[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,26,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,450,462,474,486,498,510,522,534,543,555,567,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1136600,1,"单选题","（2014年真题）通常情况下，耐火浇注料搅拌均匀后应在（ ）内完成浇注。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","30min",true,{"key":24,"text":25,"correct":26},"B","45min",false,{"key":28,"text":29,"correct":26},"C","60min",{"key":31,"text":32,"correct":26},"D","90min","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1136601,"（2015年真题）炉底为反拱形的炉窑砌筑前，找准砌筑弧形基面的方法是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"采用样板找准",{"key":24,"text":41,"correct":26},"用加工砖找准",{"key":28,"text":43,"correct":26},"测量弧底标高",{"key":31,"text":45,"correct":26},"设置基准线",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1136602,"（2018年真题）不符合耐火陶瓷纤维施工技术要求的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"制品不得受挤压",{"key":24,"text":53,"correct":22},"制品粘贴时不受潮湿影响",{"key":28,"text":55,"correct":26},"粘贴面应清洁和平整",{"key":31,"text":57,"correct":26},"粘结剂使用时应搅拌均匀",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1136603,"（2016年真题）耐火喷涂料喷涂完毕后，应及时（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"作防水处理",{"key":24,"text":65,"correct":26},"进行烘干",{"key":28,"text":67,"correct":22},"开设膨胀缝",{"key":31,"text":69,"correct":26},"敲击释放应力",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1136604,"（2012年真题）工业炉在烘炉阶段需要做的工作是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"制定烘炉计划",{"key":24,"text":77,"correct":26},"进行全面验收",{"key":28,"text":79,"correct":26},"工业炉内衬施工",{"key":31,"text":81,"correct":26},"有关热工仪表安装",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1136605,"（2020年真题）工业炉窑烘炉前应完成的工作是()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"对炉体预加热",{"key":24,"text":89,"correct":22},"烘干烟道和烟囱",{"key":28,"text":91,"correct":26},"烘干物料通道",{"key":31,"text":93,"correct":26},"烘干送风管道",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1136606,"（2016年真题）机电工程项目实施阶段的工作不包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"勘察",{"key":24,"text":101,"correct":26},"设计",{"key":28,"text":103,"correct":26},"建设准备",{"key":31,"text":105,"correct":22},"环境影响评价",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1136607,"（2016年真题）机电工程项目服务采购包括（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"招标文件编制",{"key":24,"text":113,"correct":26},"机电设备调试",{"key":28,"text":115,"correct":26},"机电设备运输",{"key":31,"text":117,"correct":26},"机电工程保修",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1136608,"（2016年真题）电子招投标在截止投标时间前，可解密提取投标文件的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"招投标管理部门",{"key":24,"text":125,"correct":26},"招投标监督部门",{"key":28,"text":127,"correct":26},"招标人",{"key":31,"text":129,"correct":22},"投标人",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1136609,"（2016年真题）下列文件中，属于施工承包合同文件的是（ ）",[134,136,138,140],{"key":20,"text":135,"correct":22},"中标通知书",{"key":24,"text":137,"correct":26},"设计变更申请书",{"key":28,"text":139,"correct":26},"监理下达的整改通知书",{"key":31,"text":141,"correct":26},"工程结算文件",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1136610,"（2019年真题）设备采购实施阶段的工作不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"报价与评审",{"key":24,"text":149,"correct":26},"接受请购文件",{"key":28,"text":151,"correct":26},"催交与检验",{"key":31,"text":153,"correct":22},"编制采购计划",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1136611,"（2016年真题）下列设备验收内容中，不属于外观检查的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"润滑油脂",{"key":24,"text":161,"correct":26},"非加工表面",{"key":28,"text":163,"correct":26},"管缆布置",{"key":31,"text":165,"correct":26},"焊接结构件",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1136612,"（2016年真题）施工方案编制内容的核心是（ ）",[170,172,174,176],{"key":20,"text":171,"correct":26},"施工进度计划",{"key":24,"text":173,"correct":22},"施工方法",{"key":28,"text":175,"correct":26},"安全技术措施",{"key":31,"text":177,"correct":26},"质量管理措施",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1136613,"（2019年真题）以下施工组织设计的编制依据中，不属于工程文件的是（ ）",[182,184,186,188],{"key":20,"text":183,"correct":26},"施工图纸",{"key":24,"text":185,"correct":22},"标准规范",{"key":28,"text":187,"correct":26},"技术协议",{"key":31,"text":189,"correct":26},"会议纪要",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1136615,"（2016年真题）关于机电工程无损检测人员的说法，正确的是（ ）",[194,196,198,200],{"key":20,"text":195,"correct":26},"无损检测人员的资格证书有效期以上级公司规定为准",{"key":24,"text":197,"correct":26},"无损检测Ⅰ级人员可评定检测结果",{"key":28,"text":199,"correct":26},"无损检测Ⅱ级人员可审核检测报告",{"key":31,"text":201,"correct":22},"无损检测Ⅲ级人员可根据标准编制无损检测工艺",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1136616,"（2017年真题）机电工程项目部对劳务分承包单位协调管理的重点是（ ）",[206,208,210,212],{"key":20,"text":207,"correct":22},"作业面的调整",{"key":24,"text":209,"correct":26},"施工物质的采购",{"key":28,"text":211,"correct":26},"质量安全制度制定",{"key":31,"text":213,"correct":26},"临时设施布置",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1136617,"（2019年真题）施工阶段项目成本控制要点包括（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"落实成本计划",{"key":24,"text":221,"correct":26},"成本预测",{"key":28,"text":223,"correct":26},"成本计划分解",{"key":31,"text":225,"correct":26},"成本考核",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1136618,"（2017年真题）机电工程安装风险控制的技术措施（ ）",[230,232,234,236],{"key":20,"text":231,"correct":22},"降低风险的措施",{"key":24,"text":233,"correct":26},"完善管理程序和操作规程",{"key":28,"text":235,"correct":26},"落实应急预案",{"key":31,"text":237,"correct":26},"安全和环境教育培训",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1136619,"（2015年真题）A 公司承包某市大型标志性建筑大厦机电工程项目，内容包括管道安装、电气设备安装及通风空调工 程，建设单位要求 A 公司严格实施绿色施工，严格安全和质量管理，并签订了施工合同。 A 公司项目部制定了绿色施工管理和环境保护的绿色施工措施，提交建设单位后，建设单位认为绿色 施工内容不能满足施工要求，建议补充完善。施工中项目部按规定多次对施工现场进行安全检查，仍反复 出现设备员装指挥信号不明确或多人同时指挥；个别电焊工无证上岗，雨天高空作业；临时楼梯未设护栏 等多项安全隐患。项目部经认真分析总结，认为是施工现场安全检查未抓住重点，经整改后效果明显。 【问题】 2.根据背景资料，归纳施工现场安全检查重点？",[242,243,244,245],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":26},{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},1136620,"（2020年真题）关于施工单位应急预案演练的说法，错误的是()。",[250,252,254,256],{"key":20,"text":251,"correct":26},"每年至少组织一次综合应急预案演练",{"key":24,"text":253,"correct":26},"每年至少组织一次专项应急预案演练",{"key":28,"text":255,"correct":26},"每半年至少组织一次现场处置方案演练",{"key":31,"text":257,"correct":22},"每年至少组织一次安全事故应急预案演练",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},1136621,"（2020年真题）机电工程工序质量检查的基本方法不包括()。",[262,264,266,268],{"key":20,"text":263,"correct":26},"试验检验法",{"key":24,"text":265,"correct":26},"实测检验法",{"key":28,"text":267,"correct":22},"抽样检验法",{"key":31,"text":269,"correct":26},"感官检验法",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},1136622,"（2019年真题）离心式给水泵试运转后，不必进行的工作是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"关闭泵的入口阀门",{"key":24,"text":277,"correct":26},"关闭附属系统的阀门",{"key":28,"text":279,"correct":22},"清水冲洗泵",{"key":31,"text":281,"correct":26},"排除积液",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},1136623,"（2020年真题）压缩机空负荷试运行后，做法错误的是()。",[286,288,290,292],{"key":20,"text":287,"correct":22},"停机后立刻打开曲轴箱检查",{"key":24,"text":289,"correct":26},"排除气路及气罐中的剩余压力",{"key":28,"text":291,"correct":26},"清洗油过滤器和更换润滑油",{"key":31,"text":293,"correct":26},"排除气缸及管路中的冷凝液体",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":20,"analysis":33},1136624,"（2020年真题）工业建设项目正式竣工验收会议的主要任务不包括()。",[298,300,302,304],{"key":20,"text":299,"correct":22},"编制竣工决算",{"key":24,"text":301,"correct":26},"查验工程质量",{"key":28,"text":303,"correct":26},"审查生产准备",{"key":31,"text":305,"correct":26},"核定遗留尾工",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":24,"analysis":33},1136625,"（2017年真题）根据《建设工程质量管理条例》，建设工程在正常使用条件下，最低保修期要求的说法，错误的是（ ）",[310,312,314,316],{"key":20,"text":311,"correct":26},"设备安装工程保修期为 2 年",{"key":24,"text":313,"correct":22},"电气管线安装工程保修期为 3 年",{"key":28,"text":315,"correct":26},"供热系统保修期为 2 个供暖期",{"key":31,"text":317,"correct":26},"供冷系统保修期为 2 