[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-40":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,40,50,2021,[13,38,53,67,81,96,110,125,140,154,168,183,198,213,228,243,257,272,287,302,316,331,345,359,371,386,401,415,429,443,457,471,485,499,513,527,541,555,570,584,598,612,626,640,654,668,682,696,710,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1137316,2,"多选题","（2012年真题）高层建筑管道工程采取的防震降噪的保证措施有（ ）",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","水泵与基础间加设橡胶垫隔离",true,{"key":24,"text":25,"correct":26},"B","给水系统中加设减压设备",false,{"key":28,"text":29,"correct":22},"C","管路中加设柔性连接",{"key":31,"text":32,"correct":26},"D","管道增设支吊架",{"key":34,"text":35,"correct":26},"E","减少给水系统管路的连接件","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1137317,"（2019年真题）下列关于中水管道系统的描述，正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"中水给水管应采用耐腐蚀材质的管道",{"key":24,"text":45,"correct":22},"中水管道外壁应涂浅绿色标志",{"key":28,"text":47,"correct":26},"中水给水管道装设取水嘴",{"key":31,"text":49,"correct":22},"中水管道不宜暗装于墙体和楼板内",{"key":34,"text":51,"correct":22},"绿化用水应采用地下给水栓","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},1137318,"（2018年真题）关于中水给水系统的安装要求，正确的有（ ）。",[57,59,61,62,64],{"key":20,"text":58,"correct":26},"中水管道每层需装设一个水嘴",{"key":24,"text":60,"correct":22},"便器冲洗宜采用密闭型器具",{"key":28,"text":45,"correct":22},{"key":31,"text":63,"correct":22},"中水管道不宜暗装于墙体内",{"key":34,"text":65,"correct":26},"中水箱可与生活水箱紧靠放置","BCD",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":52,"analysis":37},1137319,"（2020年真题）关于建筑室内给水管道支吊架安装的说法，正确的有()。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"滑动支架的滑托与滑槽应有3~5mm间隙",{"key":24,"text":74,"correct":22},"无热伸长管道的金属管道吊架应垂直安装",{"key":28,"text":76,"correct":26},"有热伸长管道的吊架应向热膨胀方向偏移",{"key":31,"text":78,"correct":22},"6m高楼层的金属立管管卡每层不少于2个",{"key":34,"text":80,"correct":22},"塑料管道与金属支架之间应加衬非金属垫",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":95,"analysis":37},1137320,"（2019年真题）关于灯具现场检查的重点，下列说法正确的是（ ）。",[85,87,89,91,93],{"key":20,"text":86,"correct":22},"Ⅰ类灯具的外漏可导电部分应具有专用的 PE 端子",{"key":24,"text":88,"correct":22},"消防灯具应具有认证标志",{"key":28,"text":90,"correct":22},"灯具内部接线应为铜芯绝缘导线",{"key":31,"text":92,"correct":26},"灯具的绝缘电阻值不应小于 0.5MΩ",{"key":34,"text":94,"correct":26},"灯具内绝缘导线的绝缘层厚度应小于 0.6mm","ABC",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":95,"analysis":37},1137321,"（2014年真题）常用作垂直埋设的人工接地体有（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"镀锌角钢",{"key":24,"text":103,"correct":22},"镀锌钢管",{"key":28,"text":105,"correct":22},"镀锌圆钢",{"key":31,"text":107,"correct":26},"底板钢板",{"key":34,"text":109,"correct":26},"桩基钢筋",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},1137322,"（2017年真题）关于线槽配线，导管配线施工技术要求的说法，正确的是（ ）",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"线槽内导线总截面积不应大于线槽内截面积的 60%",{"key":24,"text":117,"correct":26},"金属线槽应可靠接地或接零，应作为设备的接地导体",{"key":28,"text":119,"correct":22},"导线敷设后，其线路绝缘电阻测试值应大于 0.5MΩ",{"key":31,"text":121,"correct":26},"埋入建筑物的电线保护管，与建筑物表面的距离不应大于 10mm",{"key":34,"text":123,"correct":22},"管内导线的总截面积不应大于管内空截面积的 40%","ACE",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1137323,"（2018年真题）下列灯具中，需要与保护导体连接的有（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"离地 5m 的Ⅰ类灯具",{"key":24,"text":132,"correct":26},"采用 36V 供电的灯具",{"key":28,"text":134,"correct":26},"地下一层的Ⅱ类灯具",{"key":31,"text":136,"correct":22},"等电位连接的灯具",{"key":34,"text":138,"correct":26},"采取电气隔离的灯具","AD",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":52,"analysis":37},1137324,"（2020年真题）关于建筑电气工程母线槽安装的说法，正确的有()。