[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,25,50,2021,[13,34,46,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,391,402,414,426,438,450,462,474,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1136549,1,"单选题","（2018年真题）自动喷水灭火系统的施工程序中，管道试压的紧后工序是（ ）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","喷洒头安装",false,{"key":24,"text":25,"correct":22},"B","管道冲洗",{"key":27,"text":28,"correct":22},"C","报警阀安装",{"key":30,"text":31,"correct":32},"D","减压装置安装",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1136550,"（2015年真题）关于自动喷水灭火系统喷头安装要求的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"应在系统试压前安装",{"key":24,"text":41,"correct":22},"安装时可对喷头进行拆装",{"key":27,"text":43,"correct":22},"可给喷头装饰性涂层",{"key":30,"text":45,"correct":32},"不得利用喷头的框架施拧",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1136551,"（2014年真题）在消火栓系统施工中，消火栓箱体安装固定的紧后工序是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"支管安装",{"key":24,"text":53,"correct":32},"附件安装",{"key":27,"text":55,"correct":22},"管道试压",{"key":30,"text":25,"correct":22},{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":20,"analysis":33},1136552,"（2016年真题）用于阻挡烟、火和冷却分割物，不具备直接灭火能力的是（ ）。",[61,63,65,67],{"key":20,"text":62,"correct":32},"水幕系统",{"key":24,"text":64,"correct":22},"预作用系统",{"key":27,"text":66,"correct":22},"干式系统",{"key":30,"text":68,"correct":22},"干湿式系统",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1136553,"（2012年真题）下列设备中，属于消防工程专用产品的是（ ）",[73,75,77,79],{"key":20,"text":74,"correct":22},"压力表",{"key":24,"text":76,"correct":32},"水泵接合器",{"key":27,"text":78,"correct":22},"减压阀",{"key":30,"text":80,"correct":22},"止回阀",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},1136554,"（2020年真题）消防灭火系统施工中，不需要管道冲洗的是()。",[85,87,89,91],{"key":20,"text":86,"correct":22},"消火栓灭火系统",{"key":24,"text":88,"correct":32},"泡沫灭火系统",{"key":27,"text":90,"correct":22},"水炮灭火系统",{"key":30,"text":92,"correct":22},"高压细水雾灭火系统",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":27,"analysis":33},1136555,"（2020年真题）工程设备验收时，核对验证内容不包括()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"核对设备型号规格",{"key":24,"text":100,"correct":22},"核对设备供货商",{"key":27,"text":102,"correct":32},"检查设备的完整性",{"key":30,"text":104,"correct":22},"复核关键原材料质量",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":30,"analysis":33},1136556,"（2017年真题）关于齿轮装配的说法，正确的是（ ）",[109,111,113,115],{"key":20,"text":110,"correct":22},"齿轮的端面与轴肩端面不应靠紧贴合",{"key":24,"text":112,"correct":22},"圆柱齿轮和蜗轮的接触斑点，应趋于齿侧面下部",{"key":27,"text":114,"correct":22},"用压铅法检查传动齿轮啮合的接触斑点",{"key":30,"text":116,"correct":32},"基准端面与轴线的垂直度应符合传动要求",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1136557,"（2018年真题）机械设备典型零部件装配的要求，正确的是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"齿轮装配时，圆柱齿轮和涡轮的接触斑点应趋于齿侧面顶部",{"key":24,"text":124,"correct":22},"联轴器装配时，应将两个半联轴器每转 180°测量一次",{"key":27,"text":126,"correct":32},"滑动轴承装配时，轴颈与轴瓦的侧间隙可用塞尺检查",{"key":30,"text":128,"correct":22},"采用温差法装配滚动轴承时，加热温度不应高于 