[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137541":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137541,798,2,"多选题","如果某技术方案在经济上可行，则一定有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","静态投资回收期大于项目的寿命周期",false,{"key":16,"text":17,"correct":18},"B","财务内部收益率大于或等于基准收益率",true,{"key":20,"text":21,"correct":18},"C","财务净现值大于或等于零",{"key":23,"text":24,"correct":14},"D","财务净现值大于项目总投资",{"key":26,"text":27,"correct":14},"E","财务内部收益率大于单位资金成本","BC","本题主要考查了投资回收期分析，财务内部收益率分析，财务净现值分析。 BE项：财务内部收益率计算出来后与基准收益率进行比较，当财务内部收益率大于或等于基准收益率时，则技术方案在经济上可以接受。因此，B项正确，E项错误。 CD项：财务净现值是评价技术方案盈利能力的绝对指标，当财务净现值大于等于零时，说明该技术方案在经济上可行。因此，C项正确，D项错误。 A项：利用静态投资回收期评价技术方案经济上是否可行，一般是将静态投资回收期与所确定的基准投资回收期进行比较，当静态投资回收期小于或等于基准投资回收期时，表明该项目可行。因此，A项错误。 综上所述，本题正确答案为BC项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程经济","建筑工程",0]