[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":735},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,38,50,2021,[13,38,53,67,82,97,112,127,142,157,172,185,200,215,229,238,252,267,282,296,310,325,339,354,368,382,394,408,422,436,450,465,479,493,507,521,535,550,564,578,592,606,620,635,649,663,677,692,707,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1137214,2,"多选题","起重作业中平衡梁形式的选用根据（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","被吊设备重量",true,{"key":24,"text":25,"correct":22},"B","被吊设备规格尺寸",{"key":27,"text":28,"correct":22},"C","被吊设备的结构特点",{"key":30,"text":31,"correct":32},"D","平衡梁尺寸",false,{"key":34,"text":35,"correct":22},"E","现场环境条件、要求","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1137215,"设备基础混凝土强度质量合格证明书，主要检查（ ）是否符合设计要求。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"混凝土强度",{"key":24,"text":45,"correct":32},"位置",{"key":27,"text":47,"correct":22},"混凝土养护",{"key":30,"text":49,"correct":32},"几何尺寸",{"key":34,"text":51,"correct":22},"混凝土配合比","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":66,"analysis":37},1137216,"预埋地脚螺栓验收时，其（ ）应符合施工图的要求。",[57,59,61,62,64],{"key":20,"text":58,"correct":32},"预埋方式",{"key":24,"text":60,"correct":32},"垫铁预留空间",{"key":27,"text":45,"correct":22},{"key":30,"text":63,"correct":22},"标高",{"key":34,"text":65,"correct":22},"露出基础的长度","CDE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1137217,"划定机械设备安装基准线的依据有（ ）。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"设备中心线",{"key":24,"text":74,"correct":22},"工艺布置图",{"key":27,"text":76,"correct":22},"土建单位提供的标高线",{"key":30,"text":78,"correct":32},"工艺系统原理图",{"key":34,"text":80,"correct":22},"有关建筑物的边缘线","BCE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1137218,"设备垫铁的作用是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"调整设备使其达到设计要求的水平度和标高",{"key":24,"text":89,"correct":32},"增加设备的稳定性",{"key":27,"text":91,"correct":32},"防止设备的水平位移",{"key":30,"text":93,"correct":32},"提高二次灌浆的质量",{"key":34,"text":95,"correct":22},"把设备重量均匀传递到基础","AE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1137219,"设备安装精度调整与检测时，不属于检测设备与零部件之间的相对位置误差的是（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"设备中心位置",{"key":24,"text":104,"correct":22},"水平度",{"key":27,"text":106,"correct":32},"垂直度",{"key":30,"text":108,"correct":32},"平行度",{"key":34,"text":110,"correct":32},"同轴度","AB",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1137220,"设备解体安装时，在安装施工现场需按（ ）要求进行装配和安装。",[116,118,120,122,124],{"key":20,"text":117,"correct":32},"工艺",{"key":24,"text":119,"correct":32},"规模",{"key":27,"text":121,"correct":22},"设计",{"key":30,"text":123,"correct":32},"生产",{"key":34,"text":125,"correct":22},"制造","CE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1137221,"机械设备整体式安装，关键在于（ ）的保证。