[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137444":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1137444,798,1,"单选题","现金流量图中，箭线与时间轴的交点即为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","现金流量发生的时点，通常是该时间单位末的时点",true,{"key":16,"text":17,"correct":18},"B","现金流入",false,{"key":20,"text":21,"correct":18},"C","时间序列的起点",{"key":23,"text":24,"correct":18},"D","现金流出","本题主要考查了现金流量图的绘制。 AC项：现金流量图中，箭线与时间轴的交点即为现金流量发生的时点，通常表示的是该时间单位末的时点，0表示时间序列的起点。因此，A项正确，C项错误。 BD项：对投资人而言，在横轴上方的箭线表示现金流入，在横轴下方的箭线表示现金流出。因此，BD项错误。 综上所述，本题正确答案为A项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程经济","建筑工程",0]