[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,9,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,282,291,303,315,327,336,348,360,372,384,396,408,420,432,444,456,468,480,492,503,515,527,536,546,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1135728,1,"单选题","下列试验项目，干式电力变压器可不试验的项目是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","测量绕组直流电阻",false,{"key":24,"text":25,"correct":22},"B","测量绕组吸收比",{"key":27,"text":28,"correct":29},"C","测量绕组介质损耗",true,{"key":31,"text":32,"correct":22},"D","测量铁芯绝缘电阻","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1135729,"根据导线连接要求，在跨越公路、铁路、河流、重要建筑物等处，导线接头的数量应为（）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"0个",{"key":24,"text":41,"correct":22},"1个",{"key":27,"text":43,"correct":22},"2个",{"key":31,"text":45,"correct":22},"3个",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1135730,"在人行道下直接敷设电缆的埋深应不小于（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"0.5m",{"key":24,"text":53,"correct":29},"0.7m",{"key":27,"text":55,"correct":22},"0.9m",{"key":31,"text":57,"correct":22},"1.0m",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1135731,"蒸汽管道每段管道的最高点要设置（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"补偿器",{"key":24,"text":65,"correct":22},"防振装置",{"key":27,"text":67,"correct":22},"排水装置",{"key":31,"text":69,"correct":29},"放气装置",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1135732,"埋地长输管线下沟后，应进行的管道施工工序不包括（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"通球试压测径",{"key":24,"text":77,"correct":22},"管线吹扫、干燥",{"key":27,"text":79,"correct":22},"连头（碰死口）",{"key":31,"text":81,"correct":29},"防腐蚀",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1135733,"管道轴测图应标明的焊接工艺信息不包括（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"焊缝编号和焊工代号",{"key":24,"text":89,"correct":22},"无损检测焊缝位置",{"key":27,"text":91,"correct":22},"热处理焊缝位置",{"key":31,"text":93,"correct":29},"焊接检查记录",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1135734,"大型储罐的管道与泵或其他有独立基础的设备连接,应在储罐（）合格后安装。",[98,100,102,104],{"key":20,"text":99,"correct":29},"充水试验",{"key":24,"text":101,"correct":22},"基础验收",{"key":27,"text":103,"correct":22},"焊接检验",{"key":31,"text":105,"correct":22},"外形尺寸检查",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1135735,"根据管道内物质的一般性能，下列关于工业管道识别色的说法错误的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"水是艳绿色",{"key":24,"text":113,"correct":22},"酸或碱是紫色",{"key":27,"text":115,"correct":22},"气体是中黄色",{"key":31,"text":117,"correct":29},"氧是大红色",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1135736,"管道系统在试压前，管道上的膨胀节应按试验要求（）。",[122,124,126,128],{"key":20,"text":123,"correct":29},"设置临时约束装置",{"key":24,"text":125,"correct":22},"处于自然状态",{"key":27,"text":127,"correct":22},"进行隔离",{"key":31,"text":129,"correct":22},"拆除",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1135737,"根据《工业管道的基本识别色、识别符号和安全标识》GB7231-2003国家标准和管道内物质的一般性能，基本识别色分为（）类。",[134,136,138,140],{"key":20,"text":135,"correct":22},"五",{"key":24,"text":137,"correct":22},"六",{"key":27,"text":139,"correct":22},"七",{"key":31,"text":141,"correct":29},"八",