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"设备的定位位置精度",{"key":24,"text":134,"correct":32},"设备的安装精度",{"key":27,"text":136,"correct":22},"各设备间的相互位置精度",{"key":30,"text":138,"correct":32},"设备的制造精度",{"key":34,"text":140,"correct":32},"设备的装配精度","AC",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1137222,"机械设备典型零部件的安装是机械设备安装方法的重要组成部分，其中包括（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"联轴器安装",{"key":24,"text":149,"correct":22},"液压润滑管路安装",{"key":27,"text":151,"correct":22},"液压元件安装",{"key":30,"text":153,"correct":32},"螺纹连接件的普通装配",{"key":34,"text":155,"correct":32},"自动测温装置","ABC",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1137223,"设备安装精度是指在安装工程中，为保证整套设备装置正确联动所需的（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"各独立设备之间的位置精度",{"key":24,"text":164,"correct":32},"满足工艺要求合理而严密的布局",{"key":27,"text":166,"correct":22},"单台设备重现设备的制造精度",{"key":30,"text":168,"correct":22},"整台设备运行中的运行精度",{"key":34,"text":170,"correct":32},"最终形成生产能力与设计能力的精准度","ACD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":184,"analysis":37},1137224,"安装精度调整与检测中，属于形状误差的有（ ）",[176,178,179,180,182],{"key":20,"text":177,"correct":22},"圆柱度",{"key":24,"text":108,"correct":32},{"key":27,"text":106,"correct":32},{"key":30,"text":181,"correct":22},"平面度",{"key":34,"text":183,"correct":22},"直线度","ADE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1137225,"设备安装偏差方向的控制要求包括（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"有利于抵消设备附属件安装后重量的影响",{"key":24,"text":192,"correct":22},"有利于抵消设备运转时产生的作用力的影响",{"key":27,"text":194,"correct":32},"有利于抵消设备运转时产生的振动的影响",{"key":30,"text":196,"correct":22},"有利于抵消零部件磨损的影响",{"key":34,"text":198,"correct":22},"有利于抵消摩擦面间油膜的影响","ABDE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1137226,"为控制安装精度，安装时运用温度变化偏差，以下做法正确的是（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"在调整两轴线倾斜精度时，上部间隙小于下部间隙",{"key":24,"text":207,"correct":32},"在调整两轴线倾斜精度时，下部间隙小于上部间隙",{"key":27,"text":209,"correct":32},"调整两端面间隙时选择平均值",{"key":30,"text":211,"correct":22},"发电机的轴心应高于干燥机的轴心",{"key":34,"text":213,"correct":32},"汽轮机的轴心应高于电动机的轴心","AD",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":171,"analysis":37},1137227,"联轴器两轴同轴度允许最大偏差是指在工作状态下，由于（ ）形成的两轴相对偏移量。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"制造误差",{"key":24,"text":222,"correct":32},"测量误差",{"key":27,"text":224,"correct":22},"安装误差",{"key":30,"text":226,"correct":22},"工作载荷变化",{"key":34,"text":228,"correct":32},"能量误差",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":96,"analysis":37},1137228,"垫铁的作用是（ ）。",[233,234,235,236,237],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":32},{"key":27,"text":91,"correct":32},{"key":30,"text":93,"correct":32},{"key":34,"text":95,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":66,"analysis":37},1137229,"胀锚地脚螺栓安装时，符合施工要求的是（ ）。",[242,244,246,248,250],{"key":20,"text":243,"correct":32},"螺栓中心到基础边缘的距离不小于5倍的胀锚螺栓直径",{"key":24,"text":245,"correct":32},"安装胀锚螺栓的基础强度不得大于10MPa",{"key":27,"text":247,"correct":22},"钻孔处不得有裂缝",{"key":30,"text":249,"correct":22},"钻孔时钻头不得与基础中的钢筋相碰触",{"key":34,"text":251,"correct":22},"钻孔直径和深度应与胀锚地脚螺栓相匹配",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":266,"analysis":37},1137230,"金属氧化物接闪器应进行的试验有（ ）。",[256,258,260,262,264],{"key":20,"text":257,"correct":32},"交流电导电流",{"key":24,"text":259,"correct":22},"持续电流",{"key":27,"text":261,"correct":22},"工频参考电压",{"key":30,"text":263,"correct":22},"直流参考电压",{"key":34,"text":265,"correct":32},"工频放电电压","BCD",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":281,"analysis":37},1137231,"下列关于变压器二次搬运说法错误的是（ ）。",[271,273,275,277,279],{"key":20,"text":272,"correct":32},"变压器二次搬运可采用滚杠滚动",{"key":24,"text":274,"correct":22},"钢丝绳挂在变压器顶盖上部的吊环吊装整台变压器",{"key":27,"text":276,"correct":32},"用木箱或纸箱将高低压绝缘瓷瓶罩住进行保护",{"key":30,"text":278,"correct":22},"变压器搬运过程中，不应有严重冲击或振动，运输倾斜角不得超过25°",{"key":34,"text":280,"correct":32},"用千斤顶顶升大型变压器时，升降操作应协调，各点受力均匀，并及时垫好垫块","BD",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":199,"analysis":37},1137232,"送电试运行时要注意的技术参数有（ ）。",[286,288,290,292,294],{"key":20,"text":287,"correct":22},"冲击电流",{"key":24,"text":289,"correct":22},"温度",{"key":27,"text":291,"correct":32},"湿度",{"key":30,"text":293,"correct":22},"空载电流",{"key":34,"text":295,"correct":22},"一、二次电压",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":52,"analysis":37},1137233,"380V电动机试运行前应检查的内容有（ ）。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"电动机绕组的绝缘电阻",{"key":24,"text":303,"correct":32},"电动机的地脚螺栓是否接地",{"key":27,"text":305,"correct":22},"电动机的保护接地线是否连接可靠",{"key":30,"text":307,"correct":32},"电动机的温度是否有过热现象",{"key":34,"text":309,"correct":22},"绕线式电动机的滑环和电刷",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":324,"analysis":37},1137234,"下列在有爆炸性气体环境中电气设备接地要求做法错误的是（ ）。",[314,316,318,320,322],{"key":20,"text":315,"correct":32},"接地干线应在爆炸危险区域内不同的方向不少于两处与接地体连接",{"key":24,"text":317,"correct":22},"电气设备的接地装置与独立的避雷针的接地装置应合并设置；与建筑物上的避雷针接地装置可分开设置",{"key":27,"text":319,"correct":32},"在有爆炸危险的环境中，电气设备的金属外壳应可靠接地",{"key":30,"text":321,"correct":32},"在有爆炸性气体环境1区内的所有电气设备应采用专门的接地线",{"key":34,"text":323,"correct":22},"在有爆炸性气体环境2区内所有电气设备，应采用专门的接地线","BE",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":171,"analysis":37},1137235,"配电装置柜体的安装时，基础型钢的安装（ ）应符合规定。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"垂直度允许偏差",{"key":24,"text":332,"correct":32},"平行度允许偏差",{"key":27,"text":334,"correct":22},"水平度允许偏差",{"key":30,"text":336,"correct":22},"位置偏差",{"key":34,"text":338,"correct":32},"基础型钢底部平面允许偏差",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":353,"analysis":37},1137236,"正确的电缆直埋敷设做法有（ ）。",[343,345,347,349,351],{"key":20,"text":344,"correct":22},"电缆敷设后铺100mm厚的细沙再盖混凝土保护板",{"key":24,"text":346,"correct":22},"铠装电缆的金属保护层可靠接地",{"key":27,"text":348,"correct":22},"进入建筑物应设标桩",{"key":30,"text":350,"correct":22},"穿越公路时要穿在保护管中",{"key":34,"text":352,"correct":32},"电缆可平行敷设在管道的上方","ABCD",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":66,"analysis":37},1137237,"下列有关架空线路中导线连接的说法正确的是（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":32},"每根导线在一个档距内可以有一个接头",{"key":24,"text":361,"correct":32},"在跨越公路、铁路时可以有一个接头",{"key":27,"text":363,"correct":22},"接头处的机械强度不低于导线自身强度的90%",{"key":30,"text":365,"correct":22},"接头处的电阻不超过同长度导线电阻的1.2倍",{"key":34,"text":367,"correct":22},"不同截面的导线，只能在杆上跳线内连接",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":156,"analysis":37},1137238,"工业管道泄漏性试验实施要点包括（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":22},"输送极度危害介质的管道应必须进行泄漏性试验",{"key":24,"text":375,"correct":22},"泄漏性试验在压力试验合格后进行",{"key":27,"text":377,"correct":22},"泄漏性试验压力为设计压力",{"key":30,"text":379,"correct":32},"泄漏性试验的试验介质为输送介质",{"key":34,"text":381,"correct":32},"检查部位包括焊缝",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":393,"analysis":37},1137239,"管道与动设备连接时，应在自由状态下检查法兰的（ ）。",[386,388,389,390,391],{"key":20,"text":387,"correct":32},"同心度",{"key":24,"text":110,"correct":22},{"key":27,"text":108,"correct":22},{"key":30,"text":106,"correct":32},{"key":34,"text":392,"correct":32},"倾斜度","BC",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":324,"analysis":37},1137240,"下列关于工业管道阀门说法正确的是（ ）。",[398,400,402,404,406],{"key":20,"text":399,"correct":32},"阀门应进行压力试验和严密性试验",{"key":24,"text":401,"correct":22},"安全阀应进行整定压力调整和密封试验",{"key":27,"text":403,"correct":32},"球阀与金属管道以焊接方式连接时，阀门应在关闭状态下安装",{"key":30,"text":405,"correct":32},"安全阀应水平安装以便操作",{"key":34,"text":407,"correct":22},"截止阀安装时应按介质流向确定其安装方向",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":156,"analysis":37},1137241,"管道安装涉及的预制， 主要是根据（ ）确定预制的对象和可预制的程度。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"管道用途",{"key":24,"text":415,"correct":22},"管道连接方式",{"key":27,"text":417,"correct":22},"管道安装工艺",{"key":30,"text":419,"correct":32},"管道工程规模",{"key":34,"text":421,"correct":32},"选定的设备情况",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":435,"analysis":37},1137242,"制定流水预制操作工艺时，根据管道不同的连接方式，确定预制工艺。应从（ ）等工序工况考虑",[426,427,429,431,433],{"key":20,"text":413,"correct":32},{"key":24,"text":428,"correct":22},"管道连接",{"key":27,"text":430,"correct":22},"管道下料",{"key":30,"text":432,"correct":22},"管道检验",{"key":34,"text":434,"correct":22},"管道涂装","BCDE",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":52,"analysis":37},1137243,"工业管道系统泄露性试验的正确实施要点有（ ）。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"输送极度和高度危害介质的管道必须进行泄露性试验",{"key":24,"text":443,"correct":32},"泄露性试验应在压力实验前进行",{"key":27,"text":445,"correct":22},"泄露性试验的试验介质宜采用空气",{"key":30,"text":447,"correct":32},"试验压力为设计压力的1.5倍",{"key":34,"text":449,"correct":22},"泄露性试验可结合试车一并进行",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":464,"analysis":37},1137244,"工业管道系统压力试验前，应具备的条件是（ ）。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"管道上的膨胀节己设置临时约束装置",{"key":24,"text":457,"correct":22},"试验方案已经过批准",{"key":27,"text":459,"correct":32},"试验压力表不少于1块",{"key":30,"text":461,"correct":32},"管道上的安全阀处于自然状态",{"key":34,"text":463,"correct":22},"待试管道与无关系统已用盲板隔开","ABE",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":126,"analysis":37},1137245,"球罐泄漏性试验不包括（ ）。",[469,471,473,475,477],{"key":20,"text":470,"correct":32},"气密性试验",{"key":24,"text":472,"correct":32},"氨检漏试验",{"key":27,"text":474,"correct":22},"煤油检漏试验",{"key":30,"text":476,"correct":32},"氦检漏试验",{"key":34,"text":478,"correct":22},"液压试验",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":81,"analysis":37},1137246,"通常情况下，塔器水压试验合格标准是（ ）。",[483,485,487,489,491],{"key":20,"text":484,"correct":32},"地基无沉降",{"key":24,"text":486,"correct":22},"无可见变形",{"key":27,"text":488,"correct":22},"无渗漏",{"key":30,"text":490,"correct":32},"表面100%磁粉检测无裂纹",{"key":34,"text":492,"correct":22},"试验过程中无异常响声",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":184,"analysis":37},1137247,"金属储罐中幅板搭接接头采用手工焊接时，控制焊接变形的主要工艺措施有（ ）。",[497,499,501,503,505],{"key":20,"text":498,"correct":22},"先焊短焊缝，后焊长焊缝",{"key":24,"text":500,"correct":32},"焊工均匀分布同向分段焊接",{"key":27,"text":502,"correct":32},"焊工均匀分布对称施焊",{"key":30,"text":504,"correct":22},"初层焊道采用分段退焊法",{"key":34,"text":506,"correct":22},"初层焊道采用跳焊法",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":353,"analysis":37},1137248,"钢制储罐建造完毕进行充水试验检查的项目有（ ）。