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"绝缘测试应在母线槽安装前后分别进行",{"key":24,"text":147,"correct":22},"照明母线槽的垂直偏差不应大于10mm",{"key":28,"text":149,"correct":26},"母线槽接口穿越楼板处应设置补偿装置",{"key":31,"text":151,"correct":22},"母线槽连接部件应与本体防护等级一致",{"key":34,"text":153,"correct":22},"母线槽连接处的接触电阻应小于0.1Ω",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":95,"analysis":37},1137325,"（2018年真题）下列风管系统安装检查项目，属于主控项目的有（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"风管支架预埋件的位置",{"key":24,"text":161,"correct":22},"风管穿过防火墙体的套管",{"key":28,"text":163,"correct":22},"风管防静电的接地装置",{"key":31,"text":165,"correct":26},"风管水平安装的吊架间距",{"key":34,"text":167,"correct":26},"风管法兰螺栓连接方向",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":37},1137327,"（2015年真题）净化空气系统调试和试运行应具备的条件有（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"洁净室建筑装饰验收合格",{"key":24,"text":175,"correct":22},"各种线管吹扫及试压完成",{"key":28,"text":177,"correct":22},"空调设备系统联动完成",{"key":31,"text":179,"correct":26},"高效过滤器安装完成",{"key":34,"text":181,"correct":22},"风量、风压平衡完成","ABCE",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1137328,"（2014年真题）空调系统中，应进行单机试运转调试的设备有（ ）",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"空气处理机组",{"key":24,"text":190,"correct":26},"板式换热器",{"key":28,"text":192,"correct":26},"分集水器",{"key":31,"text":194,"correct":22},"电动排烟阀",{"key":34,"text":196,"correct":22},"热泵机","ADE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},1137329,"（2011年真题）空调与通风系统调试时，主要考核的设计指标有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"空气温度",{"key":24,"text":205,"correct":22},"相对湿度",{"key":28,"text":207,"correct":22},"气流速度",{"key":31,"text":209,"correct":22},"噪声",{"key":34,"text":211,"correct":26},"空气含氧量","ABCD",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1137330,"（2016年真题）通风与空调系统的节能性能检测项目有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"室内温度",{"key":24,"text":220,"correct":26},"室内湿度",{"key":28,"text":222,"correct":22},"风口风量",{"key":31,"text":224,"correct":22},"冷热水总流量",{"key":34,"text":226,"correct":22},"冷却水总流量","ACDE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},1137331,"（2020年真题）关于空调风管及管道绝热施工要求的说法，正确的有()。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"风管的绝热层可以采用橡塑绝热材料",{"key":24,"text":235,"correct":26},"制冷管道的绝热应在防腐处理前进行",{"key":28,"text":237,"correct":22},"水平管道的纵向缝应位于管道的侧面",{"key":31,"text":239,"correct":22},"风管及管道的绝热防潮层应封闭良好",{"key":34,"text":241,"correct":26},"多重绝热层施工的层间拼接缝应一致","ACD",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":95,"analysis":37},1137332,"（2014年真题）入侵报警探测器的安装位置和安装高度应根据（ ）来确定安装点",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"产品特性",{"key":24,"text":250,"correct":22},"警戒范围",{"key":28,"text":252,"correct":22},"环境影响",{"key":31,"text":254,"correct":26},"尺寸大小",{"key":34,"text":256,"correct":26},"支架底座",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1137333,"（2018年真题）关于建筑智能化系统调试检测的说法，正确的有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"建筑智能化系统调试工作应由项目专业技术负责人主持",{"key":24,"text":264,"correct":26},"系统检测程序应是分部工程→子分部工程→分项工程",{"key":28,"text":266,"correct":26},"系统试运行工作应在智能化系统检测完成后进行",{"key":31,"text":268,"correct":26},"系统检测汇总记录应由监理工程师填写并做出检测结论",{"key":34,"text":270,"correct":22},"系统检测方案经项目监理工程师批准后可以实施","AE",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},1137334,"（2019年真题）公共广播系统的检测关注的重点参数包括（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"声场不均衡度",{"key":24,"text":279,"correct":22},"漏出声衰减",{"key":28,"text":281,"correct":26},"播放警示信号",{"key":31,"text":283,"correct":22},"设备信噪比",{"key":34,"text":285,"correct":26},"设备相应时间","ABD",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},1137335,"（2013年真题）调节阀中的电动执行机构的输出方式有（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"直行程",{"key":24,"text":294,"correct":22},"角行程",{"key":28,"text":296,"correct":26},"步进式",{"key":31,"text":298,"correct":26},"开关式",{"key":34,"text":300,"correct":22},"多转式","ABE",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":95,"analysis":37},1137336,"（2020年真题）建筑智能化工程中的接口技术文件内容包括()。",[306,308,310,312,314],{"key":20,"text":307,"correct":22},"通信协议",{"key":24,"text":309,"correct":22},"责任边界",{"key":28,"text":311,"correct":22},"数据流向",{"key":31,"text":313,"correct":26},"结果评判",{"key":34,"text":315,"correct":26},"链路搭接",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":330,"analysis":37},1137337,"（2017年真题）自动喷水灭火系统的总出水管上应安装（ ）。",[320,322,324,326,328],{"key":20,"text":321,"correct":26},"过滤器",{"key":24,"text":323,"correct":26},"止回阀",{"key":28,"text":325,"correct":26},"多功能水泵控制阀",{"key":31,"text":327,"correct":22},"泄压阀",{"key":34,"text":329,"correct":22},"压力表","DE",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":139,"analysis":37},1137338,"（2013年真题）下列机械设备中，需严格控制环境温度来保证安装精度的有（ ）。",[335,337,339,341,343],{"key":20,"text":336,"correct":22},"2050mm 薄板冷连轧机",{"key":24,"text":338,"correct":26},"中型离心式鼓风机",{"key":28,"text":340,"correct":26},"中央空调机组",{"key":31,"text":342,"correct":22},"数控机床",{"key":34,"text":344,"correct":26},"1200mm 胶带输送机",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":66,"analysis":37},1137339,"（2016年真题）电机与减速机联轴器找正时，需测量的参数包括（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":26},"径向间隙",{"key":24,"text":352,"correct":22},"两轴心径向位移",{"key":28,"text":354,"correct":22},"端面间隙",{"key":31,"text":356,"correct":22},"两轴线倾斜",{"key":34,"text":358,"correct":26},"联轴器外径",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":197,"analysis":37},1137340,"（2019年真题）机械设备联轴器装配时，需要测量的项目有（ ）。",[363,364,366,368,369],{"key":20,"text":352,"correct":22},{"key":24,"text":365,"correct":26},"外径光洁度",{"key":28,"text":367,"correct":26},"联轴器的外径圆度",{"key":31,"text":356,"correct":22},{"key":34,"text":370,"correct":22},"联轴器的端面间隙",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},1137341,"（2014年真题）影响设备安装精度的测量因素有（ ）",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"零部件装配精度",{"key":24,"text":378,"correct":22},"施测人员技能",{"key":28,"text":380,"correct":26},"设备制造精度",{"key":31,"text":382,"correct":22},"设备检测基准精度",{"key":34,"text":384,"correct":22},"测量仪器精度","BDE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},1137342,"（2012年真题）胀锚地脚螺栓安装时，符合施工要求的有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":26},"螺栓中心距基础边缘的距离不小于 