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1135738,"在非金属管道中，属于无机非金属材料的管道是（）。",[146,148,150,152],{"key":20,"text":147,"correct":29},"混凝土管",{"key":24,"text":149,"correct":22},"塑料管",{"key":27,"text":151,"correct":22},"玻璃钢管",{"key":31,"text":153,"correct":22},"橡胶管",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1135739,"工业管道以设计压力为主要参数进行分级，不属于按照管道设计压力分类的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"真空管道",{"key":24,"text":161,"correct":22},"中压管道",{"key":27,"text":163,"correct":29},"氧气管道",{"key":31,"text":165,"correct":22},"超高压管道",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1135740,"管道安装前对管道元件及材料的检查要求必须具有制造厂的（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"质量保证手册",{"key":24,"text":173,"correct":22},"质量体系文件",{"key":27,"text":175,"correct":22},"质量认证文件",{"key":31,"text":177,"correct":29},"质量证明书",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1135741,"施工单位在压力管道施工前，向管道安装工程所在地的（）部门办理了书面告知，并接受监督检验单位的监督检验。",[182,184,186,188],{"key":20,"text":183,"correct":22},"资质审查主管",{"key":24,"text":185,"correct":29},"质量技术监督",{"key":27,"text":187,"correct":22},"安全技术监督",{"key":31,"text":189,"correct":22},"政府行政主管",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1135742,"对非金属管道的连接，在编制连接作业工艺文件前应咨询（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"工程监理",{"key":24,"text":197,"correct":22},"建设单位",{"key":27,"text":199,"correct":29},"生产厂家",{"key":31,"text":201,"correct":22},"技术监督部门",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1135743,"公称直径小于600mm的液体管道宜采用（）。",[206,208,210,212],{"key":20,"text":207,"correct":29},"水冲洗",{"key":24,"text":209,"correct":22},"蒸汽吹扫",{"key":27,"text":211,"correct":22},"空气吹扫",{"key":31,"text":213,"correct":22},"燃气吹扫",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1135744,"不属于泄漏试验检查重点的选项是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"阀门填料函",{"key":24,"text":221,"correct":29},"施焊焊缝处",{"key":27,"text":223,"correct":22},"法兰连接处",{"key":31,"text":225,"correct":22},"螺纹连接处",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1135745,"奥氏体不锈钢制容器用水作介质进行水压试验时，水质的氯离子含量不应超过（）。",[230,232,234,236],{"key":20,"text":231,"correct":29},"25ppm",{"key":24,"text":233,"correct":22},"50ppm",{"key":27,"text":235,"correct":22},"100ppm",{"key":31,"text":237,"correct":22},"125ppm",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1135746,"管道膨胀节在试压前（），管道已按试验要求进行了加固。",[242,244,246,248],{"key":20,"text":243,"correct":29},"已设置临时约束装置",{"key":24,"text":245,"correct":22},"已处于自然状态",{"key":27,"text":247,"correct":22},"已隔离",{"key":31,"text":249,"correct":22},"已拆除",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1135747,"管道安装的一般程序中，仪表安装完毕以后应进行的工作是（）。",[254,256,258,260],{"key":20,"text":255,"correct":29},"管道试压及清（吹）洗",{"key":24,"text":257,"correct":22},"管道吹洗",{"key":27,"text":259,"correct":22},"管道防腐",{"key":31,"text":261,"correct":22},"调试试运行",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1135748,"管道与机械设备连接前，应在自由状态下检验法兰的（），偏差应符合规定要求。",[266,268,270,272],{"key":20,"text":267,"correct":22},"垂直度和同轴度",{"key":24,"text":269,"correct":29},"平行度和同轴度",{"key":27,"text":271,"correct":22},"凹凸度和同心