[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,7,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,224,236,248,257,269,281,293,305,317,329,341,353,365,374,386,398,410,422,434,446,458,470,482,494,506,518,528,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1135627,1,"单选题","工程竣工后的建筑消防验收，应检查其消防设施配置是否符合（）的要求。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","已获审核批准的消防设计",true,{"key":24,"text":25,"correct":26},"B","工程可投入使用或生产",false,{"key":28,"text":29,"correct":26},"C","建筑防火等级标准",{"key":31,"text":32,"correct":26},"D","公安消防部门管理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1135628,"（）可以在不切断电源的条件下扑救电气火灾，尤其用于那些含油的电气设备火灾，如室内外变压器、油浸开关等火灾。",[38,40,42,44],{"key":20,"text":39,"correct":26},"自动喷水灭火系统",{"key":24,"text":41,"correct":26},"气体灭火系统",{"key":28,"text":43,"correct":22},"干粉灭火系统",{"key":31,"text":45,"correct":26},"泡沫灭火系统",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1135629,"不需要向住房和城乡建设主管部门申请消防验收的工程有（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"国家机关办公楼",{"key":24,"text":53,"correct":26},"邮政楼",{"key":28,"text":55,"correct":22},"45m的公共建筑",{"key":31,"text":57,"correct":26},"建筑总面积大于15000m2的民用机场航站楼",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1135630,"建筑物的消防工程未经验收或验收不合格的，建筑物所有者（）接收使用。",[62,64,66,68],{"key":20,"text":63,"correct":26},"暂时",{"key":24,"text":65,"correct":26},"可以",{"key":28,"text":67,"correct":22},"不得",{"key":31,"text":69,"correct":26},"让步",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1135631,"粗装修消防验收属于消防设施的（）验收，建筑物尚不具备投入使用的条件。",[74,76,78,80],{"key":20,"text":75,"correct":26},"隐蔽性",{"key":24,"text":77,"correct":26},"完整性",{"key":28,"text":79,"correct":26},"工期性",{"key":31,"text":81,"correct":22},"功能性",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1135632,"施工过程验收中把建筑物准备投入使用前的消防验收称（）验收。",[86,88,90,92],{"key":20,"text":87,"correct":26},"粗装修",{"key":24,"text":89,"correct":22},"精装修",{"key":28,"text":91,"correct":26},"隐蔽工程",{"key":31,"text":93,"correct":26},"现场检查",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1135633,"下列自动喷水灭火系统中，（）可用于温度不低于4℃并不高于70℃的场所。",[98,100,102,104],{"key":20,"text":99,"correct":22},"湿式系统",{"key":24,"text":101,"correct":26},"干式系统",{"key":28,"text":103,"correct":26},"雨淋系统",{"key":31,"text":105,"correct":26},"水幕系统",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1135634,"下列泡沫灭火剂中，（）是指体积膨胀小于20倍的泡沫，可用于扑救易燃、可燃液体的火灾或大面积流淌火灾。",[110,112,114,116],{"key":20,"text":111,"correct":22},"低倍数泡沫",{"key":24,"text":113,"correct":26},"中倍数泡沫",{"key":28,"text":115,"correct":26},"超高倍数泡沫",{"key":31,"text":117,"correct":26},"高倍数泡沫",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1135635,"建筑总面积大于（）m3的宾馆和饭店场所，建设单位应当向住房和城乡建设住管部门审核",[122,124,126,128],{"key":20,"text":123,"correct":22},"10000",{"key":24,"text":125,"correct":26},"15000",{"key":28,"text":127,"correct":26},"20000",{"key":31,"text":129,"correct":26},"2500",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1135636,"室内消火栓系统在安装完成后，试射试验一般取有代表性的位置是（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"屋顶取两处",{"key":24,"text":137,"correct":26},"首层取一处",{"key":28,"text":139,"correct":22},"屋顶取一处和首层取两处",{"key":31,"text":141,"correct":26},"屋顶取两处和首层取一处",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1135637,"下列消防设备，不属于自动喷水灭火系统的设备是（）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"报警阀组",{"key":24,"text":149,"correct":26},"水流装置",{"key":28,"text":151,"correct":26},"喷头组件",{"key":31,"text":153,"correct":22},"消火栓箱",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1135638,"火灾自动报警及联动控制系统施工程序中，线缆连接的紧后程序是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"绝缘测试",{"key":24,"text":161,"correct":26},"线缆敷设",{"key":28,"text":163,"correct":26},"设备安装",{"key":31,"text":165,"correct":26},"管线敷设",