[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-41":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":328},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,41,50,2021,[13,38,53,68,83,98,112,127,141,155,170,185,199,214,229,243,258,272,286,301,313],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1137367,2,"多选题","（2016年真题）氧气管道上仪表取源部件的安装要求有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","取源部件的焊接部件应在管道预制时安装",true,{"key":24,"text":25,"correct":22},"B","应脱脂合格后安装取源部件",{"key":27,"text":28,"correct":22},"C","不应在管道的焊缝上开孔安装",{"key":30,"text":31,"correct":32},"D","在管道防腐完成后开孔安装",false,{"key":34,"text":35,"correct":32},"E","取源部件与管道同时进行试压","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1137368,"（2015年真题）复合层涂层防腐施工时，涂底漆前应对（ ）部位加以保护。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"焊缝",{"key":24,"text":45,"correct":22},"螺纹",{"key":27,"text":47,"correct":22},"焊接坡口",{"key":30,"text":49,"correct":22},"标识",{"key":34,"text":51,"correct":32},"弯头","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1137369,"（2015年真题）采取浇注法进行绝热层施工的要求有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"每次配料必须在规定时间内用完",{"key":24,"text":60,"correct":32},"应提前制作试块（同时）",{"key":27,"text":62,"correct":22},"浇注时宜一次浇注成型",{"key":30,"text":64,"correct":22},"大面积浇注时，应设对称多浇口",{"key":34,"text":66,"correct":22},"间断浇注时，施工缝宜留在伸缩缝的位置上","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1137371,"（2019年真题）国际机电项目实施中的自身风险包括（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"技术风险",{"key":24,"text":75,"correct":22},"管理风险",{"key":27,"text":77,"correct":32},"财经风险",{"key":30,"text":79,"correct":32},"法律风险",{"key":34,"text":81,"correct":22},"营运风险","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1137372,"（2018年真题）设备采购监造时，停工待检点应包括（ ）",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"重要工序节点",{"key":24,"text":90,"correct":22},"隐蔽工程",{"key":27,"text":92,"correct":32},"设备性能重要的相关检验",{"key":30,"text":94,"correct":22},"不可重复试验的验收点",{"key":34,"text":96,"correct":22},"关键试验的验收点","ABDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1137373,"（2017年真题）设备监造的内容有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"审查制造单位的质量保证体系",{"key":24,"text":105,"correct":22},"审查原材料的质量证明书和复检报告",{"key":27,"text":107,"correct":22},"现场见证制造加工工艺",{"key":30,"text":109,"correct":32},"监督设备的集结和运输",{"key":34,"text":111,"correct":32},"施工现场设备的检验和试验",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1137374,"（2018年真题）多个施工方案进行经济合理性比较时，其内容包括（ ）",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"资金时间价值",{"key":24,"text":119,"correct":32},"技术效率",{"key":27,"text":121,"correct":32},"实施的安全性",{"key":30,"text":123,"correct":22},"对环境影响的损失",{"key":34,"text":125,"correct":22},"综合性价比","ADE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":36,"analysis":37},1137375,"（2017年真题）关于材料进场验收要求的说法，正确的有（ ）",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"要求进场复验的材料应有取样送检证明报告",{"key":24,"text":134,"correct":22},"验收工作应按质量验收规范和计量检测规定进行",{"key":27,"text":136,"correct":22},"验收内容应完整，验收要做好记录，办理验收手续",{"key":30,"text":138,"correct":32},"甲供的材料只做好标记",{"key":34,"text":140,"correct":32},"对不符合计划要求的材料可暂缓接受",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":126,"analysis":37},1137376,"（2018年真题）工厂模块化预制技术的应用，实现了建筑机电安装工程的（ ）",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"安装标准化",{"key":24,"text":148,"correct":32},"施工程序化",{"key":27,"text":150,"correct":32},"作业流水化",{"key":30,"text":152,"correct":22},"产品模块化",{"key":34,"text":154,"correct":22},"产品集成化",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1137377,"（2018年真题）机电工程施工进度计划安排中的制约因素有（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"工程实体现状",{"key":24,"text":162,"correct":22},"设备材料进场时机",{"key":27,"text":164,"correct":22},"安装工艺规律",{"key":30,"text":166,"correct":22},"施工作业人员配备",{"key":34,"text":168,"correct":32},"施工监理方法","ABCD",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1137378,"（2018年真题）压缩机（单机）在空气负荷试运行后，正确的做法有（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"排除气路和气罐中剩余压力",{"key":24,"text":177,"correct":32},"排除进气管及冷凝器的空气",{"key":27,"text":179,"correct":22},"清洗油过滤器和更换润滑油",{"key":30,"text":181,"correct":22},"排除气缸及管路中的冷凝液",{"key":34,"text":183,"correct":32},"检查曲轴箱应停机 