[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137996":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1137996,798,1,"单选题","固定资产的账面价值是固定资产原值扣减（ ）后的余额。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","累计折旧和累计减值准备",true,{"key":16,"text":17,"correct":18},"B","预计净残值和累计减值准备",false,{"key":20,"text":21,"correct":18},"C","预计净残值",{"key":23,"text":24,"correct":18},"D","累计折旧","2009年建设工程经济真题第9题 本题主要考查了成本费用的计量。 应计折旧额是固定资产的原值扣除其预计净残值后的金额，已计提减值准备的固定资产，还应当扣除已计提的固定资产减值准备累计金额。因此，固定资产的账面价值是固定资产原值扣减累计折旧和累计减值准备后的余额。 综上所述，本题正确答案为A项。@jin",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]