[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":727},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,34,50,2021,[13,38,53,68,83,97,111,126,140,155,169,180,194,209,223,238,252,267,281,295,307,322,337,351,365,379,394,408,422,436,451,466,481,495,509,522,536,550,564,578,590,604,618,632,646,660,674,685,699,713],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1137006,2,"多选题","下列关于机电工程开标与评标管理要求，说法正确的是（）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","开标时间应与提交投标文件截止时间相同",true,{"key":24,"text":25,"correct":22},"B","一般由招标人代表和技术、经济等方面的专家组成，其成员人数为5人以上单数",{"key":27,"text":28,"correct":22},"C","评标原则包括公开、公平、公正",{"key":30,"text":31,"correct":32},"D","开、评标过程中，有效标书少于4家，此次招标无效，需重新招标",false,{"key":34,"text":35,"correct":22},"E","技术、经济等方面的专家不得少于成员总数的2\u002F3","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1137007,"建设工程施工合同示范文本的组成包括（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"招标文件",{"key":24,"text":45,"correct":22},"协议书",{"key":27,"text":47,"correct":32},"结算书",{"key":30,"text":49,"correct":22},"通用条款",{"key":34,"text":51,"correct":22},"专用条款","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1137008,"机电工程总承包单位进行项目分包时应考虑的因素有（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"锅炉、压力管道、压力容器、起重、电梯工程应有技术资格",{"key":24,"text":60,"correct":32},"机电工程总承包不得进行劳务分包",{"key":27,"text":62,"correct":22},"分包合同必须明确规定分包单位的任务、责任及相应的权利，包括合同价款、工期、奖罚等",{"key":30,"text":64,"correct":22},"分包合同条款应写明确和具体，避免含糊不清",{"key":34,"text":66,"correct":22},"主体工程不能分包","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1137009,"国际机电工程项目合同风险中,属于环境风险因素的有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"财经风险",{"key":24,"text":75,"correct":32},"技术风险",{"key":27,"text":77,"correct":22},"政治风险",{"key":30,"text":79,"correct":32},"营运风险",{"key":34,"text":81,"correct":22},"市场风险","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":36,"analysis":37},1137010,"机电工程施工索赔的起因包括（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"不可抗力因素",{"key":24,"text":90,"correct":22},"工程环境变化",{"key":27,"text":92,"correct":22},"合同变更",{"key":30,"text":94,"correct":32},"合同条文齐全",{"key":34,"text":96,"correct":22},"合同对方违约，不履行或未能正确履行合同义务与责任",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":82,"analysis":37},1137012,"下列内容，属于设备验收依据的有（）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"设备采购合同",{"key":24,"text":104,"correct":32},"施工进度计划",{"key":27,"text":106,"correct":22},"国家强制标准",{"key":30,"text":108,"correct":32},"设备生产厂家",{"key":34,"text":110,"correct":22},"设备技术规格",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1137013,"停工待检 （H）点应包括（）。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"重要工序节点",{"key":24,"text":118,"correct":22},"隐蔽工程",{"key":27,"text":120,"correct":32},"重要部位的加工",{"key":30,"text":122,"correct":22},"关键的试验验收点",{"key":34,"text":124,"correct":22},"不可重复试验验收点","ABDE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":36,"analysis":37},1137014,"设备交付现场安装前，主持和参与验收的单位代表有（）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"建设单位",{"key":24,"text":133,"correct":22},"监理单位",{"key":27,"text":135,"correct":22},"施工单位",{"key":30,"text":137,"correct":32},"设计单位",{"key":34,"text":139,"correct":22},"设备供货厂商",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1137015,"设备采购评审包括（）。",[144,146,148,150,152],{"key":20,"text":145,"correct":32},"资格预审",{"key":24,"text":147,"correct":22},"综合评审",{"key":27,"text":149,"correct":22},"商务评审",{"key":30,"text":151,"correct":32},"经验评审",{"key":34,"text":153,"correct":22},"技术评审","BCE",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":125,"analysis":37},1137016,"采购环节设备验收的内容包括（）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"核对验证",{"key":24,"text":162,"correct":22},"外观检查",{"key":27,"text":164,"correct":32},"现场见证检验",{"key":30,"text":166,"correct":22},