150℃",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},1136558,"（2014年真题）设备安装精度控制中，采用修配法对补偿件进行补充加工的目的是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"解决设计存在的问题",{"key":24,"text":136,"correct":32},"抵消过大的安装积累误差",{"key":27,"text":138,"correct":22},"修补制造的加工缺陷",{"key":30,"text":140,"correct":22},"补偿零部件的装配偏差",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},1136559,"（2011年真题）影响机械设备安装精度的因素不包括（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"设备测量基准的选择",{"key":24,"text":148,"correct":22},"设备制造的质量",{"key":27,"text":150,"correct":32},"设备基础的硬度",{"key":30,"text":152,"correct":22},"设备安装环境",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},1136560,"（2015年真题）下列设备安装中，通常情况下采用桩基础的是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"水泵",{"key":24,"text":160,"correct":22},"变压器",{"key":27,"text":162,"correct":32},"汽轮机",{"key":30,"text":164,"correct":22},"空调机组",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},1136561,"（2011年真题）综合考虑各种因素，大型储罐选择（ ）基础较为妥当。",[169,171,173,175],{"key":20,"text":170,"correct":22},"混合",{"key":24,"text":172,"correct":32},"垫层",{"key":27,"text":174,"correct":22},"深井",{"key":30,"text":176,"correct":22},"框架式",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":30,"analysis":33},1136562,"（2013年真题）按埋置深度分类的机械设备基础是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"箱式基础",{"key":24,"text":184,"correct":22},"垫层基础",{"key":27,"text":186,"correct":22},"减振基础",{"key":30,"text":188,"correct":32},"联合基础",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1136563,"（2020年真题）发电机安装程序中，发电机穿转子的紧后工序是()。",[193,195,197,199],{"key":20,"text":194,"correct":22},"端盖及轴承调整安装",{"key":24,"text":196,"correct":32},"氢冷器安装",{"key":27,"text":198,"correct":22},"定子及转子水压试验",{"key":30,"text":200,"correct":22},"励磁机安装",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1136564,"（2013年真题）在雷电特别强烈地区采用双避雷线，少雷地区不设避雷线的防雷方式适合于（ ）的高压输电线路。",[205,207,209,211],{"key":20,"text":206,"correct":22},"500KV 及以上",{"key":24,"text":208,"correct":22},"220?330KV",{"key":27,"text":210,"correct":32},"110KV",{"key":30,"text":212,"correct":22},"35KV 及以下",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":30,"analysis":33},1136566,"（2018年真题）在配电装置的整定中，三相一次重合闸需整定的内容是（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"方向元件整定",{"key":24,"text":220,"correct":22},"过电压整定",{"key":27,"text":222,"correct":22},"保护时间整定",{"key":30,"text":224,"correct":32},"同期角整定",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1136567,"（2014年真题）下列措施中，能预防由雷击造成输电线路停电的措施是（ ）",[229,231,233,235],{"key":20,"text":230,"correct":22},"减少绝缘子串的片数",{"key":24,"text":232,"correct":22},"采用高阻抗接地",{"key":27,"text":234,"correct":22},"增加杆塔的接地电阻",{"key":30,"text":236,"correct":32},"装设自动重合闸装置",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":30,"analysis":33},1136568,"（2012年真题）下列说法中，符合成套配电装置柜体安装要求的是（ ）",[241,243,245,247],{"key":20,"text":242,"correct":22},"成列配电柜共用一根接地线与基础型钢连接",{"key":24,"text":244,"correct":22},"柜体安装垂直度允许偏差不应大于 1.5%",{"key":27,"text":246,"correct":22},"成列盘线偏差不应大于 3mm",{"key":30,"text":248,"correct":32},"成列配电柜相互间接缝不应大于 2mm",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1136569,"（2017年真题）管道系统压力试验前，应具备的条件是（ ）",[253,255,257,259],{"key":20,"text":254,"correct":32},"管道上的膨胀节己设置临时约束装置",{"key":24,"text":256,"correct":22},"管道焊缝己防腐绝热",{"key":27,"text":258,"correct":22},"试验压力表不少于 1 块",{"key":30,"text":260,"correct":22},"管道上的安全阀处于自然状态",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":27,"analysis":33},1136570,"（2017年真题）热力管道两个补偿器之间应设置（ ）",[265,267,269,271],{"key":20,"text":266,"correct":22},"活动支架",{"key":24,"text":268,"correct":22},"导向支架",{"key":27,"text":270,"correct":32},"固定支架",{"key":30,"text":272,"correct":22},"弹簧吊架",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1136571,"（2013年真题）下列工业管道安装工程一般施工程序中，正确的是（ ）",[277,279,281,283],{"key":20,"text":278,"correct":22},"管道与设备连接→仪表安装→调试与试运行",{"key":24,"text":280,"correct":32},"仪表安装→试压及清（吹）洗→防腐与保温",{"key":27,"text":282,"correct":22},"管道敷设→管道与设备连接→防腐与保温",{"key":30,"text":284,"correct":22},"管道与设备连接→试压及清（吹）洗→防腐与保温",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1136572,"（2018年真题）对管道元件的质量证明文件有异议时，下列做法正确的是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":32},"异议未解决前，不得使用",{"key":24,"text":292,"correct":22},"可以使用，但要做好标识并可追溯",{"key":27,"text":294,"correct":22},"管道元件压力试验合格后，可以使用",{"key":30,"text":296,"correct":22},"GC1 级管道可以使用，GC3 级管道不可以使用",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},1136573,"（2014年真题）关于大型金属储罐内挂脚手架正装法施工的要求，正确的是（ ）",[301,303,305,307],{"key":20,"text":302,"correct":32},"—台储罐施工宜用 2 至 3 层脚手架",{"key":24,"text":304,"correct":22},"在储罐壁板内侧挂设移动脚手架",{"key":27,"text":306,"correct":22},"脚手架随罐壁板升高逐层搭设",{"key":30,"text":308,"correct":22},"储罐的脚手架从上到下交替使用",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},1136574,"（2017年真题）连接钢结构的高强度螺栓安装前，高强度螺栓连接摩擦面应进行（ ）试验",[313,315,317,319],{"key":20,"text":314,"correct":22},"贴合系数",{"key":24,"text":316,"correct":22},"扭矩",{"key":27,"text":318,"correct":32},"抗滑移系数",{"key":30,"text":320,"correct":22},"抗剪切系数",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},1136575,"（2018年真题）立式圆筒形钢制储罐底板在不同阶段的施焊顺序，正确的是（ ）",[325,327,329,331],{"key":20,"text":326,"correct":32},"先壁板与边缘板角焊缝，再边缘板剩余对接焊缝",{"key":24,"text":328,"correct":22},"先中幅板间长焊缝，再中幅板间短焊缝",{"key":27,"text":330,"correct":22},"先中幅板与边缘板环焊缝，再中幅板间焊缝",{"key":30,"text":332,"correct":22},"先中幅板间焊缝，再边缘板对接焊缝",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1136576,"（2011年真题）金属储罐罐底的中幅板搭接接头焊接时，控制焊接变形的主要工艺措施之一是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"先焊长焊缝",{"key":24,"text":340,"correct":32},"初层焊道采用分段退焊或跳焊法",{"key":27,"text":342,"correct":22},"焊工均匀分布、对称施焊",{"key":30,"text":344,"correct":22},"沿同一方向进行分段焊接",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1136577,"（2012年真题）某台分馏塔共分为三段，采用由下至上逐段组对安装的方法，其第三段（上段）吊装、找正的紧前工序 是（ ）",[349,351,353,355],{"key":20,"text":350,"correct":32},"第一、二段段间环焊缝组对焊接",{"key":24,"text":352,"correct":22},"第二段找正",{"key":27,"text":354,"correct":22},"第二、三段段间环焊缝组对焊接",{"key":30,"text":356,"correct":22},"紧固地脚螺栓",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":30,"analysis":33},1136578,"（2015年真题）下列检测试验中，属于钢制压力容器产品焊接试板力学性能试验的是（ ）",[361,363,365,367],{"key":20,"text":362,"correct":22},"扭转试验",{"key":24,"text":364,"correct":22},"射线试验",{"key":27,"text":366,"correct":22},"耐压试验",{"key":30,"text":368,"correct":32},"弯曲试验",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},1136579,"（2014年真题）大型汽轮发电机组轴系对轮中心找正时，应以（ ）为基准。",[373,375,377,379],{"key":20,"text":374,"correct":32},"低压转子",{"key":24,"text":376,"correct":22},"中压转子",{"key":27,"text":378,"correct":22},"高压转子",{"key":30,"text":380,"correct":22},"电机转子",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1136580,"（2015年真题）发电机设备的安装程序中，发电机穿转子的紧前工序是（ ）",[385,387,388,389],{"key":20,"text":386,"correct":22},"定子就位",{"key":24,"text":198,"correct":32},{"key":27,"text":196,"correct":22},{"key":30,"text":390,"correct":22},"端盖、轴承、密封瓦调整安装",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1136581,"（2015年真题）光伏发电设备安装中，不使用的支架是（ ）。",[395,396,398,400],{"key":20,"text":270,"correct":22},{"key":24,"text":397,"correct":32},"滑动支架",{"key":27,"text":399,"correct":22},"跟踪支架",{"key":30,"text":401,"correct":22},"可调支架",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":30,"analysis":33},1136582,"（2019年真题）锅炉钢结构组件吊装时，与吊点选择无关的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"组件的结构强度和刚度",{"key":24,"text":409,"correct":22},"吊装机具的起升高度",{"key":27,"text":411,"correct":22},"起重机索具的安全要求",{"key":30,"text":413,"correct":32},"锅炉钢结构开口方式",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":30,"analysis":33},1136583,"（2015年真题）锅炉蒸汽管道的冲洗与吹洗范围，不包括（ ）",[418,420,422,424],{"key":20,"text":419,"correct":22},"减温水管系统",{"key":24,"text":421,"correct":22},"过热器",{"key":27,"text":423,"correct":22},"再热器",{"key":30,"text":425,"correct":32},"凝汽器",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":30,"analysis":33},1136584,"（2011年真题）单台仪表的校准点应在仪表全量程范围内均匀选取，一般不应少于（ ）点。",[430,432,434,436],{"key":20,"text":431,"correct":22},"2",{"key":24,"text":433,"correct":22},"3",{"key":27,"text":435,"correct":22},"4",{"key":30,"text":437,"correct":32},"5",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},1136585,"（2013年真题）下列不同材质的仪表管道，用管道外径的总数表示其最小允许弯曲半径，倍数从大到小依次为（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"高压钢管、紫钢管、塑料管",{"key":24,"text":445,"correct":32},"高压钢管、塑料管、紫铜管",{"key":27,"text":447,"correct":22},"塑料管、高压钢管、紫铜管",{"key":30,"text":449,"correct":22},"塑料管、紫铜管、高压钢管",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1136586,"（2019年真题）关于自动化仪表取源部件的安装要求，正确的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"合金钢管道上的开孔采用气割加工",{"key":24,"text":457,"correct":32},"取源部件安装后与管道同时进行压力试验",{"key":27,"text":459,"correct":22},"绝热管道上安装的取源部件不应露出绝热层",{"key":30,"text":461,"correct":22},"取源阀门与管道的连接采用卡套式接头",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":30,"analysis":33},1136587,"（2018年真题）关于回路试验规定的说法，正确的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"回路显示仪表的示值误差应超过回路内单台仪表的允许误差",{"key":24,"text":469,"correct":22},"温度检测回路不能在检测元件的输出端向回路输入模拟信号",{"key":27,"text":471,"correct":22},"现场不具备模拟信号的测量回路应在最末端输入信号",{"key":30,"text":473,"correct":32},"控制回路的执行器带有定位器时应同时进行试验",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},1136588,"（2012年真题）自动化仪表线路敷设完毕后，应测量电缆电线的（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":32},"绝缘电阻",{"key":24,"text":481,"correct":22},"额定电流",{"key":27,"text":483,"correct":22},"击穿电压",{"key":30,"text":485,"correct":22},"线路电阻",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":27,"analysis":33},1136589,"（2015年真题）关于仪表校准要求的说法，正确的是（ ）",[490,492,494,496],{"key":20,"text":491,"correct":22},"在仪表最大工作量值范围内均匀选取校准点",{"key":24,"text":493,"correct":22},"称重仪表在安装中逐渐加载标准重量进行校准",{"key":27,"text":495,"correct":32},"指示仪表在全标度范围内的示值误差和回程误差应符合仪表准确规定",{"key":30,"text":497,"correct":22},"施工现场不具备校准条件的仪表可用合格证明文件代替",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":30,"analysis":33},1136590,"（2014年真题）可燃气体检测器的安装位置应根据所测气体的（ ）确定。",[502,504,506,508],{"key":20,"text":503,"correct":22},"数量",{"key":24,"text":505,"correct":22},"流量",{"key":27,"text":507,"correct":22},"体积",{"key":30,"text":509,"correct":32},"密度",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":30,"analysis":33},1136591,"（2020年真题）下列自动化仪表工程的试验内容中，必须全数检验的是()。",[514,516,518,520],{"key":20,"text":515,"correct":22},"单台仪表校准和试验",{"key":24,"text":517,"correct":22},"仪表电源设备的试验",{"key":27,"text":519,"correct":22},"综合控制系统的试验",{"key":30,"text":521,"correct":32},"回路试验和系统试验",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":27,"analysis":33},1136592,"（2019年真题）用氯丁乳水泥砂浆衬里的防腐蚀方法属于（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"介质处理",{"key":24,"text":529,"correct":22},"缓蚀剂",{"key":27,"text":531,"correct":32},"覆盖层",{"key":30,"text":533,"correct":22},"电化学保护",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":30,"analysis":33},1136593,"（2018年真题）下列涂层施工方法中，最节省涂料且效率最高的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"刷涂法",{"key":24,"text":541,"correct":22},"滚涂法",{"key":27,"text":543,"correct":22},"空气喷涂法",{"key":30,"text":545,"correct":32},"高压无气喷涂法",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1136594,"（2016年真题）采用电化学保护方法进行防腐施工时，不属于阳极保护系统的是（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"参比电极",{"key":24,"text":553,"correct":32},"牺牲阳极",{"key":27,"text":555,"correct":22},"点状阴极",{"key":30,"text":557,"correct":22},"电线电缆",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":24,"analysis":33},1136595,"（2020年真题）在潮湿环境中，不锈钢接触碳素钢会产生()。",[562,564,566,568],{"key":20,"text":563,"correct":22},"化学腐蚀",{"key":24,"text":565,"correct":32},"电化学腐蚀",{"key":27,"text":567,"correct":22},"晶间腐蚀",{"key":30,"text":569,"correct":22},"铬离子污染",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":30,"analysis":33},1136596,"（2019年真题）关于保温结构的说法，正确的是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"保冷结构与保温结构相同",{"key":24,"text":577,"correct":22},"保温结构任何条件下都不需要防潮",{"key":27,"text":579,"correct":22},"保冷管道与保温管道各层的功能不同",{"key":30,"text":581,"correct":32},"保温结构与保冷结构的热量流动方向相反",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},1136597,"（2018年真题）下列绝热层采用捆扎的施工方法，正确的是（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"宜采用螺旋式缠绕捆扎",{"key":24,"text":589,"correct":22},"硬质绝热制品均不允许钻孔穿挂钩钉",{"key":27,"text":591,"correct":32},"多层绝热层的绝热制品，应逐层捆扎",{"key":30,"text":593,"correct":22},"每块绝热制品上的捆扎件不得少于三道",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":30,"analysis":33},1136598,"（2012年真题）将配置好的料液倒入异型管件外壁设置的模具内，其绝热施工方法是（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"充填法",{"key":24,"text":601,"correct":22},"喷涂法",{"key":27,"text":603,"correct":22},"拼砌法",{"key":30,"text":605,"correct":32},"浇注法",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":30,"analysis":33},1136599,"（2020年真题）关于管道防潮层采用玻璃纤维布复合胶泥涂抹施工的做法，正确的是()。",[610,612,614,616],{"key":20,"text":611,"correct":22},"环向和纵向缝应对接粘贴密实",{"key":24,"text":613,"correct":22},"玻璃纤维布不应用平铺法",{"key":27,"text":615,"correct":22},"第一层胶泥干燥后贴玻璃丝布",{"key":30,"text":617,"correct":32},"玻璃纤维布表面需涂胶泥",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]