[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,31,50,2021,[13,38,53,68,83,98,112,127,142,157,171,183,196,211,226,241,256,270,285,299,313,327,342,357,371,385,399,413,427,441,456,470,480,494,509,523,537,550,564,578,593,607,621,635,649,664,678,692,706,721],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1136855,2,"多选题","预埋地脚螺栓的验收要求有（）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","预埋地脚螺栓的位置、标高及露出基础的长度应符合设计或规范要求",true,{"key":24,"text":25,"correct":22},"B","地脚螺栓的螺母和垫圈配套，预埋地脚螺栓的螺纹和螺母应保护完好",{"key":27,"text":28,"correct":22},"C","T形头地脚螺栓与基础板应按规格配套使用，埋设T形头地脚螺栓基础板应牢固、平正，地脚螺栓光杆部分和基础板应刷防锈漆",{"key":30,"text":31,"correct":32},"D","安装胀锚地脚螺栓的基础混凝土强度不得小于15MPa",false,{"key":34,"text":35,"correct":22},"E","基础混凝土或钢筋混凝土有裂缝的部位不得使用胀锚地脚螺栓","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1136856,"胀锚地脚螺栓安装应满足（）要求。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"中心到基础边缘的距离不小于其直径的10倍",{"key":24,"text":45,"correct":32},"基础强度不得大于10MPa",{"key":27,"text":47,"correct":22},"钻孔时应防止钻头与基础中的钢筋、埋管等相碰",{"key":30,"text":49,"correct":22},"钻孔处不得有裂缝",{"key":34,"text":51,"correct":22},"钻孔直径和深度应胀锚地脚螺栓相匹配","CDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1136857,"下列设备安装时，（）会因环境温度影响安装精度。",[57,59,61,63,65],{"key":20,"text":58,"correct":32},"空气压缩机",{"key":24,"text":60,"correct":22},"大型精密机床",{"key":27,"text":62,"correct":32},"空调机",{"key":30,"text":64,"correct":32},"变压器",{"key":34,"text":66,"correct":22},"高精度的大型连轧机组","BE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1136858,"设备基础混凝土强度的验收，主要检查验收其（）是否符合设计要求。",[72,74,76,78,80],{"key":20,"text":73,"correct":32},"外观观感",{"key":24,"text":75,"correct":22},"混凝土配比",{"key":27,"text":77,"correct":22},"混凝土养护",{"key":30,"text":79,"correct":32},"基础表面平整度",{"key":34,"text":81,"correct":22},"混凝土强度","BCE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1136859,"框架式基础是由顶层梁板、立柱和底层梁板结构组成的基础，适用于作为（）设备的基础。",[87,89,91,93,95],{"key":20,"text":88,"correct":32},"承受荷载较小",{"key":24,"text":90,"correct":22},"电机",{"key":27,"text":92,"correct":32},"精度",{"key":30,"text":94,"correct":22},"压缩机",{"key":34,"text":96,"correct":32},"有特殊保温要求","BD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":82,"analysis":37},1136860,"划定机械设备安装基准线和基准点的依据有（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":32},"设备中心线",{"key":24,"text":105,"correct":22},"工艺布置图",{"key":27,"text":107,"correct":22},"有关建筑物的标高线",{"key":30,"text":109,"correct":32},"工艺系统原理图",{"key":34,"text":111,"correct":22},"有关建筑物的边缘线",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1136861,"机械设备安装的一般程序包括（）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"开箱检查",{"key":24,"text":119,"correct":22},"基础测量放线",{"key":27,"text":121,"correct":22},"润滑与设备加油",{"key":30,"text":123,"correct":32},"工程验收",{"key":34,"text":125,"correct":32},"投入运行","ABC",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1136862,"现场组装大型设备，各运动部件之间的相对运动精度包括（）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"直线运动精度",{"key":24,"text":134,"correct":32},"配合间隙",{"key":27,"text":136,"correct":22},"圆周运动精度",{"key":30,"text":138,"correct":32},"过盈量",{"key":34,"text":140,"correct":22},"传动精度","ACE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1136863,"大型设备的解体安装要保证（）。",[146,148,150,152,154],{"key