"运转调试检验",{"key":34,"text":168,"correct":22},"技术资料验收",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":179,"analysis":37},1137017,"机电工程设备验收项目主要包括（）。",[173,175,176,177,178],{"key":20,"text":174,"correct":32},"质量检查",{"key":24,"text":162,"correct":22},{"key":27,"text":160,"correct":22},{"key":30,"text":166,"correct":22},{"key":34,"text":168,"correct":22},"BCDE",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":179,"analysis":37},1137018,"施工组织设计的修改或补充涉及原则的重大变更，须履行原审批手续，原则的重大变更指（）等。",[184,186,188,190,192],{"key":20,"text":185,"correct":32},"工程设计无重大修改",{"key":24,"text":187,"correct":22},"有关法律、法规、规范和标准实施、修订和废止",{"key":27,"text":189,"correct":22},"主要施工方法有重大调整",{"key":30,"text":191,"correct":22},"主要施工资源配置有重大调整",{"key":34,"text":193,"correct":22},"施工环境有重大改变",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":208,"analysis":37},1137019,"下列说法中，符合总平面布置图布置原则的有（）。",[198,200,202,204,206],{"key":20,"text":199,"correct":22},"总体布局合理，施工现场占用面积少，符合节能、环境、安全、消防和文明施工等相关规定",{"key":24,"text":201,"correct":22},"合理组织运输，减少二次搬运",{"key":27,"text":203,"correct":22},"施工区域的划分和场地的临时占用应符合总体施工部署和施工流程的要求，减少相互干扰",{"key":30,"text":205,"correct":22},"充分利用既有建（构）筑物和既有设施为项目施工服务，降低临时设施的建设费用",{"key":34,"text":207,"correct":32},"临时设施不宜使办公区和生产区分离设置，以便于施工管理和施工调度，但二者应与生活区分离","ABCD",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":67,"analysis":37},1137020,"机电工程施工方案交底内容为该工程的（）等。",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"操作方法",{"key":24,"text":216,"correct":32},"工程特点",{"key":27,"text":218,"correct":22},"要领",{"key":30,"text":220,"correct":22},"施工工艺",{"key":34,"text":222,"correct":22},"施工程序和顺序",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":237,"analysis":37},1137021,"施工待优化中,进行经济合理性比较包括（）。",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"各方案的一次性投资总额",{"key":24,"text":230,"correct":32},"各方案实施的可靠性",{"key":27,"text":232,"correct":32},"各方案资源节约、污染降低程度",{"key":30,"text":234,"correct":22},"各方案的资金时间价值",{"key":34,"text":236,"correct":22},"各方案对环境影响的损失","ADE",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":82,"analysis":37},1137022,"下列关于机电工程施工组织设计的审核及批准，说法正确的是（）。",[242,244,246,248,250],{"key":20,"text":243,"correct":22},"施工组织总设计、专项施工组织设计的编制，应坚持“谁负责项目的实施，谁组织编制”的原则",{"key":24,"text":245,"correct":32},"施工组织总设计由设计单位组织编制",{"key":27,"text":247,"correct":22},"施工组织设计编制、审核和审批工作实行分级管理制度，施工组织总设计应由总承包单位技术负责人审批后，向监理报批",{"key":30,"text":249,"correct":32},"专项施工组织设计由监理单位组织编制",{"key":34,"text":251,"correct":22},"当工程没有施工总承包单位时，施工组织总设计应由建设单位负责组织各施工单位编制",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":266,"analysis":37},1137023,"施工组织设计按编制对象分类包括（）。",[256,258,260,262,264],{"key":20,"text":257,"correct":32},"标前施工组织设计",{"key":24,"text":259,"correct":32},"标后施工组织设计",{"key":27,"text":261,"correct":22},"施工组织总设计",{"key":30,"text":263,"correct":22},"单位工程施工组织设计",{"key":34,"text":265,"correct":22},"专项工程施工组织设计","CDE",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":125,"analysis":37},1137024,"施工机械管理的一般要求中,施工机械选择的方法包括（）。",[271,273,275,277,279],{"key":20,"text":272,"correct":22},"综合评分法",{"key":24,"text":274,"correct":22},"折算费用法",{"key":27,"text":276,"correct":32},"价值工程法",{"key":30,"text":278,"correct":22},"成本比较法",{"key":34,"text":280,"correct":22},"界限使用判断法",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":237,"analysis":37},1137025,"设备工厂化预制技术的应用，实现了建筑机电安装工程的（）。",[285,287,289,291,293],{"key":20,"text":286,"correct":22},"标准化",{"key":24,"text":288,"correct":32},"程序化",{"key":27,"text":290,"correct":32},"作业流水化",{"key":30,"text":292,"correct":22},"产品模块化",{"key":34,"text":294,"correct":22},"集成化",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":208,"analysis":37},1137026,"在工程项目施工中，大型施工机械设备选择的方法有（）。",[299,300,302,303,305],{"key":20,"text":272,"correct":22},{"key":24,"text":301,"correct":22},"单位工程量成本比较法",{"key":27,"text":280,"correct":22},{"key":30,"text":304,"correct":22},"等值成本法",{"key":34,"text":306,"correct":32},"单台设备评分法",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":321,"analysis":37},1137027,"下列属于施工机械使用管理“三定”内容的有（）。