度",{"key":31,"text":273,"correct":22},"垂直度和平行度",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1135749,"蒸汽管道每段管道的最低点要设置（）。",[278,279,280,281],{"key":20,"text":63,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":67,"correct":29},{"key":31,"text":69,"correct":22},{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1135750,"非热力管道不得使用（）。",[286,287,288,289],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":29},{"key":27,"text":211,"correct":22},{"key":31,"text":290,"correct":22},"二氧化炭气体吹扫",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":27,"analysis":33},1135751,"在气压试验合格后，管道真空系统还应按设计文件规定进行的真空度试验，对管道系统抽真空，达到设计规定的真空度后，关闭系统（）后系统增压率不应大于5%。",[295,297,299,301],{"key":20,"text":296,"correct":22},"7h",{"key":24,"text":298,"correct":22},"14h",{"key":27,"text":300,"correct":29},"24h",{"key":31,"text":302,"correct":22},"48h",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},1135752,"金属管道进行耐压试验时，严禁使试验温度接近金属的（）温度。",[307,309,311,313],{"key":20,"text":308,"correct":22},"平均试验",{"key":24,"text":310,"correct":22},"设计试验",{"key":27,"text":312,"correct":22},"塑性转变",{"key":31,"text":314,"correct":29},"脆性转变",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1135753,"管道进行气压试验的正确步骤是（）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"缓慢升压至试验压力的30%→按试验压力的10%逐级升压后每级稳压3min→直至试验压力稳压10min→试验压力降至设计压力涂发泡剂检验不泄漏为合格",{"key":24,"text":322,"correct":29},"缓慢升压至试验压力的50%→按试验压力的10%逐级升压后每级稳压3min→直至试验压力稳压10min→试验压力降至设计压力涂发泡剂检验不泄漏为合格",{"key":27,"text":324,"correct":22},"缓慢升压至试验压力→稳压10min→涂刷发泡剂检验不泄漏为合格",{"key":31,"text":326,"correct":22},"缓慢升压至试验压力→稳压10min→试验压力降至设计压力保持30min→以压力不降无渗漏为合格",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":27,"analysis":33},1135754,"公称直径为600mm的液体管道在压力试验合格后应进行吹洗工作，正确的做法是（）。",[331,332,333,335],{"key":20,"text":207,"correct":22},{"key":24,"text":209,"correct":22},{"key":27,"text":334,"correct":29},"人工清理",{"key":31,"text":211,"correct":22},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":31,"analysis":33},1135755,"阀门壳体压力试验和密封试验应以洁净水为介质，不锈钢阀门试验时水中的氯离子含量不得超过（）ppm。",[340,342,344,346],{"key":20,"text":341,"correct":22},"100",{"key":24,"text":343,"correct":22},"75",{"key":27,"text":345,"correct":22},"50",{"key":31,"text":347,"correct":29},"25",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},1135756,"热力管道两个补偿器之间以及每一个补偿器两侧（指远的一端）应设置（）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"滑动支架",{"key":24,"text":355,"correct":29},"固定支架",{"key":27,"text":357,"correct":22},"导向支架",{"key":31,"text":359,"correct":22},"弹簧吊架",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":31,"analysis":33},1135757,"输送极度和高度危害介质以及可燃介质的管道必须进行（）。",[364,366,368,370],{"key":20,"text":365,"correct":22},"气压试验",{"key":24,"text":367,"correct":22},"气密性试验",{"key":27,"text":369,"correct":22},"液压试验",{"key":31,"text":371,"correct":29},"泄漏性试验",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":31,"analysis":33},1135758,"阀门的壳体试验压力为阀门在20℃时最大允许工作压力的（）倍。",[376,378,380,382],{"key":20,"text":377,"correct":22},"1.10",{"key":24,"text":379,"correct":22},"1.15",{"key":27,"text":381,"correct":22},"1.25",{"key":31