[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137613":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1137613,798,1,"单选题","投资回收期和借款偿还期两个经济评价指标都是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","自建设年开始计算",false,{"key":16,"text":17,"correct":18},"B","时间性指标",true,{"key":20,"text":21,"correct":14},"C","反映偿还债能力的指标",{"key":23,"text":24,"correct":14},"D","动态评价指标","2006年建设工程经济真题第4题 本题考查的是经济效果评价指标体系。 B项：投资回收期和借款偿还期都是时间性指标，故B正确。 A项：借款偿还期是从借款开始年计算，故A错误。 C项：投资回收期反映的是技术方案投资回收能力，并不反映偿还债能力，故C错误。 D项：投资回收期通常指的是静态回收期，故D错误。 综上所述，B项为正确选项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]