5 倍的胀锚螺栓直径",{"key":24,"text":393,"correct":26},"安装胀锚螺栓的基础强度不得大于 10MPa",{"key":28,"text":395,"correct":22},"钻孔处不得有裂缝",{"key":31,"text":397,"correct":22},"钻孔的钻头不应与基础中的钢筋相碰",{"key":34,"text":399,"correct":22},"钻孔直径和深度应与胀锚地脚螺栓相匹配","CDE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":197,"analysis":37},1137343,"（2015年真题）安装精度调整与检测中，属于形状误差的有（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"圆柱度",{"key":24,"text":408,"correct":26},"平行度",{"key":28,"text":410,"correct":26},"垂直度",{"key":31,"text":412,"correct":22},"平面度",{"key":34,"text":414,"correct":22},"直线度",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":301,"analysis":37},1137344,"（2020年真题）机械设备润滑的主要作用有()。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"降低温度",{"key":24,"text":422,"correct":22},"减少摩擦",{"key":28,"text":424,"correct":26},"减少振动",{"key":31,"text":426,"correct":26},"提高精度",{"key":34,"text":428,"correct":22},"延长寿命",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":242,"analysis":37},1137345,"（2019年真题）下列关于油浸式电力变压器二次搬运和就位的说法，正确的是（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"变压器可采用滚杠及卷扬机拖运的运输方式",{"key":24,"text":436,"correct":26},"顶盖气体继电器气流方向有 0.5％的坡度",{"key":28,"text":438,"correct":22},"就位后将滚轮用能拆卸的制动装置固定",{"key":31,"text":440,"correct":22},"二次搬运时变压器倾斜角不得超过 15°",{"key":34,"text":442,"correct":26},"可采用变压器顶盖上部吊环吊装变压器",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":124,"analysis":37},1137346,"（2015年真题）380V 电动机试运行前检查内容有（ ）。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"电动机绕组的绝缘电阻",{"key":24,"text":450,"correct":26},"电动机的地脚螺栓是否接地",{"key":28,"text":452,"correct":22},"电动机的保护接地线是否连接可靠",{"key":31,"text":454,"correct":26},"电动机的温度是否有过热现象",{"key":34,"text":456,"correct":22},"绕线式电动机的滑环和电刷",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":330,"analysis":37},1137347,"（2014年真题）三相交流异步电动机要减小启动电流并增加启动转矩，可采用的启动方式为（ ）",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"定子串接电抗器启动",{"key":24,"text":464,"correct":26},"自耦降压启动器启动",{"key":28,"text":466,"correct":26},"Y-A 降压启动器启动",{"key":31,"text":468,"correct":22},"转子串接电阻启动",{"key":34,"text":470,"correct":22},"频敏变阻器启动",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":197,"analysis":37},1137348,"（2016年真题）关于电缆排管敷设要求的说法，正确的有（ ）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"非管孔径应不小于电力电缆外径的 1.5 倍",{"key":24,"text":478,"correct":26},"埋入地下的电力排管至地面距离应不小于 0.4m",{"key":28,"text":480,"correct":26},"交流三芯电力电缆不得单独穿入钢管内",{"key":31,"text":482,"correct":22},"敷设电力电缆的排管孔径应不小于 100mm",{"key":34,"text":484,"correct":22},"电力排管通向电缆井时应有不小于 0.1%坡度",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":227,"analysis":37},1137349,"（2013年真题）有关于架空线路中导线连接的说法，正确的有（ ）。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"每根导线在一个档距内可以有一个接头",{"key":24,"text":492,"correct":26},"在跨越公路、铁路时可以有一个接头",{"key":28,"text":494,"correct":22},"接头处的机械强度不低于导线自身强度的 90%",{"key":31,"text":496,"correct":22},"接头处的电阻不超过同长度导线电阻的 1.2 倍",{"key":34,"text":498,"correct":22},"不同截面的导线，只能在杆上跳线内连接",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":212,"analysis":37},1137350,"（2016年真题）关于成套配电装置开箱检查注意事项的说法，正确的有（ ）。