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1135639,"自动喷水灭火系统施工程序中，减压装置安装的紧后程序是（）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"报警阀安装",{"key":24,"text":173,"correct":22},"报警阀配件及其他组件安装",{"key":28,"text":175,"correct":26},"喷洒头安装",{"key":31,"text":177,"correct":26},"管道冲洗",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1135640,"干粉灭火系统施工程序中，管道安装的紧前程序是（）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"施工准备",{"key":24,"text":185,"correct":26},"吹扫",{"key":28,"text":187,"correct":22},"设备和组件安装",{"key":31,"text":189,"correct":26},"管道试压",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1135641,"消防工程应严格按照经（）审核批准的设计图纸进行施工。",[194,196,198,200],{"key":20,"text":195,"correct":26},"建设单位",{"key":24,"text":197,"correct":26},"设计单位",{"key":28,"text":199,"correct":26},"监理公司",{"key":31,"text":201,"correct":22},"住房和城乡建设主管部门",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1135642,"消防验收的结论评定程序要形成（）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"消防设施技术测试报告",{"key":24,"text":209,"correct":22},"消防验收意见书",{"key":28,"text":211,"correct":26},"消防工程整改通知单",{"key":31,"text":213,"correct":26},"工程移交清单",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1135643,"在自动喷水灭火系统施工中，干管安装的紧后工序是（）。",[218,220,222,223],{"key":20,"text":219,"correct":26},"支管安装",{"key":24,"text":221,"correct":26},"附件安装",{"key":28,"text":171,"correct":22},{"key":31,"text":177,"correct":26},{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1135644,"下列设备中，属于气体灭火系统的是（）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"贮存容器",{"key":24,"text":231,"correct":26},"发生装置",{"key":28,"text":233,"correct":26},"比例混合器",{"key":31,"text":235,"correct":26},"过滤器",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},1135645,"干式报警装置最大工作压力不超过（）MPa。",[240,242,244,246],{"key":20,"text":241,"correct":26},"1.0",{"key":24,"text":243,"correct":26},"1.1",{"key":28,"text":245,"correct":22},"1.2",{"key":31,"text":247,"correct":26},"1.3",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},1135646,"下列属于闭式喷水灭火系统的是（）。",[252,254,255,256],{"key":20,"text":253,"correct":26},"自动喷水-泡沫联用系统",{"key":24,"text":105,"correct":26},{"key":28,"text":99,"correct":22},{"key":31,"text":103,"correct":26},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":24,"analysis":33},1135647,"压缩机安装宜采用（）。",[261,263,265,267],{"key":20,"text":262,"correct":26},"绝热层基础",{"key":24,"text":264,"correct":22},"框架基础",{"key":28,"text":266,"correct":26},"箱式基础",{"key":31,"text":268,"correct":26},"柱基础",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},1135648,"预埋地脚螺栓检查验收，除验收其中心距外，还应验收（）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"标高",{"key":24,"text":276,"correct":26},"数量",{"key":28,"text":278,"correct":26},"混凝土强度",{"key":31,"text":280,"correct":26},"几何尺寸",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1135649,"基础混凝土不得使用胀锚地脚螺栓的部位是（）。",[285,287,289,291],{"key":20,"text":286,"correct":26},"承载力的部位",{"key":24,"text":288,"correct":26},"突出部位",{"key":28,"text":290,"correct":26},"凹陷部位",{"key":31,"text":292,"correct":22},"有裂缝的部位",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},1135650,"下列叙述错误的是：设备安装精度是指在安装工程中，为保证整套装置正确联动所需的（）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"最终形成生产能力与设计能力的准确度",{"key":24,"text":300,"correct":26},"各独立设备之间的位置精度",{"key":28,"text":302,"correct":26},"单台设备重现设备的制造精度",{"key":31,"text":304,"correct":26},"整台设备运行中的运行精度",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1135651,"广泛应用于设备安装的基础是（）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"大块式",{"key":24,"text":312,"correct":26},"箱式",{"key":28,"text":314,"correct":26},"框架式",{"key":31,"text":316,"correct":26},"扩展式",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},1135652,"沉井基础是用钢筋混凝土或（）制成的井箱式基础。",[321,323,325,327],{"key":20,"text":322,