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"罐底严密性",{"key":24,"text":514,"correct":22},"罐壁强度及严密性",{"key":27,"text":516,"correct":22},"固定顶稳定性",{"key":30,"text":518,"correct":22},"浮顶升降试验",{"key":34,"text":520,"correct":32},"罐壁的局部凹凸变形",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":464,"analysis":37},1137249,"球形罐制造单位提供的质量证明书包括的内容有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"制造竣工图样",{"key":24,"text":528,"correct":22},"压力容器产品合格证",{"key":27,"text":530,"correct":32},"焊后整体热处理报告",{"key":30,"text":532,"correct":32},"耐压试验和泄漏试验记录",{"key":34,"text":534,"correct":22},"特种设备制造监督检验证书",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":549,"analysis":37},1137250,"钢网架结构（ ）完成后应分别测量其挠度值。",[539,541,543,545,547],{"key":20,"text":540,"correct":32},"地面组装",{"key":24,"text":542,"correct":32},"装配",{"key":27,"text":544,"correct":32},"单元网格安装",{"key":30,"text":546,"correct":22},"总拼装",{"key":34,"text":548,"correct":22},"屋面工程","DE",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":184,"analysis":37},1137251,"下列作业活动中，属于工业钢结构安装主要环节的有（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"钢结构安装",{"key":24,"text":557,"correct":32},"作业地面整平",{"key":27,"text":559,"correct":32},"钢构件制作",{"key":30,"text":561,"correct":22},"基础验收找平",{"key":34,"text":563,"correct":22},"防腐蚀涂装",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":156,"analysis":37},1137252,"电站汽轮机主要由（ ）等组成。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"汽轮机本体",{"key":24,"text":571,"correct":22},"蒸汽系统设备",{"key":27,"text":573,"correct":22},"凝结水系统设备",{"key":30,"text":575,"correct":32},"送引风设备",{"key":34,"text":577,"correct":32},"空气预热器",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":199,"analysis":37},1137253,"大型汽轮机低压外下缸前段和后段组合找中心时，可作为基准的有（ ）。",[582,584,586,588,590],{"key":20,"text":583,"correct":22},"激光",{"key":24,"text":585,"correct":22},"拉钢丝",{"key":27,"text":587,"correct":32},"吊线坠",{"key":30,"text":589,"correct":22},"假轴",{"key":34,"text":591,"correct":22},"转子",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":199,"analysis":37},1137254,"发电机转子穿装，不同的机组有不同的穿转子方法，常用的方法有（ ）。",[596,598,600,602,604],{"key":20,"text":597,"correct":22},"滑道式方法",{"key":24,"text":599,"correct":22},"接轴方法",{"key":27,"text":601,"correct":32},"液压顶升方法",{"key":30,"text":603,"correct":22},"用后轴承座作平衡重量的方法",{"key":34,"text":605,"correct":22},"用两台跑车的方法",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":126,"analysis":37},1137255,"风力发电设备塔筒安装技术中说法错误的是（ ）。",[610,612,614,616,618],{"key":20,"text":611,"correct":32},"塔筒分多段供货，现场根据塔筒重量、尺寸以及安装高度选择吊车的吊装工况",{"key":24,"text":613,"correct":32},"第一节安装前在第一节塔筒下法兰外缘和内缘各涂一圈密封胶以避免湿气进入塔筒内部",{"key":27,"text":615,"correct":22},"分别使用力矩扳手、电动扳手和2次液压扳手按要求的拧紧力矩分四次拧紧塔筒螺栓",{"key":30,"text":617,"correct":32},"用塞尺检测塔筒法兰的间隙",{"key":34,"text":619,"correct":22},"使用经纬仪控制塔筒的水平度",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":634,"analysis":37},1137256,"下列关于光伏发电设备安装技术要求说法错误的是（ ）。",[624,626,628,630,632],{"key":20,"text":625,"correct":32},"光伏组件采用螺栓进行固定",{"key":24,"text":627,"correct":32},"光伏组件之间的接线在组串后应进行光伏组件串的开路电压和短路电流的测试",{"key":27,"text":629,"correct":22},"施工时当接触组串的金属带电部位时应做好绝缘防护",{"key":30,"text":631,"correct":22},"逆变器本体的预留孔及电缆管口进行密封",{"key":34,"text":633,"correct":32},"逆变器基础型钢其顶部应高出抹平地面10mm并有可靠的接地","CD",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":96,"analysis":37},1137257,"下列属于发电机定子的有（ ）。