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"柜内电器、元件和绝缘瓷瓶无损伤和裂纹",{"key":24,"text":506,"correct":22},"备件的供应范围和数量应符合合同要求",{"key":28,"text":508,"correct":22},"柜内的接地线应符合有关技术要求",{"key":31,"text":510,"correct":22},"柜内的关键部件应有产品制造许可证的复印件",{"key":34,"text":512,"correct":26},"柜内的电器和元件均应有合格证的复印件",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":385,"analysis":37},1137351,"（2020年真题）下列接闪器的试验内容中，金属氧化物接闪器应试验的内容有()。",[517,519,521,523,525],{"key":20,"text":518,"correct":26},"测量工频放电电压",{"key":24,"text":520,"correct":22},"测量持续电流",{"key":28,"text":522,"correct":26},"测量交流电导电流",{"key":31,"text":524,"correct":22},"测量泄漏电流",{"key":34,"text":526,"correct":22},"测量工频参考电压",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":197,"analysis":37},1137352,"（2018年真题）工业管道工程交接验收前，建设单位应检查施工单位的技术文件，其中包括（ ）",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"材料代用单",{"key":24,"text":534,"correct":26},"安全阀校验报告",{"key":28,"text":536,"correct":26},"管道元件检查记录",{"key":31,"text":538,"correct":22},"管道安装竣工图",{"key":34,"text":540,"correct":22},"管道元件复验报告",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":212,"analysis":37},1137353,"（2014年真题）高压管道安装前，所用管子、管件及阀门等应具有的质量证明文件包括（ ）",[545,547,549,551,553],{"key":20,"text":546,"correct":22},"材料证明",{"key":24,"text":548,"correct":22},"配件合格证",{"key":28,"text":550,"correct":22},"焊接试样试验结果",{"key":31,"text":552,"correct":22},"焊接登记表",{"key":34,"text":554,"correct":26},"安装试验报告",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":569,"analysis":37},1137354,"（2015年真题）管道系统进行压力试验前，应从待试管道拆下或加以隔离的组成件有（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"调节阀",{"key":24,"text":562,"correct":22},"安全阀",{"key":28,"text":564,"correct":26},"单向阀",{"key":31,"text":566,"correct":26},"膨胀节",{"key":34,"text":568,"correct":22},"爆破片","BE",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":182,"analysis":37},1137355,"（2011年真题）高压管道安装的要求包括（ ）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"管道组成件必须有制造厂质量证明文件",{"key":24,"text":577,"correct":22},"管道支架应按设计图纸施工",{"key":28,"text":579,"correct":22},"管道安装时应使用正式管架固定",{"key":31,"text":581,"correct":26},"安装误差可以通过修改密封垫厚度补偿",{"key":34,"text":583,"correct":22},"管线安装如有间断，应及时封闭管口",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":95,"analysis":37},1137356,"（2019年真题）下列有关于不锈钢工艺管道水冲洗实施要点，正确的是（ ）",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"水中氯离子含量不得超过 25ppm",{"key":24,"text":591,"correct":22},"水冲洗流速不得低于 1.5m\u002Fs",{"key":28,"text":593,"correct":22},"排放管在排水时不得形成负压",{"key":31,"text":595,"correct":26},"排放管径小于被冲洗管径的 60％",{"key":34,"text":597,"correct":26},"冲洗压力应大于管道的设计压力",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":139,"analysis":37},1137357,"（2020年真题）关于管道法兰螺栓安装及紧固的说法，正确的有()。",[602,604,606,608,610],{"key":20,"text":603,"correct":22},"法兰连接螺栓应对称紧固",{"key":24,"text":605,"correct":26},"法兰接头歪斜可强紧螺栓消除",{"key":28,"text":607,"correct":26},"法兰连接螺栓长度应一致",{"key":31,"text":609,"correct":22},"法兰连接螺栓安装方向应一致",{"key":34,"text":611,"correct":26},"热态紧固应在室温下进行",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":139,"analysis":37},1137358,"（2019年真题）关于高强螺栓连接的说法正确的是（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"螺栓连接前应进行摩擦面抗滑移系数复验",{"key":24,"text":619,"correct":26},"不能自由穿入的螺栓孔可采用气割扩孔",{"key":28,"text":621,"correct":26},"高强螺栓初拧和终拧后做好颜色标记",{"key":31,"text":623,"correct":22},"高强螺栓终拧后的螺栓要高出螺母 