[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138719":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1138719,798,1,"单选题","(2014真题)某分部分项工程的清单编码为010302004014，则该分部分项工程的清单项目顺序码为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","01",false,{"key":16,"text":17,"correct":18},"B","014",true,{"key":20,"text":21,"correct":14},"C","03",{"key":23,"text":24,"correct":14},"D","004","工程量清单中，项目编码的第五级，即最后三位，为工程量清单项目顺序码。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]