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"机座",{"key":24,"text":642,"correct":32},"励磁绕组",{"key":27,"text":644,"correct":32},"护环",{"key":30,"text":646,"correct":32},"中心环",{"key":34,"text":648,"correct":22},"端盖",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":141,"analysis":37},1137258,"下列不属于轴系对轮中心找正的是（ ）",[653,655,657,659,661],{"key":20,"text":654,"correct":22},"高压对轮中心",{"key":24,"text":656,"correct":32},"低压对轮中心",{"key":27,"text":658,"correct":22},"高低压对轮中心",{"key":30,"text":660,"correct":32},"低压转子-电转子",{"key":34,"text":662,"correct":32},"中低压对轮中心",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":171,"analysis":37},1137259,"下列关于发电机转子穿装前应进行的试验说法正确的是（ ）。",[667,669,671,673,675],{"key":20,"text":668,"correct":22},"进行气密性试验",{"key":24,"text":670,"correct":32},"进行磁道通路试验",{"key":27,"text":672,"correct":22},"进行漏气量试验",{"key":30,"text":674,"correct":22},"试验压力符合制造厂规定",{"key":34,"text":676,"correct":32},"允许漏气量符合业主要求",{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":691,"analysis":37},1137260,"在厂房内吊装大型发电机定子的方法通常有（ ）。",[681,683,685,687,689],{"key":20,"text":682,"correct":32},"大型流动式起重机组合吊架",{"key":24,"text":684,"correct":22},"液压提升装置吊装",{"key":27,"text":686,"correct":32},"液压顶升平移吊装",{"key":30,"text":688,"correct":22},"专用吊装架吊装",{"key":34,"text":690,"correct":22},"桥式起重机改装系统吊装","BDE",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":706,"analysis":37},1137261,"锅炉受热面施工场地根据（ ）来决定。",[696,698,700,702,704],{"key":20,"text":697,"correct":22},"组合后的体积",{"key":24,"text":699,"correct":22},"组合后的重量",{"key":27,"text":701,"correct":32},"组合后的高度",{"key":30,"text":703,"correct":22},"现场施工条件",{"key":34,"text":705,"correct":32},"施工方案","ABD",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":393,"analysis":37},1137262,"关于节流件安装规定中，不正确的是（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":32},"必须在管道吹洗后安装",{"key":24,"text":714,"correct":22},"必须使流体从节流件的下游端面流向上游端面",{"key":27,"text":716,"correct":22},"在测量液体时排泄孔的位置在管道的正下方",{"key":30,"text":718,"correct":32},"节流件断面应垂直于管道轴线",{"key":34,"text":720,"correct":32},"节流件与管件或夹持件同轴",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":353,"analysis":37},1137263,"自动化仪表试验包括（ ）。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"单台仪表的校准和试验",{"key":24,"text":728,"correct":22},"仪表电源设备的试验",{"key":27,"text":730,"correct":22},"综合控制系统的试验",{"key":30,"text":732,"correct":22},"回路试验",{"key":34,"text":734,"correct":32},"验收试验",[736,740,743,746,749,752],{"id":737,"name":738,"category":7,"favorite":739},1,"领导干部任职前廉政法规知识测试题",92,{"id":741,"name":742,"category":7,"favorite":737},595,"建筑结构与设备",{"id":744,"name":745,"category":7,"favorite":737},715,"招标采购专业知识与法律法规",{"id":747,"name":748,"category":7,"favorite":737},848,"市政方向-通用基础",{"id":750,"name":751,"category":7,"favorite":8},534,"BIM工程师",{"id":753,"name":751,"category":7,"favorite":8},535]