程量，不予计量。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]