5min 后","ACD",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":97,"analysis":37},1137379,"（2012年真题）工业安装工程分项工程质量验收记录填写的主要内容有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"检验项目",{"key":24,"text":192,"correct":22},"施工单位检验结果",{"key":27,"text":194,"correct":32},"设计单位验收结论",{"key":30,"text":196,"correct":22},"监理单位验收结论",{"key":34,"text":198,"correct":22},"建设单位验收结论",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1137380,"（2014年真题）工业管道按介质划分应视为主要分项工程的有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":32},"压缩空气管道",{"key":24,"text":206,"correct":22},"煤气管道",{"key":27,"text":208,"correct":32},"冷凝水管道",{"key":30,"text":210,"correct":22},"天然气管道",{"key":34,"text":212,"correct":22},"氧气管道","BDE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1137381,"（2011年真题）工业安装工程按专业划分的分部工程包括（ ）等",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"工业炉砌筑工程",{"key":24,"text":221,"correct":32},"设备基础工程",{"key":27,"text":223,"correct":22},"自动化仪表安装工程",{"key":30,"text":225,"correct":32},"消防工程",{"key":34,"text":227,"correct":22},"设备及管道绝热工程","ACE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":213,"analysis":37},1137382,"（2014年真题）建筑安装工程检验批主控项目有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":32},"对卫生、环境保护有较大影响的检验项目",{"key":24,"text":236,"correct":22},"确定该检验批主要性能的项目",{"key":27,"text":238,"correct":32},"无法定量采用定性的项目",{"key":30,"text":240,"correct":22},"管道的压力试验",{"key":34,"text":242,"correct":22},"保证安全和使用功能的重要检验项目",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},1137383,"（2015年真题）建筑安装单位工程质量验收记录填写主要内容有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":32},"施工试验记录",{"key":24,"text":250,"correct":32},"隐藏工程验收记录",{"key":27,"text":252,"correct":32},"试运转记录",{"key":30,"text":254,"correct":22},"分部工程验收记录",{"key":34,"text":256,"correct":22},"质量控制资料验收记录","DE",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":52,"analysis":37},1137384,"（2012年真题）下列建筑安装工程检验项目，属于主控项目的检验内容有（ ）",[262,264,266,268,270],{"key":20,"text":263,"correct":32},"管道接口外露油麻",{"key":24,"text":265,"correct":22},"管道压力试验",{"key":27,"text":267,"correct":22},"风管系统测定",{"key":30,"text":269,"correct":22},"电梯保护装置",{"key":34,"text":271,"correct":32},"卫生器具启闭灵活",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":126,"analysis":37},1137385,"（2011年真题）工程开工前，项目部编制“计量检测设备配备计划书”的依据是（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"施工组织设计",{"key":24,"text":279,"correct":32},"计量检测设备使用说明书",{"key":27,"text":281,"correct":32},"作业指导书",{"key":30,"text":283,"correct":22},"质量计划",{"key":34,"text":285,"correct":22},"施工方案",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":300,"analysis":37},1137386,"（2012年真题）下列设备中，属于特种设备的有（ ）",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"6 层 6 站乘客电梯",{"key":24,"text":293,"correct":22},"水压 1MPa 的热水锅炉",{"key":27,"text":295,"correct":22},"工作压力 1.0MPa·L 的气瓶",{"key":30,"text":297,"correct":32},"35KV 变压器",{"key":34,"text":299,"correct":22},"30t 桥式起重机","ABCE",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":184,"analysis":37},1137387,"（2015年真题）按国家制定实施首检的起重机械目录规定，下列起重机械中实施首检的是（ ）",[305,307,309,311],{"key":20,"text":306,"correct":22},"流动式起重机",{"key":24,"text":308,"correct":32},"塔式起重机",{"key":27,"text":310,"correct":22},"桥式起重机",{"key":30,"text":312,"correct":22},"桅杆起重机",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":327,"analysis":37},1137388,"（2013年真题）压力容器按类别划分为Ⅰ、Ⅱ、Ⅲ类的依据有（ ）",[317,319,321,323,325],{"key":20,"text":318,"correct":32},"容器品种",{"key":24,"text":320,"correct":22},"设计压力",{"key":27,"text":322,"correct":22},"介质特性",{"key":30,"text":324,"correct":32},"重量",{"key":34,"text":326,"correct":22},"容积","BCE",[329,333,336,339,342,345],{"id":330,"name":331,"category":7,"favorite":332},1,"领导干部任职前廉政法规知识测试题",92,{"id":334,"name":335,"category":7,"favorite":330},595,"建筑结构与设备",{"id":337,"name":338,"category":7,"favorite":330},715,"招标采购专业知识与法律法规",{"id":340,"name":341,"category":7,"favorite":330},848,"市政方向-通用基础",{"id":343,"name":344,"category":7,"favorite":8},534,"BIM工程师",{"id":346,"name":344,"category":7,"favorite":8},535]