,"text":383,"correct":29},"1.50",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},1135760,"某台分馏塔共分三段，采用由下至上逐段组对安装的方法，其第三段（上段）吊装、找正的紧前工序是（）。",[388,390,392,394],{"key":20,"text":389,"correct":22},"第二段找正",{"key":24,"text":391,"correct":29},"第一、二段段间环焊组对焊接",{"key":27,"text":393,"correct":22},"第二、三段段间环焊组对焊接",{"key":31,"text":395,"correct":22},"紧固地脚螺栓",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},1135761,"球形罐整体热处理时应进行柱脚处理，监测柱脚实际位移值，并按计算位移值调整柱脚的位移。整体热处理后应测量并调整支柱的（）。",[400,402,404,406],{"key":20,"text":401,"correct":29},"垂直度和拉杆挠度",{"key":24,"text":403,"correct":22},"水平度和拉杆挠度",{"key":27,"text":405,"correct":22},"水平度和垂直度",{"key":31,"text":407,"correct":22},"铅垂度和水平度",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":31,"analysis":33},1135762,"罐壁纵缝焊接采用气电立焊时,说法正确的是（）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"完成环缝焊接后才进行纵缝焊接",{"key":24,"text":415,"correct":22},"自上向下焊接",{"key":27,"text":417,"correct":22},"从中间向两端焊",{"key":31,"text":419,"correct":29},"自下向上焊接",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1135763,"分两段到货塔器采用在基础上逐段组对安装方式，下列工序顺序正确的是（）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"基础验收、设置垫铁→塔器现场检查验收→运放至吊装要求位置→整体吊装、找正、紧固地脚螺栓、垫铁点固",{"key":24,"text":427,"correct":29},"塔器现场检查验收→运放至吊装要求位置→基础验收、设置垫铁→整体吊装、找正、紧固地脚螺栓、垫铁点固",{"key":27,"text":429,"correct":22},"塔器现场检查验收→基础验收、设置垫铁→运放至吊装要求位置→整体吊装、找正、紧固地脚螺栓、垫铁点固",{"key":31,"text":431,"correct":22},"运放至吊装要求位置→基础验收、设置垫铁→塔器现场检查验收→整体吊装、找正、紧固地脚螺栓、垫铁点固",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},1135764,"按照钢构件制作工艺的要求，低合金结构钢在加热矫正后应（）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"水冷却",{"key":24,"text":439,"correct":29},"自然冷却",{"key":27,"text":441,"correct":22},"油冷却",{"key":31,"text":443,"correct":22},"风冷",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1135765,"关于大型金属储罐内挂脚手架正装法施工的要求，正确的是（）。",[448,450,452,454],{"key":20,"text":449,"correct":29},"一台储罐施工宜用2至3层脚手架",{"key":24,"text":451,"correct":22},"在储罐壁板内侧挂设移动脚手架",{"key":27,"text":453,"correct":22},"脚手架随罐壁板升高逐层搭设",{"key":31,"text":455,"correct":22},"储罐的脚手架从上到下交替使用",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1135766,"钢制储罐充水试验前，所有附件及其他与罐体焊接的构件全部完工并（）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"完成中间交接",{"key":24,"text":463,"correct":29},"检验合格",{"key":27,"text":465,"correct":22},"质量评定合格",{"key":31,"text":467,"correct":22},"经监理确认",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":27,"analysis":33},1135767,"压力试验过程中如发现泄漏、异常响声等不正常情况，应停止试验并（），经修补处理后再按规定重新试验。",[472,474,476,478],{"key":20,"text":473,"correct":22},"关闭试压电源",{"key":24,"text":475,"correct":22},"分析原因",{"key":27,"text":477,"correct":29},"卸压",{"key":31,"text":479,"correct":22},"确定缺陷位置",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":20,"analysis":33},1135768,"常见的钢制储罐的安装方法中，适合于大型和特大型储罐，便于自动焊作业的是（）方法。",[484,486,488,490],{"key":20,"text":485,"correct":29},"架设正装",{"key":24,"text":487,"correct":22},"边柱倒装",{"key":27,"text":489,"correct":22},"气吹倒装",{"key":31,"text":491,"correct":22},"水浮正装",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":27,"analysis":33},1135769,"球形罐焊后整体热处理应在（）前进行。",[496,498,500,502],{"key":20,"text":497,"correct":22},"与球罐壳体连接的受压件焊缝焊接",{"key":24,"text":499,"correct":22},"无损检测完成",{"key":27,"text":501,"correct":29},"压力试验",{"key":31,"text":367,"correct":22},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1135770,"储罐充水试验中应进行基础沉降观测。