[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138332":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1138332,798,1,"单选题","企业的应收账款增加将导致企业（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","时段净资产减少",false,{"key":16,"text":17,"correct":14},"B","流动资产减少",{"key":19,"text":20,"correct":14},"C","总资产减少",{"key":22,"text":23,"correct":24},"D","坏账的风险增加",true,"2010年建设工程经济真题第58题 本题主要考查了应收账款的财务管理。 D项：坏账是企业无法收回或收回的可能性极小的应收账款，当企业的应收账款增加将导致企业坏账的风险增加。因此，D项正确。 ABC项：应收账款属于流动资产，应收账款的增加意味着资产的增加。因此，ABC项错误。 综上所述，本题正确答案为D项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]