[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138511":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1138511,798,1,"单选题","根据《建设工程工程量清单计价规范》（GB50500-2013），下列费用可用暂列金额支付的是（ ）。 2016",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","业主提出设计变更增加的费用",true,{"key":16,"text":17,"correct":18},"B","业主提供了暂估价的材料采购费用",false,{"key":20,"text":21,"correct":18},"C","因承包人原因导致隐蔽工程质量不合格的返工费用",{"key":23,"text":24,"correct":18},"D","固定总价合同中材料价格上涨费用","本题考查的是其他项目费。暂列金额是指发包人在工程量清单中暂定并包括在工程合同价款中的一笔款项。用于施工合同签订时尚未确定或者不可预见的所需材料、工程设备、服务的采购，施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整以及发生的索赔、现场签证确认等的费用。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]