":20,"text":147,"correct":32},"各设备间相对运动精度",{"key":24,"text":149,"correct":22},"各设备间相互位置精度",{"key":27,"text":151,"correct":22},"再现设备制造精度",{"key":30,"text":153,"correct":22},"再现设备装配精度",{"key":34,"text":155,"correct":22},"设备的定位位置精度","BCDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":97,"analysis":37},1136864,"桩基础的作用是（）。",[161,163,165,167,169],{"key":20,"text":162,"correct":32},"允许设备位移",{"key":24,"text":164,"correct":22},"减弱基础振动",{"key":27,"text":166,"correct":32},"减轻运转噪声",{"key":30,"text":168,"correct":22},"控制基础沉降",{"key":34,"text":170,"correct":32},"便于负荷传递",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":141,"analysis":37},1136865,"设备基础混凝土强度质量合格证明书，主要检查（ ）是否符合设计要求。",[175,176,178,179,181],{"key":20,"text":81,"correct":22},{"key":24,"text":177,"correct":32},"位置",{"key":27,"text":77,"correct":22},{"key":30,"text":180,"correct":32},"几何尺寸",{"key":34,"text":182,"correct":22},"混凝土配合比",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":52,"analysis":37},1136866,"预埋地脚螺栓验收时，其（ ）应符合施工图的要求。",[187,189,191,192,194],{"key":20,"text":188,"correct":32},"预埋方式",{"key":24,"text":190,"correct":32},"垫铁预留空间",{"key":27,"text":177,"correct":22},{"key":30,"text":193,"correct":22},"标高",{"key":34,"text":195,"correct":22},"露出基础的长度",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":210,"analysis":37},1136867,"设备安装精度调整与检测时，不属于检测设备与零部件之间的相对位置误差的是（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"设备中心位置",{"key":24,"text":203,"correct":22},"水平度",{"key":27,"text":205,"correct":32},"垂直度",{"key":30,"text":207,"correct":32},"平行度",{"key":34,"text":209,"correct":32},"同轴度","AB",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":225,"analysis":37},1136868,"在火灾危险环境中的电气设备，其接地要求有（）。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"电气设备的金属外壳应可靠接地",{"key":24,"text":218,"correct":32},"接地干线应采用铜导线",{"key":27,"text":220,"correct":32},"接地支线的最小截面为1.5㎜2",{"key":30,"text":222,"correct":22},"接地干线应有不少于两处与接地体连接",{"key":34,"text":224,"correct":32},"接闪针的接地应与电气接地合并","AD",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},1136869,"架空线路竣工验收检查的内容有（）等。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"杆塔是否直立",{"key":24,"text":233,"correct":32},"在阴天实测电阻，不得超过规定值",{"key":27,"text":235,"correct":22},"拉线是否紧固",{"key":30,"text":237,"correct":22},"拉线坑、杆塔坑是否符合填土要求",{"key":34,"text":239,"correct":22},"杆塔全高误差值是否符合原设计要求","ACDE",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":255,"analysis":37},1136870,"下列电动机的绝缘电阻测试数据，需要进行干燥的有（）。",[245,247,249,251,253],{"key":20,"text":246,"correct":22},"380V电动机绝缘电阻测试值为0.5kΩ\u002FV",{"key":24,"text":248,"correct":32},"380V电动机绝缘电阻测试值为1.0kΩ\u002FV",{"key":27,"text":250,"correct":22},"10kV电动机定子绕组绝缘电阻测试值为0.5MΩ\u002FkV",{"key":30,"text":252,"correct":32},"10kV电动机定子绕组绝缘电阻测试值为1.0MΩ\u002FkV",{"key":34,"text":254,"correct":32},"10kV电动机绝缘电阻测试值为10MΩ\u002FkV","AC",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":36,"analysis":37},1136871,"机电工程中，接闪器安装要求有（）。