[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138376":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1138376,798,2,"多选题","编制人工定额时，属于工人工作必需消耗的时间有（ ）。 2016",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","多余和偶然工作时间",false,{"key":16,"text":17,"correct":14},"B","施工本身造成的停工时间",{"key":19,"text":20,"correct":21},"C","不可避免的中断时间",true,{"key":23,"text":24,"correct":21},"D","辅助工作时间",{"key":26,"text":27,"correct":21},"E","准备与结束工作时间","CDE","本题考查的是人工定额的编制。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]