[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138370":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1138370,798,2,"多选题","编制人工定额时，属于工人工作必需消耗的时间有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","违背劳动纪律损失时间",false,{"key":16,"text":17,"correct":18},"B","基本工作时间",true,{"key":20,"text":21,"correct":18},"C","辅助工作时间",{"key":23,"text":24,"correct":18},"D","准备与结束工作时间",{"key":26,"text":27,"correct":18},"E","不可避免的中断时间","BCDE","2011年建设工程经济真题第70题 本题主要考查了人工定额的编制。 工人工作时间的分类如图： BCDE项：如图所示，BCDE均符合题意，故当选。 A项：违背劳动纪律损失的时间属于损失时间。因此，A项错误。 综上所述，本题正确答案为BCDE项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]