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"接闪器的各节位置应符合出厂标志的编号",{"key":24,"text":263,"correct":22},"排气式接闪器应避免其排出的气体引起相间闪络",{"key":27,"text":265,"correct":22},"氧化锌接闪器的接地线应不小于16mm2的软铜线",{"key":30,"text":267,"correct":32},"系统电压3kv时，裸导体对地及相间距离应小于90mm",{"key":34,"text":269,"correct":22},"管型避雷器与被保护设备连接线长度不得大于4m",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":284,"analysis":37},1136872,"配电装置开箱检查应注意事项有（）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"设备型号规格符合设计要求",{"key":24,"text":277,"correct":22},"柜内绝缘瓷瓶无损伤和裂纹",{"key":27,"text":279,"correct":22},"安装说明及技术文件应齐全",{"key":30,"text":281,"correct":22},"电器设备和元件均有合格证",{"key":34,"text":283,"correct":32},"有关键部件制造许可证原件","ABCD",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":298,"analysis":37},1136873,"在有爆炸性气体环境2区内的电气设备的接地要求有（）。",[289,290,292,294,296],{"key":20,"text":216,"correct":22},{"key":24,"text":291,"correct":32},"电气照明灯具应有专门的接地线",{"key":27,"text":293,"correct":22},"电气动力设备应有专门的接地线",{"key":30,"text":295,"correct":22},"接地干线应不同的方向不少于两处与接地体连接",{"key":34,"text":297,"correct":32},"避雷针的接地应与电气接地合并","ACD",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":156,"analysis":37},1136874,"机电工程中，接闪器的试验内容有（）。",[303,305,307,309,311],{"key":20,"text":304,"correct":32},"测量接闪器的直流电阻",{"key":24,"text":306,"correct":22},"测量接闪器的泄漏电流",{"key":27,"text":308,"correct":22},"测量磁吹接闪器的交流电导电流",{"key":30,"text":310,"correct":22},"测量金属氧化物接闪器的持续电流",{"key":34,"text":312,"correct":22},"测量金属氧化物接闪器的工频参考电压",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":126,"analysis":37},1136875,"关于变压器送电试运行的说法，正确的有（）。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"变压器第一次投入时可全压冲击合闸",{"key":24,"text":320,"correct":22},"变压器应进行5次空载全压冲击合闸",{"key":27,"text":322,"correct":22},"第一次受电的持续时间不应少于10min",{"key":30,"text":324,"correct":32},"变压器试运行要注意短路电流和空载电流",{"key":34,"text":326,"correct":32},"变压器空载运行12h后方可投入负荷运行",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":341,"analysis":37},1136876,"配电装置高压的试验内容有（）。",[331,333,335,337,339],{"key":20,"text":332,"correct":22},"关断能力试验",{"key":24,"text":334,"correct":22},"机械试验",{"key":27,"text":336,"correct":32},"漏电试验",{"key":30,"text":338,"correct":22},"温升试验",{"key":34,"text":340,"correct":22},"峰值耐受电流试验","ABDE",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":356,"analysis":37},1136877,"金属储罐等防静电的接地要求有（）。",[346,348,350,352,354],{"key":20,"text":347,"correct":32},"防静电的接地装置应单独设置",{"key":24,"text":349,"correct":22},"接地线应单独与接地干线相连",{"key":27,"text":351,"correct":22},"接地线的连接螺栓不应小于M10",{"key":30,"text":353,"correct":22},"防静电的接地装置可共同设置",{"key":34,"text":355,"correct":32},"并列防静电接地可以串联连接","BCD",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":36,"analysis":37},1136878,"10kV电缆线路敷设后，正确的电缆绝缘电阻测量方法有（）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"使用2500V兆欧表测量",{"key":24,"text":364,"correct":22},"测量前将电缆接地放电",{"key":27,"text":366,"correct":22},"当接地线路较长时，放电时间不得少于1min",{"key":30,"text":368,"correct":32},"测量时间应不少于10min",{"key":34,"text":370,"correct":22},"测量后电缆应再次接地放电",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":284,"analysis":37},1136879,"关于悬式绝缘子和支柱绝缘子的绝缘电阻测量的说法，正确的是（）。