[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137973":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1137973,798,1,"单选题","按照会计准则规定，固定资产的原价扣除其预计净残值，再扣除已计提固定资产减值准备累计金额后的余额是固定资产的（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","年折旧额",false,{"key":16,"text":17,"correct":14},"B","净值",{"key":19,"text":20,"correct":21},"C","应计折旧额",true,{"key":23,"text":24,"correct":14},"D","折余价值","本题主要考查了成本费用的计量。 C项：应计折旧额是固定资产的原价扣除其预计净残值后的金额，已计提减值准备的固定资产，还应当扣除已计提的固定资产减值准备累计金额。因此，C项正确。 A项：年折旧额是企业根据与固定资产有关的经济利益的预期实现方式，采用恰当的折旧方式每年计提的折旧金额。因此，A项错误。 BD项：净值（固定资产净值）=固定资产的折余价值=固定资产原价－计提的累计折旧。因此，BD项错误。 综上所述，本题正确答案为C项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]