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"定人",{"key":24,"text":314,"correct":22},"定机",{"key":27,"text":316,"correct":32},"定作业时间",{"key":30,"text":318,"correct":22},"定岗位职责",{"key":34,"text":320,"correct":32},"定操作规程","ABD",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":336,"analysis":37},1137028,"下列施工准备中，应由总承包单位向分承包单位提供的有（）。",[326,328,330,332,334],{"key":20,"text":327,"correct":22},"施工用电",{"key":24,"text":329,"correct":22},"施工图纸",{"key":27,"text":331,"correct":32},"施工方案",{"key":30,"text":333,"correct":32},"施工技术",{"key":34,"text":335,"correct":22},"施工场地","ABE",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":154,"analysis":37},1137029,"机电工程项目部与施工单位有洽谈协商记录的协调单位包括（）。",[341,343,345,347,349],{"key":20,"text":342,"correct":32},"环保监察单位",{"key":24,"text":344,"correct":22},"供电供水单位",{"key":27,"text":346,"correct":22},"污水排放单位",{"key":30,"text":348,"correct":32},"质量监督单位",{"key":34,"text":350,"correct":22},"工程设计单位",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":208,"analysis":37},1137030,"机电工程施工进度计划安排中的协调制约因素有（）。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"工程实体现状",{"key":24,"text":358,"correct":22},"设备材料进场时机",{"key":27,"text":360,"correct":22},"机电安装工艺规律",{"key":30,"text":362,"correct":22},"施工机具和人员配备",{"key":34,"text":364,"correct":32},"施工组织设计",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":125,"analysis":37},1137031,"机电工程进度计划编制应注意的要点有（）。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"优先安排工程量大的工艺生产线",{"key":24,"text":372,"correct":22},"满足机电工程连续均衡施工要求",{"key":27,"text":374,"correct":32},"在机电工程施工过程能加班加点",{"key":30,"text":376,"correct":22},"各种不利施工条件的限制和影响",{"key":34,"text":378,"correct":22},"在工程施工过程能作为平衡调剂",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":393,"analysis":37},1137032,"下列措施中，属于施工进度控制合同措施的是（）。",[383,385,387,389,391],{"key":20,"text":384,"correct":22},"制定专用条款",{"key":24,"text":386,"correct":22},"控制工程变更",{"key":27,"text":388,"correct":22},"加强索赔管理",{"key":30,"text":390,"correct":32},"编制资金计划",{"key":34,"text":392,"correct":32},"工程进度款支付","ABC",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":179,"analysis":37},1137033,"机电工程施工进度计划调整的内容包括（）。",[398,400,402,404,406],{"key":20,"text":399,"correct":32},"合同工期",{"key":24,"text":401,"correct":22},"施工内容",{"key":27,"text":403,"correct":22},"起止时间",{"key":30,"text":405,"correct":22},"工作关系",{"key":34,"text":407,"correct":22},"资源供应",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":393,"analysis":37},1137034,"机电工程施工成本控制措施中,属于人工费成本的控制措施有（）。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"严格劳动组织",{"key":24,"text":415,"correct":22},"严密劳动定额管理",{"key":27,"text":417,"correct":22},"加强技术培训",{"key":30,"text":419,"correct":32},"加强施工设备管理",{"key":34,"text":421,"correct":32},"减少管理人员",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":36,"analysis":37},1137035,"成本管理的任务，包括（）。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"成本计划编制",{"key":24,"text":429,"correct":22},"成本控制",{"key":27,"text":431,"correct":22},"成本分析",{"key":30,"text":433,"correct":32},"成本偏差控制",{"key":34,"text":435,"correct":22},"成本考核",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":450,"analysis":37},1137036,"机电工程施工阶段项目成本控制要点包括（）。",[440,442,444,446,448],{"key":20,"text":441,"correct":32},"编制成本计划",{"key":24,"text":443,"correct":22},"对分解的计划成本进行落实",{"key":27,"text":445,"correct":22},"核算实际成本",{"key":30,"text":447,"correct":22},"进行成本差异分析",{"key":34,"text":449,"correct":32},"进行成本分析考评，落实奖惩制度","BCD",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":465,