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"每片悬式绝缘子的绝缘电阻值，不应低于300MΩ",{"key":24,"text":378,"correct":22},"35kV及以下的支柱绝缘子的绝缘电阻值，不应低于500MΩ",{"key":27,"text":380,"correct":22},"采用2500V兆欧表测量绝缘子的绝缘电阻值，可按同批产品数量的10%抽查",{"key":30,"text":382,"correct":22},"棒式绝缘子不进行此项试验",{"key":34,"text":384,"correct":32},"每片悬式绝缘子的绝缘电阻值，不应低于500MΩ",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":156,"analysis":37},1136880,"对于高压管道及输送剧毒流体的管道，试压前应建立和审查的资料包括（）。",[389,391,393,395,397],{"key":20,"text":390,"correct":32},"管道合格证书",{"key":24,"text":392,"correct":22},"管道加工记录",{"key":27,"text":394,"correct":22},"焊接检验及热处理记录",{"key":30,"text":396,"correct":22},"管道组成件的检验或试验记录",{"key":34,"text":398,"correct":22},"管道组成件的质量证明书",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":52,"analysis":37},1136881,"吹洗方法应根据对管道的（）确定。",[403,405,407,409,411],{"key":20,"text":404,"correct":32},"设计要求",{"key":24,"text":406,"correct":32},"施工要求",{"key":27,"text":408,"correct":22},"使用要求",{"key":30,"text":410,"correct":22},"工作介质",{"key":34,"text":412,"correct":22},"管道内脏污程度",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":255,"analysis":37},1136882,"压力试验是以液体和气体为介质，对管道逐步加压，达到规定的压力，以检查（）",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"管道系统的强度",{"key":24,"text":420,"correct":32},"清除管道内部杂物",{"key":27,"text":422,"correct":22},"管道系统严密性",{"key":30,"text":424,"correct":32},"管道抵抗变形能力",{"key":34,"text":426,"correct":32},"管架及基础牢固程度",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":356,"analysis":37},1136883,"在工业管道安装前应完成工作有（）。",[431,433,435,437,439],{"key":20,"text":432,"correct":32},"清洗",{"key":24,"text":434,"correct":22},"脱脂",{"key":27,"text":436,"correct":22},"内防腐",{"key":30,"text":438,"correct":22},"衬里",{"key":34,"text":440,"correct":32},"试压",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":455,"analysis":37},1136884,"下列元件中，在管道压力试验前必须拆除或加以隔离的有（）。",[445,447,449,451,453],{"key":20,"text":446,"correct":32},"调节阀",{"key":24,"text":448,"correct":22},"安全阀",{"key":27,"text":450,"correct":32},"闸阀",{"key":30,"text":452,"correct":22},"爆破板",{"key":34,"text":454,"correct":22},"仪表元件","BDE",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":284,"analysis":37},1136885,"工业金属管道安装前施工的现场和开工条件表述准确的是（）。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"管道组成件及管道支承件等已检验合格",{"key":24,"text":463,"correct":22},"脱脂、内部防腐、衬里等已施工完毕",{"key":27,"text":465,"correct":22},"土建工程经检查合格并办理了交接手续",{"key":30,"text":467,"correct":22},"施工组织设计编制完毕并得到批准",{"key":34,"text":469,"correct":32},"安装单位已向工程所在地质量技术监督部门口头通知",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":455,"analysis":37},1136886,"管道进行压力试验前应将待试管道上的（）拆下或加以隔离。",[474,475,476,477,479],{"key":20,"text":446,"correct":32},{"key":24,"text":448,"correct":22},{"key":27,"text":450,"correct":32},{"key":30,"text":478,"correct":22},"爆破片",{"key":34,"text":454,"correct":22},{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":210,"analysis":37},1136887,"管道气压试验可以根据输送介质的要求，以选用（）气体为宜。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"干燥洁净的空气",{"key":24,"text":487,"correct":22},"氮气",{"key":27,"text":489,"correct":32},"氧气",{"key":30,"text":491,"correct":32},"天然气",{"key":34,"text":493,"correct":32},"CO气",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":508,"analysis":37},1136888,"下列是根据管道内物质性能而标注的基本识别色，正确的有（）。