[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138754":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1138754,798,1,"单选题","根据《建设工程工程量清单计价规范》(GB 50500--2008)编制的工程量清单中，某分部分项工程的项目编码是010302004005，则“005”的含义是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程分类顺序码",false,{"key":16,"text":17,"correct":14},"B","分项工程顺序码",{"key":19,"text":20,"correct":14},"C","分部工程顺序码",{"key":22,"text":23,"correct":24},"D","工程量清单项目顺序码",true,"本题主要考查了分部分项工程量清单的编制。 工程量清单项目编码结构图如下： 如图所示：第五级为工程量清单项目顺序码（分三位），因此，“005”为工程量清单项目顺序码。 综上所述，本题正确答案为D项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]