[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138829":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1138829,798,1,"单选题","工程量清单计价应包括按招标文件规定，完成工程量清单所列项目的（ ）费用。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主要",false,{"key":16,"text":17,"correct":18},"B","全部",true,{"key":20,"text":21,"correct":14},"C","一大部分",{"key":23,"text":24,"correct":14},"D","一小部分","2005年建设工程经济真题第52题 本题考查的是工程量清单计价的方法。 工程量清单是表示建设工程的分部分项工程项目、措施项目、其他项目、规费项目和税金项目的名称和相应数量等的明细清单，应包括按招标文件规定，完成工程量清单所列项目的全部费用。 综上所述，本题的正确答案为B。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]