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"水是艳绿色",{"key":24,"text":501,"correct":22},"空气是淡灰色",{"key":27,"text":503,"correct":32},"气体是黄色",{"key":30,"text":505,"correct":32},"水蒸气是红色",{"key":34,"text":507,"correct":22},"氧是淡蓝色","ABE",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":126,"analysis":37},1136889,"热力管道的安装应满足的要求是（）。",[513,515,517,519,521],{"key":20,"text":514,"correct":22},"补偿器竖直安装时，若管道输送的介质为热水，应在补偿器的最高点安装放气阀",{"key":24,"text":516,"correct":22},"热力管道可采用架空敷设或地沟敷设",{"key":27,"text":518,"correct":22},"两个补偿器之间（一般为20~40m）以及每一个补偿器两侧（指远的一端）应设置固定支架",{"key":30,"text":520,"correct":32},"弹簧支架一般装在有横向膨胀伸缩而无垂直膨胀伸缩之处",{"key":34,"text":522,"correct":32},"管道安装时应设置坡度，室内管道的坡度为0.003",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":356,"analysis":37},1136890,"根据《工业管道的基本识别色、识别符号和安全标识》GB7231-2003国家标准，工业管道的识别符号由（）组成。",[527,529,531,533,535],{"key":20,"text":528,"correct":32},"使用性能",{"key":24,"text":530,"correct":22},"物质名称",{"key":27,"text":532,"correct":22},"介质流向",{"key":30,"text":534,"correct":22},"工艺参数",{"key":34,"text":536,"correct":32},"安全图例",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":298,"analysis":37},1136891,"关于管道安装现场条件的表述，正确的是（）。",[541,542,544,546,548],{"key":20,"text":461,"correct":22},{"key":24,"text":543,"correct":32},"管道施工前，安装单位应当向管道安装工程所在地负责管道使用登记的质量技术监督部门书面告知",{"key":27,"text":545,"correct":22},"临时供水、供电、供气等设施已满足安装施工要求",{"key":30,"text":547,"correct":22},"与管道连接的设备安装已找正合格、固定完毕，标高、中心线、管口方位符合设计要求",{"key":34,"text":549,"correct":32},"施工单位已编制施工组织设计并报建设单位进行审核",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":508,"analysis":37},1136892,"热力管道补偿器竖直安装时，表述正确的选项是（）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"管道输送热水介质，补偿器的最高点安装放气阀",{"key":24,"text":557,"correct":22},"管道输送热水介质，补偿器的最低点安装放水阀",{"key":27,"text":559,"correct":32},"管道输送热水介质，补偿器的最高点安装放水阀",{"key":30,"text":561,"correct":32},"管道输送热水介质，补偿器的最低点安装放气阀",{"key":34,"text":563,"correct":22},"管道输送蒸汽介质，补偿器的最低点安装放水阀",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":356,"analysis":37},1136893,"工程交接验收前，建设单位应检查工业管道工程施工的技术资料有（）。",[568,570,572,574,576],{"key":20,"text":569,"correct":32},"施工标准规范",{"key":24,"text":571,"correct":22},"技术文件",{"key":27,"text":573,"correct":22},"施工记录",{"key":30,"text":575,"correct":22},"试验报告",{"key":34,"text":577,"correct":32},"施工单位资质",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":592,"analysis":37},1136894,"当现场条件不允许进行管道液压和气压试验时，经过设计或建设单位同意，也可以采取其他方法代替压力试验，下面替代方式正确的选项是（）。",[582,584,586,588,590],{"key":20,"text":583,"correct":22},"所有环向、纵向对接焊缝和螺旋缝焊缝应进行100%射线检测和100%超声检测",{"key":24,"text":585,"correct":32},"所有环向、纵向对接焊缝和螺旋缝焊缝应进行100%渗透检测或100%磁粉检测",{"key":27,"text":587,"correct":32},"施工单位应进行管道系统的柔性分析",{"key":30,"text":589,"correct":32},"在设计文件中明确规定管道系统采用敏感气体或浸入液体的方法进行真空度试验",{"key":34,"text":591,"correct":22},"未经液压和气压试验的管道焊缝和法兰密封部位，可配备相应的预保压密封夹具","AE",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":341,"analysis":37},1136895,"金属储罐的浮顶及内浮顶升降试验合格标准有（）。",[597,599,601,603,605],{"key":20,"text":598,"correct":22},"浮顶升降平稳",{"key":24,"text":600,"correct":22},"导向机构、密封装置无卡涩现象",{"key":27,"text":602,"correct":32},"浮顶无异常变形",{"key":30,"text":604,"correct":22},"扶梯转动灵活",{"key":34,"text":606,"correct":22},"浮顶与液面接触部分无渗漏",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":508,"analysis":37},1136896,"球形罐制造单位提供的产品质量证明书应有（）。",[611,613,615,617,619],{"key":20,"text":612,"correct":22},"制造竣工图样",{"key":24,"text":614,"correct":22},"压力容器产品合格证",{"key":27,"text":616,"correct":32},"焊后整体热处理报告",{"key":30,"text":618,"correct":32},"耐压试验和