[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138082":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1138082,798,1,"单选题","按照《企业会计准则》规定，如果建造合同结果能够可靠估计，应在资产负债表日根据（ ）确认当期的合同收入。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","完工百分比法",true,{"key":16,"text":17,"correct":18},"B","利润计算要求",false,{"key":20,"text":21,"correct":18},"C","业主工程款支付进度",{"key":23,"text":24,"correct":18},"D","税务机关要求","本题考查建造（施工）合同收入的确认。 建筑业企业应当及时、准确地进行合同收入和合同费用的确认与计置，以便分析和考核建造（施工）合同损益的实现情况。要准确地进行合同收人的确认与计量，首先应判断建造合同的结果能否可靠地估计。如果建造合同能够可靠地估计，应在资产负债表日根据完工百分比法确认当期的合同收人。如果建造合同的结果不能可靠地估计，就不能根据完工百分比法确认合同收人。 综上所述，本题正确答案为A项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]