2~3 扣",{"key":34,"text":625,"correct":26},"扭剪型高强螺栓的拧紧应采用扭矩法",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":197,"analysis":37},1137359,"（2016年真题）金属罐中幅板搭接接头采用手工焊接时，控制焊接变形的主要工艺措施有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"先焊短焊缝，后焊长焊缝",{"key":24,"text":633,"correct":26},"焊工均匀分布，同向分段焊接",{"key":28,"text":635,"correct":26},"焊工均匀分布，对称施焊",{"key":31,"text":637,"correct":22},"初层焊道采用分段退焊法",{"key":34,"text":639,"correct":22},"初层焊道采用跳焊法",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":95,"analysis":37},1137360,"（2020年真题）关于高强度螺栓连接紧固的说法，正确的有()。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"紧固用的扭矩扳手在使用前应校正",{"key":24,"text":647,"correct":22},"高强度螺栓安装的穿入方向应一致",{"key":28,"text":649,"correct":22},"高强度螺栓的拧紧宜在24h内完成",{"key":31,"text":651,"correct":26},"施拧宜由螺栓群一侧向另一侧拧紧",{"key":34,"text":653,"correct":26},"高强度螺栓的拧紧应一次完成终拧",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":385,"analysis":37},1137361,"（2012年真题）在厂房内吊装大型发电机定子的方法通常有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"大型流动式起重机组合吊装",{"key":24,"text":661,"correct":22},"液压提升装置吊装",{"key":28,"text":663,"correct":26},"液压顶升平移吊装",{"key":31,"text":665,"correct":22},"专用吊装架吊装",{"key":34,"text":667,"correct":22},"桥式起重机改装系统吊装",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":242,"analysis":37},1137362,"（2018年真题）光伏发电工程施工时，汇流箱内的光伏组件串电缆接引前的要求有（ ）",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"光伏组件侧有明显断开点",{"key":24,"text":675,"correct":26},"光伏组件侧电缆已连接",{"key":28,"text":677,"correct":22},"汇流箱内所有开关已断开",{"key":31,"text":679,"correct":22},"逆变器侧有明显断开点",{"key":34,"text":681,"correct":26},"光伏组件间的插件已连接",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":52,"analysis":37},1137363,"（2014年真题）大型汽轮机低压外下缸体前段和后段组合找中心时，可作为基准的有（ ）",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"激光",{"key":24,"text":689,"correct":22},"拉钢丝",{"key":28,"text":691,"correct":26},"吊线坠",{"key":31,"text":693,"correct":22},"假轴",{"key":34,"text":695,"correct":22},"转子",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":286,"analysis":37},1137364,"（2013年真题）电站汽轮机除本体外，还包括（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"凝水系统设备",{"key":24,"text":703,"correct":22},"蒸汽系统设备",{"key":28,"text":705,"correct":26},"引送风设备",{"key":31,"text":707,"correct":22},"给水系统设备",{"key":34,"text":709,"correct":26},"吹灰设备",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":95,"analysis":37},1137365,"（2011年真题）电站汽轮机主要由（ ）等组成。",[714,716,717,719,721],{"key":20,"text":715,"correct":22},"汽轮机本体",{"key":24,"text":703,"correct":22},{"key":28,"text":718,"correct":22},"凝结水系统设备",{"key":31,"text":720,"correct":26},"送引风设备",{"key":34,"text":722,"correct":26},"空气预热器",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":212,"analysis":37},1137366,"（2016年真题）电站锅炉安装质量控制要点包括（ ）。",[727,729,731,733,735],{"key":20,"text":728,"correct":22},"安装前确认钢结构高强螺栓连接点安装方法",{"key":24,"text":730,"correct":22},"锅炉受热面安装前编制专项施工方案并确认符合制造厂要求",{"key":28,"text":732,"correct":22},"燃烧器就位再次检查内外部结构",{"key":31,"text":734,"correct":22},"对炉膛进行气密试验",{"key":34,"text":736,"correct":26},"蒸汽管路冲洗与清洁",[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]