泄漏试验记录",{"key":34,"text":620,"correct":22},"特种设备制造监督检验证书",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":52,"analysis":37},1136897,"《钢结构工程施工质量验收规范》规定，钢材的切割面或剪切面，不允许存在的缺陷有（）。",[625,627,629,631,633],{"key":20,"text":626,"correct":32},"卷边",{"key":24,"text":628,"correct":32},"切痕",{"key":27,"text":630,"correct":22},"裂纹",{"key":30,"text":632,"correct":22},"夹渣",{"key":34,"text":634,"correct":22},"分层",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":156,"analysis":37},1136899,"多层和高层钢结构的多节柱安装时，每节钢柱的定位轴线的下列导引方法中，不正确的有（）。",[639,641,643,645,647],{"key":20,"text":640,"correct":32},"从地面控制轴线直接引上",{"key":24,"text":642,"correct":22},"从中层柱的轴线引上",{"key":27,"text":644,"correct":22},"从顶端控制轴线直接引下",{"key":30,"text":646,"correct":22},"从上层柱的轴线引下",{"key":34,"text":648,"correct":22},"从下层柱的轴线引上",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":663,"analysis":37},1136900,"金属储罐根据储罐顶部结构特点，可分为（）。",[653,655,657,659,661],{"key":20,"text":654,"correct":32},"双层储罐",{"key":24,"text":656,"correct":22},"固定拱顶储罐",{"key":27,"text":658,"correct":22},"浮顶储罐",{"key":30,"text":660,"correct":32},"内浮顶储罐",{"key":34,"text":662,"correct":32},"网壳顶储罐","BC",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":298,"analysis":37},1136901,"壳板分片结构形式为混合式的球罐各带球壳扳分别采用桔辩式或足球式，以下各带中，采用形式正确的有（）。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"赤道带采用桔瓣式",{"key":24,"text":671,"correct":32},"上温带采用足球式",{"key":27,"text":673,"correct":22},"下温带采用桔瓣式",{"key":30,"text":675,"correct":22},"上极板采用足球式",{"key":34,"text":677,"correct":32},"下极板采用桔瓣式",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":508,"analysis":37},1136902,"球形罐焊后整体热处理测温点的布置，符合要求的有（）。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"在球壳外表面均匀布置",{"key":24,"text":685,"correct":22},"相邻测温点间距小于4.5m",{"key":27,"text":687,"correct":32},"上、下人孔法兰各设置1个测温点",{"key":30,"text":689,"correct":32},"柱脚板各设置1个测温点",{"key":34,"text":691,"correct":22},"每个产品焊接试板设置1个测温点",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":141,"analysis":37},1136903,"下列关于高强度螺栓紧固施工工艺技术要求的表述中，正确的有（）。",[696,698,700,702,704],{"key":20,"text":697,"correct":22},"紧固高强度螺栓的测力扳手应在作业前校正",{"key":24,"text":699,"correct":32},"现场安装高强度螺栓穿入不畅时可以对高强度螺栓孔进行气割扩孔",{"key":27,"text":701,"correct":22},"高强度螺栓的拧紧宜在24h内完成",{"key":30,"text":703,"correct":32},"高强度螺栓施拧宜由螺栓群一侧向另一侧顺序拧紧",{"key":34,"text":705,"correct":22},"高强度螺栓的拧紧分为初拧和终拧",{"id":707,"libraryId":5,"type":15,"typeLabel":16,"stem":708,"options":709,"answer":720,"analysis":37},1136904,"钢网架结构要求所测定挠度值不应超过相应设计值的1.15倍，挠度值测量应分别在工序（）完成时进行。",[710,712,714,716,718],{"key":20,"text":711,"correct":32},"地面组装",{"key":24,"text":713,"correct":32},"装配",{"key":27,"text":715,"correct":32},"单元网格安装",{"key":30,"text":717,"correct":22},"总拼装",{"key":34,"text":719,"correct":22},"屋面工程","DE",{"id":722,"libraryId":5,"type":15,"typeLabel":16,"stem":723,"options":724,"answer":735,"analysis":37},1136905,"钢结构安装中对高强度螺栓的要求有（）。",[725,727,729,731,733],{"key":20,"text":726,"correct":22},"抗滑移系数试验和复验合格方可进行安装",{"key":24,"text":728,"correct":22},"穿入方向一致",{"key":27,"text":730,"correct":32},"终拧后用1kg的小锤敲击螺母",{"key":30,"text":732,"correct":22},"拧紧在24小时内完成",{"key":34,"text":734,"correct":32},"采用气割孔","ABD",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]