在罐壁下部圆周每隔10m左右设一个观测点，点数宜为（）且不得少于4点。",[507,509,511,513],{"key":20,"text":508,"correct":22},"2的倍数",{"key":24,"text":510,"correct":22},"3的倍数",{"key":27,"text":512,"correct":29},"4的倍数",{"key":31,"text":514,"correct":22},"6的倍数",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":31,"analysis":33},1135771,"架设正装法适合于大型和特大型储罐，尤其便于（）作业。",[519,521,523,525],{"key":20,"text":520,"correct":22},"罐板组对",{"key":24,"text":522,"correct":22},"吊装",{"key":27,"text":524,"correct":22},"手工焊接",{"key":31,"text":526,"correct":29},"自动焊接",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1135772,"钢网架结构总拼完成后应测量其挠度值，所测的挠度值不应超过相应设计值的（）倍。",[531,532,533,535],{"key":20,"text":377,"correct":22},{"key":24,"text":379,"correct":29},{"key":27,"text":534,"correct":22},"1.20",{"key":31,"text":381,"correct":22},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},1135773,"整体到货的塔器安装,垫铁点焊固定后的后续工作是（）。",[540,541,543,545],{"key":20,"text":101,"correct":22},{"key":24,"text":542,"correct":22},"吊装塔器",{"key":27,"text":544,"correct":29},"二次灌浆",{"key":31,"text":395,"correct":22},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1135774,"球形罐常用的施工宜用的方法是（）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"正装法",{"key":24,"text":553,"correct":29},"分片法",{"key":27,"text":555,"correct":22},"气顶法",{"key":31,"text":557,"correct":22},"环带法",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1135775,"塔器设备水压试验正确的程序是（）",[562,564,566,568],{"key":20,"text":563,"correct":22},"充液后缓慢升至设计压力，确认无泄漏→升压至试验压力，保压30min→压力降至设计压力的80%→检查",{"key":24,"text":565,"correct":29},"充液后缓慢升至设计压力→确认无泄漏后继续升至试验压力，保压时间不少于30min→然后将压力降至试验压力的80%→对所有焊接接头和连接部分进行检查。",{"key":27,"text":567,"correct":22},"充液后缓慢升至试验压力，确认无泄漏→保压30min→压力降至试验压力的80%→检查",{"key":31,"text":569,"correct":22},"充液后缓慢升至设计压力，确认无泄漏→升压至试验压力，保压10min→压力降至操作压力的80%→检查",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},1135776,"吊车梁和吊车桁架安装就位后不应有（）。",[574,576,578,580],{"key":20,"text":575,"correct":29},"下挠",{"key":24,"text":577,"correct":22},"上挠",{"key":27,"text":579,"correct":22},"侧弯",{"key":31,"text":581,"correct":22},"扭曲",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1135777,"下列钢结构安装程序中，正确的是（）。",[586,588,590,592],{"key":20,"text":587,"correct":29},"钢柱安装→支撑安装→梁安装→平台板、钢梯、防护栏安装→其他构件安装",{"key":24,"text":589,"correct":22},"钢柱安装→梁安装→平台板、钢梯、栏杆安装→支撑安装→其他构件安装",{"key":27,"text":591,"correct":22},"支撑安装→钢柱安装→梁安装→平台板、钢梯、栏杆安装→其他构件安装",{"key":31,"text":593,"correct":22},"钢柱安装→支撑安装→平台板、钢梯、栏杆安装→梁安装→其他构件安装",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},1135778,"高强度大六角头螺栓连接副在终拧完成1h后、24h内进行终拧扭矩检查，可采用的方法是（）。",[598,600,602,604],{"key":20,"text":599,"correct":29},"扭矩法",{"key":24,"text":601,"correct":22},"统计扭断梅花卡头的螺栓数",{"key":27,"text":603,"correct":22},"冲击法",{"key":31,"text":605,"correct":22},"拉伸法",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]