[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138769":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1138769,798,1,"单选题","根据《建设工程工程量清单计价规范》(GB 50500—2008)，除另有说明外，所有清单项目的工程量（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","均以清单列明工程量为准",false,{"key":16,"text":17,"correct":14},"B","按照清单计算公式计算确定",{"key":19,"text":20,"correct":21},"C","以实体工程量为准，并以完成后的净值计算",true,{"key":23,"text":24,"correct":14},"D","由发、承包双方友好协商确定","本题主要考查了分部分项工程量清单的编制。 工程量计算规则是指对清单项目工程量的计算规定。除另有说明外，所有清单项目的工程量以实体工程量为准，并以完成后的净值来计算。 综上所述，本题正确答案为C项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]