[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137511":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1137511,798,1,"单选题","在财务评价指标中，考虑资金时间价值以及项目在整个计算期内的经济状况、不受外部参数影响、完全取决于项目投资过程净现金流量系列情况的指标是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","内部收益率",true,{"key":16,"text":17,"correct":18},"B","财务净现值率",false,{"key":20,"text":21,"correct":18},"C","财务净现值",{"key":23,"text":24,"correct":18},"D","静态投资回收期","本题主要考查了财务内部收益率分析。 财务内部收益率(FIRR)指标考虑了资金的时间价值以及技术方案在整个计算期内的经济状况，不仅能反映投资过程的收益程度，而且FIRR大小不受外部参数影响，完全取决于技术方案投资过程净现金流量系列的情况。这种技术方案内部决定性使它在应用中具有一个显著的优点，即避免了像财务净现值之类指标那样需事先确定基准收益率这个难题，只需要知道基准收益率的大致范围即可。 综上所述，本题正确答案为A项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]