[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1138013":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1138013,798,2,"多选题","根据《企业会计准则第15号——建造合同》，工程成本中的其他直接费包括施工过程中发生的（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","材料二次搬运费",true,{"key":16,"text":17,"correct":14},"B","临时设施摊销费",{"key":19,"text":20,"correct":21},"C","施工机械安装、拆卸和进出场费",false,{"key":23,"text":24,"correct":14},"D","工程定位复测费",{"key":26,"text":27,"correct":14},"E","场地清理费","ABDE","2009年建设工程经济真题第68题 本题主要考查了工程成本及其核算的内容。 其他直接费用包括施工过程中发生的材料二次搬运费、临时设施摊销费、工程定位复测费、场地清理费、生产工具使用费、检验试验费、工程点交费等。 综上所述，本题正确答案为ABDE项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]