"analysis":37},1137037,"分部分项工程清单综合单价综合了（）。",[455,457,459,461,463],{"key":20,"text":456,"correct":22},"人工费",{"key":24,"text":458,"correct":32},"措施费",{"key":27,"text":460,"correct":22},"材料费",{"key":30,"text":462,"correct":22},"利润",{"key":34,"text":464,"correct":32},"税金","ACD",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":480,"analysis":37},1137038,"下列竣工结算编制的依据，正确的说法有（）。",[470,472,474,476,478],{"key":20,"text":471,"correct":32},"协议书（不包括补充协议）",{"key":24,"text":473,"correct":32},"投标书（只包括报价工程量清单）",{"key":27,"text":475,"correct":22},"相关规范标准",{"key":30,"text":477,"correct":22},"设计文件",{"key":34,"text":479,"correct":32},"进度计划","CD",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":208,"analysis":37},1137039,"绿色施工的要点有（）。",[485,487,489,491,493],{"key":20,"text":486,"correct":22},"绿色施工管理",{"key":24,"text":488,"correct":22},"环境保护",{"key":27,"text":490,"correct":22},"节材与材料资源利用",{"key":30,"text":492,"correct":22},"节地与施工用地保护",{"key":34,"text":494,"correct":32},"文明施工",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":36,"analysis":37},1137040,"绿色施工“四节—环保”中的“四节”是指（）。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"节能",{"key":24,"text":502,"correct":22},"节水",{"key":27,"text":504,"correct":22},"节地",{"key":30,"text":506,"correct":32},"节时",{"key":34,"text":508,"correct":22},"节材",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":208,"analysis":37},1137041,"绿色施工管理包括（）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"组织管理",{"key":24,"text":516,"correct":22},"规划管理",{"key":27,"text":518,"correct":22},"实施管理",{"key":30,"text":520,"correct":22},"施工人员职业安全健康管理",{"key":34,"text":494,"correct":32},{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":82,"analysis":37},1137042,"建设单位接受施工单位对分部工程报验申请后应组织（）等单位有关项目负责人及技术负责人进行验收。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"施工",{"key":24,"text":529,"correct":32},"质监",{"key":27,"text":531,"correct":22},"监理",{"key":30,"text":533,"correct":32},"主管",{"key":34,"text":535,"correct":22},"设计",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":82,"analysis":37},1137043,"机电工程单体试运行前必须具备的条件包括（ ）。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"单机试车责任已经明确",{"key":24,"text":543,"correct":32},"技术组织工作已经完成",{"key":27,"text":545,"correct":22},"资源条件已经满足",{"key":30,"text":547,"correct":32},"中间验收合格",{"key":34,"text":549,"correct":22},"有关分项工程验收合格",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":321,"analysis":37},1137044,"机电工程联动试运行工序交接中,“三查”包括（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"查设计漏项",{"key":24,"text":557,"correct":22},"查未完工程",{"key":27,"text":559,"correct":32},"查施工资料",{"key":30,"text":561,"correct":22},"查工程质量隐患",{"key":34,"text":563,"correct":32},"查工程安全隐患",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":179,"analysis":37},1137045,"安装施工合同没有特别规定时，下列活动中，应由业主负责组织和指挥的有（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":32},"预试车",{"key":24,"text":571,"correct":22},"冷试车",{"key":27,"text":573,"correct":22},"热试车",{"key":30,"text":575,"correct":22},"运行调试",{"key":34,"text":577,"correct":22},"性能考核",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":30,"analysis":37},1137046,"建设工程项目必须与主体工程同步验收的项目是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":32},"通风空调工程",{"key":24,"text":585,"correct":32},"电气工程",{"key":27,"text":587,"correct":32},"电梯工程",{"key":30,"text":589,"correct":22},"消防工程",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":336,"analysis":37},1137047,"建设工程竣工验收备案需具备的条件有（ ）。",[594,596,598,600,602],{"key":20,"text":595,"correct":22},"工程竣工验收已合格,并完成工程验收报告",{"key":24,"text":597,"correct":22},"工程质量监督机构已经出具工程质量监督报告",{"key":27,"text":599,"correct":32},"施工单位出具工程质量保修书",{"key":30,"text":601,"correct":32},"工程款已全部结清",{"key":34,"text":603,"correct":22},"已办理工程监理合同登记核销及施工合同备案核销手续",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":208,"analysis":37},1137048,"在竣工验收阶段,收集整理竣工验收资料的重点包括（ ）。",[608,610,612,614,616],{"key":20,"text":609,"correct":22},"工程竣工扫尾的资料",{"key":24,"text":611,"correct":22},"试生产试运行后工程“消缺”",{"key":27,"text":613,"correct":22},"尚未完成的工程竣工图",{"key":30,"text":615,"correct":22},"试生产试运行情况",{"key":34,"text":617,"correct":32},"工程施工总结",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":266,"analysis":37},1137049,"机电安装工程技术性回访有（ ）。",[622,624,626,628,630],{"key":20,"text":623,"correct":32},"锅炉房",{"key":24,"text":625,"correct":32},"制冷系统运行情况",{"key":27,"text":627,"correct":22},"新工艺",{"key":30,"text":629,"correct":22},"新材料",{"key":34,"text":631,"correct":22},"新设备",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":336,"analysis":37},1137050,"机电安装工程回访的方式一般有（ ）。",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"季节性回访",{"key":24,"text":639,"correct":22},"技术性回访",{"key":27,"text":641,"correct":32},"保修期满后回访",{"key":30,"text":643,"correct":32},"投入生产前的运转情况",{"key":34,"text":645,"correct":22},"采用邮件",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":393,"analysis":37},1137051,"县级以上地方人民政府计量行政部门监督和贯彻实施计量法律、法规的职责,除贯彻执行国家计量工作的方针、政策和规章制度,推行国家法定计量单位;制定和协调计量事业的发展规划,建立计量基准和社会公用计量标准,组织量值传递;对制造、修理、销售、使用计量器具实施监督及监督检查计量法律、法规的实施情况外还应包括（）。",[650,652,654,656,658],{"key":20,"text":651,"correct":22},"计量认证",{"key":24,"text":653,"correct":22},"组织仲裁检定",{"key":27,"text":655,"correct":22},"调解计量纠纷",{"key":30,"text":657,"correct":32},"计量检定",{"key":34,"text":659,"correct":32},"新产品定型鉴定",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":179,"analysis":37},1137052,"《中华人民共和国计量法》规定，使用计量标准器具必须具备的条件是（）。",[664,666,668,670,672],{"key":20,"text":665,"correct":32},"通过IS09000质量体系认证",{"key":24,"text":667,"correct":22},"必须具备经计量检定合格",{"key":27,"text":669,"correct":22},"具有称职的保存、维护、使用人员",{"key":30,"text":671,"correct":22},"具有正常工作所需要的环境条件",{"key":34,"text":673,"correct":22},"具有完善的管理制度",{"id":675,"libraryId":5,"type":15,"typeLabel":16,"stem":676,"options":677,"answer":125,"analysis":37},1137053,"使用计量标准器具必须具备的条件是（）。",[678,680,681,683,684],{"key":20,"text":679,"correct":22},"经计量检定合格",{"key":24,"text":671,"correct":22},{"key":27,"text":682,"correct":32},"质量、环境、安全三项体系认证通过",{"key":30,"text":669,"correct":22},{"key":34,"text":673,"correct":22},{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":36,"analysis":37},1137054,"计量检定按其检定的目的和性质分类，包括有（）。",[689,691,693,695,697],{"key":20,"text":690,"correct":22},"首次检定",{"key":24,"text":692,"correct":22},"后续检定",{"key":27,"text":694,"correct":22},"使用中检定",{"key":30,"text":696,"correct":32},"末期检定",{"key":34,"text":698,"correct":22},"仲裁检定",{"id":700,"libraryId":5,"type":15,"typeLabel":16,"stem":701,"options":702,"answer":321,"analysis":37},1137055,"企业、事业单位应当配备与（）相适应的计量检测设施。",[703,705,707,709,711],{"key":20,"text":704,"correct":22},"生产",{"key":24,"text":706,"correct":22},"科研",{"key":27,"text":708,"correct":32},"财务管理",{"key":30,"text":710,"correct":22},"经营管理",{"key":34,"text":712,"correct":32},"安全管理",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":465,"analysis":37},1137056,"合理选用计量器具的重要依据是它的（）及动态特性等。",[717,719,721,723,725],{"key":20,"text":718,"correct":22},"准确度等级",{"key":24,"text":720,"correct":32},"结构特性",{"key":27,"text":722,"correct":22},"分辨率",{"key":30,"text":724,"correct":22},"灵敏度",{"key":34,"text":726,"correct":32},"静态特性",[728,732,735,738,741,744],{"id":729,"name":730,"category":7,"favorite":731},1,"领导干部任职前廉政法规知识测试题",92,{"id":733,"name":734,"category":7,"favorite":729},595,"建筑结构与设备",{"id":736,"name":737,"category":7,"favorite":729},715,"招标采购专业知识与法律法规",{"id":739,"name":740,"category":7,"favorite":729},848,"市政方向-通用基础",{"id":742,"name":743,"category":7,"favorite":8},534,"BIM工程师",{"id":745,"name":743,"category":7,"favorite":8},535]