[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138809":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1138809,798,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50500—2008）计价的某土方工程，业主方提供的清单工程量为3951m3。施工企业预计的实际施工量为7902m3，预计完成该分项工程的直接费为115265.27元，管理费为39190.19元，利润为9221.22元，不考虑风险费和其他因素，则该分项工程的综合单价应为（ ）元\u002F m3。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","41.43",true,{"key":16,"text":17,"correct":18},"B","20.71",false,{"key":20,"text":21,"correct":18},"C","29.17",{"key":23,"text":24,"correct":18},"D","94.48","2012年建设工程经济真题第32题 本题主要考查了工程量清单计价的方法。 工程量清单计价的主要有三种形式：工料单价法、综合单价法、全费用综合单价法。 综合单价=（直接工程费+管理费+利润）\u002F清单工程量 本题综合单价=（115265.27+39190.19+9221.22）\u002F（3951）=41.43（元\u002Fm3） 因此，本题正确答案为A项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]