[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138677":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1138677,798,1,"单选题","采用扩大单价法编制设备安装工程概算，其适用条件包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","初步设计有详细设备清单",false,{"key":16,"text":17,"correct":18},"B","初步设计的设备清单不完备",true,{"key":20,"text":21,"correct":14},"C","具有类似设备安装工程预算",{"key":23,"text":24,"correct":14},"D","安装预算单价不全","本题主要考查了单位工程概算的编制方法。 扩大单价法适用于初步设计的设备清单不完备，或仅有成套设备的重量时，可采用主体设备、成套设备或工艺线的综合扩大安装单价编制概算。 综上所述，本题正确答案为B项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]