[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137558":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1137558,798,1,"单选题","在对某生产性技术方案进行评价时，已知基准投资收益率为7%，计算期为8 年，每年的净现金流量依次为－550 万元、－700 万元、300 万元、400 万元、450 万元、500 万元、550万元、600 万元。则该项目的静态投资回收期为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5.20 年",true,{"key":16,"text":17,"correct":18},"B","3.5 年",false,{"key":20,"text":21,"correct":18},"C","6.18 年",{"key":23,"text":24,"correct":18},"D","8 年","本题考查的是静态投资回收期的计算。 静态投资回收期的计算公式： Pt=(6-1)+|-100|\u002F500=5.20 综上所述，正确选项为A。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]