"correct":22},"混凝土",{"key":24,"text":324,"correct":26},"预制的钢筋混凝土柱",{"key":28,"text":326,"correct":26},"工字钢",{"key":31,"text":328,"correct":26},"大口径钢管",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1135653,"安装胀锚地脚螺栓的基础混凝土强度不得小于（）MPa。",[333,335,337,339],{"key":20,"text":334,"correct":26},"8",{"key":24,"text":336,"correct":22},"10",{"key":28,"text":338,"correct":26},"12",{"key":31,"text":340,"correct":26},"15",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},1135654,"重要的设备基础应用重锤做（）试验。",[345,347,349,351],{"key":20,"text":346,"correct":26},"沉降",{"key":24,"text":348,"correct":22},"预压强度",{"key":28,"text":350,"correct":26},"刚度",{"key":31,"text":352,"correct":26},"冲击",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1135655,"整体安装时将设备整体运输到安装现场，将其直接安装到（）的位置。",[357,359,361,363],{"key":20,"text":358,"correct":22},"设计指定",{"key":24,"text":360,"correct":26},"建设方指定",{"key":28,"text":362,"correct":26},"规范规定",{"key":31,"text":364,"correct":26},"施工方案",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":20,"analysis":33},1135656,"球磨机施工宜采用（）基础。",[369,370,371,372],{"key":20,"text":310,"correct":22},{"key":24,"text":312,"correct":26},{"key":28,"text":314,"correct":26},{"key":31,"text":373,"correct":26},"沉井式",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},1135657,"机械设备安装的一般施工程序中，设备基础检查验收的紧后程序是（）。",[378,380,382,384],{"key":20,"text":379,"correct":26},"基础放线",{"key":24,"text":381,"correct":26},"设备开箱检查",{"key":28,"text":383,"correct":26},"安装精度调整与检测",{"key":31,"text":385,"correct":22},"垫铁设置",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},1135658,"联轴器装配时,下列不测量的参数是（）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"轴向间隙",{"key":24,"text":393,"correct":26},"径向位移",{"key":28,"text":395,"correct":26},"端面间隙",{"key":31,"text":397,"correct":26},"两轴线倾斜",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":20,"analysis":33},1135659,"机械设备安装工程中，生产线的纵、横向中心线以及主要设备的中心线应埋设（）的中心线标板，使安装施工和生产后的维修均有可靠的依据。",[402,404,406,408],{"key":20,"text":403,"correct":22},"永久性",{"key":24,"text":405,"correct":26},"验收期",{"key":28,"text":407,"correct":26},"临时性",{"key":31,"text":409,"correct":26},"观察期",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":31,"analysis":33},1135660,"机电工程设备基础种类中，适用于承受荷载较小、变形不大的设备基础是（）。",[414,416,418,420],{"key":20,"text":415,"correct":26},"钢筋混凝土基础",{"key":24,"text":417,"correct":26},"框架式基础",{"key":28,"text":419,"correct":26},"砂垫层基础",{"key":31,"text":421,"correct":22},"素混凝土基础",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":28,"analysis":33},1135661,"下列适用于采用联合基础的设备是（）。",[426,428,430,432],{"key":20,"text":427,"correct":26},"常减压塔",{"key":24,"text":429,"correct":26},"旋窑",{"key":28,"text":431,"correct":22},"轧机",{"key":31,"text":433,"correct":26},"变压器",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":28,"analysis":33},1135662,"设备安装时，所有设备安装的平面位置和标高，均应以（）为基准进行测量。",[438,440,442,444],{"key":20,"text":439,"correct":26},"车间的实际位置和标高",{"key":24,"text":441,"correct":26},"设备的实际几何尺寸",{"key":28,"text":443,"correct":22},"全厂确定的基准线和基准点",{"key":31,"text":445,"correct":26},"土建交付安装的中心线和标高",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":31,"analysis":33},1135663,"大型储罐适宜于采用（）基础。",[450,452,454,456],{"key":20,"text":451,"correct":26},"素混凝土",{"key":24,"text":453,"correct":26},"钢筋混凝土",{"key":28,"text":455,"correct":26},"钢结构",{"key":31,"text":457,"correct":22},"砂垫层",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1135664,"下列设备基础需要做预压强度试验的是（）。",[462,464,466,468],{"key":20,"text":463,"correct":26},"电机",{"key":24,"text":465,"correct":26},"压缩机",{"key":28,"text":467,"correct":26},"泵",{"key":31,"text":469,"correct":22},"汽轮发动机组",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1135665,"设备安装允许有一定的偏差，需合理确定偏差及其方向。当设备技术文件中无规定时，可按相应的原则进行。