[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138798":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1138798,798,1,"单选题","清单一经报出，即被认为是包括了所有应该发生的措施项目的（ ）费用。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","大部分",false,{"key":16,"text":17,"correct":14},"B","主要",{"key":19,"text":20,"correct":21},"C","全部",true,{"key":23,"text":24,"correct":14},"D","一小部分","2005年建设工程经济真题第49题 本题考查的是工程量清单的作用。 工程量清单是建设工程计价、工程付款、结算、调整工程价款、处理工程索赔的依据。故清单一经报出，即被认为是包括了所有应该发生的措施项目的全部费用。 综上所述，本题正确答案应为C。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]