个供冷期",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1136626,"（2019年真题）下列关于保修期的说法，符合规定的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"保修自竣工验收合格之日计算",{"key":24,"text":325,"correct":26},"电气设备工程的最低保修期为 3 年",{"key":28,"text":327,"correct":26},"供暖管道的最低保修期为 1 年",{"key":31,"text":329,"correct":26},"给排水管道工程的最低保修期为 5 年",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":28,"analysis":33},1136627,"（2019年真题）不合格品经设计单位检测满足使用要求，可采取的处理方式是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":26},"返修处理",{"key":24,"text":337,"correct":26},"返工处理",{"key":28,"text":339,"correct":22},"不作处理",{"key":31,"text":341,"correct":26},"降级使用",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1136628,"（2016年真题）工业安装分项工程质量验收时，验收成员不包括（ ）",[346,348,350,352],{"key":20,"text":347,"correct":26},"建设单位专业技术负责人",{"key":24,"text":349,"correct":22},"设计单位驻现场代表",{"key":28,"text":351,"correct":26},"施工单位专业技术质量负责人",{"key":31,"text":353,"correct":26},"监理工程师",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1136629,"（2019年真题）.自动化仪表安装工程中，主控制室的仪表分部工程不包括（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"取源部件安装",{"key":24,"text":361,"correct":26},"仪表线路安装",{"key":28,"text":363,"correct":26},"电源设备安装",{"key":31,"text":365,"correct":26},"仪表盘柜安装",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},1136630,"（2013年真题）工业安装工程单位工程质量控制资料检查记录表中的结论应由（ ）填写。",[370,372,374,376],{"key":20,"text":371,"correct":26},"施工单位",{"key":24,"text":373,"correct":26},"监理单位",{"key":28,"text":375,"correct":22},"建设单位",{"key":31,"text":377,"correct":26},"质监单位",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1136631,"（2018年真题）在工业安装分部工程验收记录表上，签字无效的人是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":22},"项目监理工程师",{"key":24,"text":385,"correct":26},"施工单位项目负责人",{"key":28,"text":387,"correct":26},"设计单位项目负责人",{"key":31,"text":389,"correct":26},"建设单位项目技术负责人",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":31,"analysis":33},1136632,"（2017年真题）关于工业设备安装工程划分的说法，错误的是（ ）",[394,396,398,400],{"key":20,"text":395,"correct":26},"分项工程应按设备的台（套），机组划分",{"key":24,"text":397,"correct":26},"同一单位工程中的设备安装工程，可以划分为一个分部工程",{"key":28,"text":399,"correct":26},"大型设备安装工程，可单独构成单位工程",{"key":31,"text":401,"correct":22},"大型设备安装工程的分项工程不能按工序划分",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},1136633,"（2020年真题）下列分项工程质量验收中，属于一般项目的是()。",[406,408,410,412],{"key":20,"text":407,"correct":26},"风管系统测定",{"key":24,"text":409,"correct":26},"阀门压力试验",{"key":28,"text":411,"correct":22},"灯具垂直偏差",{"key":31,"text":413,"correct":26},"管道焊接材料",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},1136634,"（2019年真题）属于安装工程一般项目的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":26},"保证主要使用功能要求的检验项目",{"key":24,"text":421,"correct":26},"保证工程安全、节能和环保的检验项目",{"key":28,"text":423,"correct":22},"因无法定量而采取定性检验的项目",{"key":31,"text":425,"correct":26},"确定该检验批主要性能的检验项目",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":31,"analysis":33},1136635,"（2018年真题）关于总承包单位与分包单位质量责任的说法，正确的是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"当分包工程发生质量问题时，建设单位只能向分包单位请求赔偿",{"key":24,"text":433,"correct":26},"分包单位对承包的项目进行验收时，总包单位不需要派人参加",{"key":28,"text":435,"correct":26},"总包单位不用对分包单位所承担的工程质量负责",{"key":31,"text":437,"correct":22},"单位工程质量验收时，总包与分包单位的有关人员应参加验收",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1136637,"（2011年真题）下列电气工程验收资料中，属于安全和功能检测资料的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"照明全负荷试验记录",{"key":24,"text":445,"correct":26},"配电柜安装记录",{"key":28,"text":447,"correct":26},"管线敷设记录",{"key":31,"text":449,"correct":26},"接地干线焊接记录",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},1136638,"（2017年真题）下列建筑安装工程检验批的质量验收中，属于一般检验项目的是（ ）",[454,456,458,460],{"key":20,"text":455,"correct":26},"重要材料",{"key":24,"text":457,"correct":26},"管道的压力试验",{"key":28,"text":459,"correct":22},"卫生器具给水配件安装",{"key":31,"text":461,"correct":26},"风管系统的测定",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1136639,"（2013年真题）建筑安装工程分部工程划分的原则是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":26},"按主要工种、材料来确定",{"key":24,"text":469,"correct":26},"按设备类别来确定",{"key":28,"text":471,"correct":22},"按专业性质、建筑部位来确定",{"key":31,"text":473,"correct":26},"按施工工艺来确定",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":33},1136640,"（2015年真题）计量器具修理后的检定属于（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"使用中检定",{"key":24,"text":481,"correct":26},"周期检定",{"key":28,"text":483,"correct":22},"后续检定",{"key":31,"text":485,"correct":26},"仲裁检定",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},1136641,"（2013年真题）根据《计量法》，关于计量器具使用的说法，正确的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"计量标准器具是国家计量基准器具",{"key":24,"text":493,"correct":26},"进口的计量器具必须经国务院计量行政部门检定合格后使用",{"key":28,"text":495,"correct":26},"检测器具的测量极限误差必须大于被测对象所能允许的测量极限误差",{"key":31,"text":497,"correct":22},"强制检定与非强制检定均属于法制检定",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1136642,"（2019年真题）关于计量器具的使用管理规定，正确的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"计量器具的测量极限误差大于被测对象所能允许的极限误差",{"key":24,"text":505,"correct":26},"检测器具应采用相同的防护措施混合存放",{"key":28,"text":507,"correct":26},"封存的计量器具办理启用手续后不需检定",{"key":31,"text":509,"correct":22},"对检定标识不清的计量器具应视为不合格",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},1136643,"（2011年真题）衡量计量器具质量的主要指标是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"灵敏度、分辨率、动态特性",{"key":24,"text":517,"correct":26},"稳定性、准确度、静态特性",{"key":28,"text":519,"correct":26},"动态特性、分辨率、精密度",{"key":31,"text":521,"correct":26},"统一性、溯源性、准确度",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":24,"analysis":33},1136644,"（2012年真题）经国务院计量行政部门批准作为统一全国量值最高依据的计量器具是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"计量标准器具",{"key":24,"text":529,"correct":22},"计量基准器具",{"key":28,"text":531,"correct":26},"工作计量器具",{"key":31,"text":533,"correct":26},"专用计量器具",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":28,"analysis":33},1136645,"（2014年真题）控制计量器具使用状态的检定是（ ）。",[538,539,540,541],{"key":20,"text":483,"correct":26},{"key":24,"text":481,"correct":26},{"key":28,"text":479,"correct":22},{"key":31,"text":542,"correct":26},"—次性检定",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1136646,"（2020年真题）下列计量器具中，应纳入企业最高计量标准器具管理的是()。",[547,549,551,553],{"key":20,"text":548,"correct":26},"温度计",{"key":24,"text":550,"correct":22},"兆欧表",{"key":28,"text":552,"correct":26},"压力表",{"key":31,"text":554,"correct":26},"万用表",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":28,"analysis":33},1136647,"（2012年真题）35kV 架空电力线路保护区范围是导线边缘向外侧延伸的距离为（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":26},"3m",{"key":24,"text":562,"correct":26},"5m",{"key":28,"text":564,"correct":22},"10m",{"key":31,"text":566,"correct":26},"15m",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1136648,"（2015年真题）按架空电力线路保护区内取土规定，220KV 杆塔周围禁止取土的范围是（ ）",[571,572,574,576],{"key":20,"text":562,"correct":22},{"key":24,"text":573,"correct":26},"6m",{"key":28,"text":575,"correct":26},"7m",{"key":31,"text":577,"correct":26},"8m",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":20,"analysis":33},1136649,"（2019年真题）临时用电组织设计的主要内容不包括（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"电费的计算方式",{"key":24,"text":585,"correct":26},"电源的接线位置",{"key":28,"text":587,"correct":26},"配电箱的安装位置",{"key":31,"text":589,"correct":26},"电路接线系统图",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},1136650,"（2013年真题）《电力法》中的电力设施保护区主要是指（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":26},"发电厂保护区",{"key":24,"text":597,"correct":22},"电力线路的保护区",{"key":28,"text":599,"correct":26},"变电站保护区",{"key":31,"text":601,"correct":26},"换流站保护区",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":31,"analysis":33},1136651,"（2017年真题）根据工程建设用电的规定，需要提交用电申请资料的是（ ）",[606,608,610,612],{"key":20,"text":607,"correct":26},"用电线路",{"key":24,"text":609,"correct":26},"用电档案",{"key":28,"text":611,"correct":26},"用电规划",{"key":31,"text":613,"correct":22},"用电变更",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]