关于其确定原则的表述错误的是（）。",[474,476,478,480],{"key":20,"text":475,"correct":26},"有利于抵消设备附属件安装后重量的影响",{"key":24,"text":477,"correct":22},"有利于现场施工作业的影响",{"key":28,"text":479,"correct":26},"有利于抵消设备运转时产生的作用力的影响",{"key":31,"text":481,"correct":26},"有利于抵消摩擦面间油膜的影响",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1135666,"精密、大型设备安装基础需要考虑减少基础振幅、减弱基础振动或控制基础沉降等，最适合采用的基础是（）。",[486,488,490,492],{"key":20,"text":487,"correct":26},"扩展基础",{"key":24,"text":489,"correct":22},"桩基础",{"key":28,"text":491,"correct":26},"联合基础",{"key":31,"text":493,"correct":26},"沉井基础",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},1135667,"机械设备安装的施工程序为开箱检查→基础放线→（）→调整与试运转→工程验收。",[498,500,502,504],{"key":20,"text":499,"correct":26},"设备基础检验→垫铁设置→设备吊装就位→设备固定与灌浆→精度检测与调整→零部件装配→润滑与设备加油",{"key":24,"text":501,"correct":22},"设备基础检验→垫铁设置→设备吊装就位→精度检测与调整→设备固定与灌浆→零部件装配→润滑与设备加油",{"key":28,"text":503,"correct":26},"垫铁设置→设备吊装就位→设备基础检验→精度检测与调整→零部件装配→设备固定与灌浆→润滑与设备加油",{"key":31,"text":505,"correct":26},"垫铁设置→设备吊装就位→设备基础检验→精度检测与调整→设备固定与灌浆→零部件装配→润滑与设备加油",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},1135668,"提高安装精度应根据设备的设计精度和（），选用适当合理的装配和调整方法。",[510,512,514,516],{"key":20,"text":511,"correct":26},"施工装备的能力",{"key":24,"text":513,"correct":26},"测量检测手段",{"key":28,"text":515,"correct":22},"设备结构特点",{"key":31,"text":517,"correct":26},"施工环境和施工顺序",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1135669,"机电设备安装程序中，保证机械设备正常运转的必要条件是（）。",[522,523,525,526],{"key":20,"text":385,"correct":26},{"key":24,"text":524,"correct":26},"设备固定与灌浆",{"key":28,"text":383,"correct":26},{"key":31,"text":527,"correct":22},"润滑与设备加油",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},1135670,"下列机械设备基础中，适用于使用后允许产生沉降结构的是（）基础。",[532,534,536,537],{"key":20,"text":533,"correct":22},"垫层",{"key":24,"text":535,"correct":26},"扩展",{"key":28,"text":453,"correct":26},{"key":31,"text":451,"correct":26},{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1135671,"关于齿轮装配要求说法，错误的是（）。",[542,544,546,548],{"key":20,"text":543,"correct":26},"齿轮装配时，齿轮基准面端面与轴肩或定位套端面应靠紧贴合，且用0.05mm塞尺检查不应塞入",{"key":24,"text":545,"correct":22},"齿轮装配时，齿轮基准面端面与轴肩或定位套端面应靠紧贴合，且用0.06mm塞尺检查不应塞入",{"key":28,"text":547,"correct":26},"齿宽B＞100mm时，轴向错位应≤5mm",{"key":31,"text":549,"correct":26},"齿宽B&le;100mm时，轴向错位应&le;5mm",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1135672,"机械设备典型零部件安装是机械设备安装方法的重要组成部分，但不包括（）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"联轴器的安装",{"key":24,"text":557,"correct":26},"气压元件安装",{"key":28,"text":559,"correct":26},"液压元件的安装",{"key":31,"text":561,"correct":22},"常温下螺纹连接件的装配",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},1135673,"基础裂纹处，不宜采用（）地脚螺栓。",[566,568,570,572],{"key":20,"text":567,"correct":26},"固定",{"key":24,"text":569,"correct":26},"活动",{"key":28,"text":571,"correct":26},"粘接",{"key":31,"text":573,"correct":22},"胀锚",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":24,"analysis":33},1135674,"解体的大型减速机安装时，一次灌浆应在（）进行。",[578,580,582,584],{"key":20,"text":579,"correct":26},"底座就位后",{"key":24,"text":581,"correct":22},"底座粗找正后",{"key":28,"text":583,"correct":26},"整体精找正后",{"key":31,"text":585,"correct":26},"底座精找正后",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1135675,"绝热层基础是在基础的（）设置隔热保温层。",[590,592,594,596],{"key":20,"text":591,"correct":26},"顶部",{"key":24,"text":593,"correct":22},"底部",{"key":28,"text":595,"correct":26},"中部",{"key":31,"text":597,"correct":26},"周围",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":31,"analysis":33},1135676,"减振基础和绝热基础是按（）而划分的。",[602,604,606,608],{"key":20,"text":603,"correct":26},"组成材料",{"key":24,"text":605,"correct":26},"埋置深度",{"key":28,"text":607,"correct":26},"结构形式",{"key":31,"text":609,"correct":22},"使用功能不同",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]