[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,23,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1136446,1,"单选题","试运行的技术准备工作不包括（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","确认可以试运行的条件",false,{"key":24,"text":25,"correct":22},"B","编制试运行总体计划",{"key":27,"text":28,"correct":22},"C","确定试运行合格评价标准",{"key":30,"text":31,"correct":32},"D","在作业前进行技术交底和安全防范交底",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1136447,"下列可以采用邀请招标的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"不属于依法必须进行招标的项目",{"key":24,"text":41,"correct":22},"需要采用不可替代的专利或专有技术的项目",{"key":27,"text":43,"correct":22},"采购人依法能够自行建设的项目",{"key":30,"text":45,"correct":22},"需要向原中标人采购工程，否则将影响施工",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1136448,"下列投标文件属于废标的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"投标报价大写金额小于小写金额",{"key":24,"text":53,"correct":22},"投标文件中某分项工程的报价有个别漏项",{"key":27,"text":55,"correct":32},"投标文件提供的检验标准不符合招标文件的要求",{"key":30,"text":57,"correct":22},"开标前5min，补充修改投标文件",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1136449,"合同实施偏差分析不包括（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"产生偏差的原因分析",{"key":24,"text":65,"correct":22},"合同实施偏差的责任分析",{"key":27,"text":67,"correct":22},"合同实施趋势分析",{"key":30,"text":69,"correct":32},"合同实施措施分析",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},1136450,"关于工程分包人的责任和义务的说法，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"分包人须服从发包人直接下达的与分包工程有关的指令",{"key":24,"text":77,"correct":22},"分包人应履行并承担总包合同中承包人的所有义务和责任",{"key":27,"text":79,"correct":22},"特殊情况下，分包人可不经承包人允许，直接与监理工程师发生工作联系",{"key":30,"text":81,"correct":32},"分包人须服从承包人转发的监理工程师与分包工程有关的指令",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1136451,"下列情况中，可向建设单位提出费用索赔的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"监理单位责令剥离检查未报检的隐蔽工程而产生的费用",{"key":24,"text":89,"correct":22},"施工单位的设备被暴雨淋湿而产生的费用",{"key":27,"text":91,"correct":32},"建设单位增加工作量造成的费用增加",{"key":30,"text":93,"correct":22},"施工单位施工人员高处坠落受伤产生的费用",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1136452,"下列设备监造大纲内容不包括的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":32},"签订设备采购合同",{"key":24,"text":101,"correct":22},"制订计划及控制措施",{"key":27,"text":103,"correct":22},"明确技术和验收要求",{"key":30,"text":105,"correct":22},"明确相应技术人员",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1136453,"设备采购文件的编制依据中不包括（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目合同",{"key":24,"text":113,"correct":22},"采购计划",{"key":27,"text":115,"correct":32},"设计说明",{"key":30,"text":117,"correct":22},"业主要求",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},1136454,"不需要专家论证的安全专项施工方案，应由（ ）审核签字盖章后实施。",[122,124,126,128],{"key":20,"text":123,"correct":22},"建设单位项目负责人",{"key":24,"text":125,"correct":22},"总承包单位技术负责人",{"key":27,"text":127,"correct":22},"施工单位技术负责人",{"key":30,"text":129,"correct":32},"总监理工程师",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},1136455,"不属于施工组织设计编制的先进性原则的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"采取先进技术措施",{"key":24,"text":137,"correct":22},"推广建筑十项新技术",{"key":27,"text":139,"correct":22},"推广节能环保和绿色技术",{"key":30,"text":141,"correct":32},"采取科学的管理措施和方法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1136456,"施工方案交底的内容不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":32},"工程特点、难点",{"key":24,"text":149,"correct":22},"施工工艺",{"key":27,"text":151,"correct":22},"施工程序",{"key":30,"text":153,"correct":22},"操作方法",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1136457,"材料管理ABC分类法的内容不包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"计算项目各种材料所占用的资金总量",{"key":24,"text":161,"correct":22},"根据各种材料占用资金的多少，从大到小顺序排列",{"key":27,"text":163,"correct":32},"确定材料的经济和安全储量",{"key":30,"text":165,"correct":22},"计算各种材料的累计数及累计百分比",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1136458,"金属圆形螺旋风管制安技术不宜用于（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"送风管道",{"key":24,"text":173,"correct":32},"压缩空气管道",{"key":27,"text":175,"correct":22},"进风管道",{"key":30,"text":177,"correct":22},"防排烟系统",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1136459,"不属于机电工程项目内部协调管理的措施的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"制度措施",{"key":24,"text":185,"correct":22},"教育措施",{"key":27,"text":187,"correct":22},"经济措施",{"key":30,"text":189,"correct":32},"技术措施",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1136460,"属于与施工单位项目部有合同契约关系的单位是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"设计单位",{"key":24,"text":197,"correct":22},"供水供电单位",{"key":27,"text":199,"correct":32},"材料供应单位",{"key":30,"text":201,"correct":22},"消防安全监督机构",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":30,"analysis":33},1136461,"不属于施工进度偏差产生的主要原因是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"供应商违约",{"key":24,"text":209,"correct":22},"施工图纸修改",{"key":27,"text":211,"correct":22},"施工方法错误",{"key":30,"text":213,"correct":32},"施工质量检验",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1136462,"下列关于施工进度偏差分析，说法错误的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"若出现偏差的工作为关键工作，则无论偏差大小，都对后续工作及总工期产生影响",{"key":24,"text":221,"correct":32},"若出现偏差的工作不是关键工作，对后续工期无影响",{"key":27,"text":223,"correct":22},"若出现偏差的工作不是关键工作，对后续工期可能有影响",{"key":30,"text":225,"correct":22},"若出现偏差的工作不是关键工作，需要根据偏差值与总时差大小关系，确定对总工期的影响程度",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":30,"analysis":33},1136463,"属于施工机械成本控制措施的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"加强技术培训",{"key":24,"text":233,"correct":22},"控制采购成本",{"key":27,"text":235,"correct":22},"采用限额领料",{"key":30,"text":237,"correct":32},"优化施工方案",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":30,"analysis":33},1136464,"成本分析的比较法，下列说法不正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"将本期实际指标与目标指标对比",{"key":24,"text":245,"correct":22},"将本期实际指标与上期实际指标对比",{"key":27,"text":247,"correct":22},"本期实际指标与本行业平均水平、先进水平对比",{"key":30,"text":249,"correct":32},"本期实际指标与类似工程指标对比",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},1136465,"竣工结算实施过程中,错误的说法是()。",[254,256,258,260],{"key":20,"text":255,"correct":22},"发包人应在收到承包人提交的竣工结算文件后规定期限内核对",{"key":24,"text":257,"correct":22},"发包人可以向承包人提出核实意见,并要求提供竣工结算补充资料",{"key":27,"text":259,"correct":32},"合同工程竣工结算核对已完成并确认后,发包人可要求承包人与造价咨询人进行第三方核对",{"key":30,"text":261,"correct":22},"有争议的部分,按合同规定执行,无争议的部分,应按合同办理竣工结算",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},1136466,"下列不属于项目经理的安全生产职责的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"全面负责项目的安全生产工作",{"key":24,"text":269,"correct":22},"负责建立项目安全生产管理机构并配备安全管理人员",{"key":27,"text":271,"correct":32},"负责施工现场安全生产巡视督查",{"key":30,"text":273,"correct":22},"组织并参加项目定期的安全生产检查",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1136467,"总承包合同价款15200万元，则专职安全管理人员的配备数量至少为（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"1人",{"key":24,"text":281,"correct":22},"2人",{"key":27,"text":283,"correct":32},"3人",{"key":30,"text":285,"correct":22},"按总人数的5‰配备",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1136468,"受限空间内涂装作业应符合的要求中错误的是()",[290,292,294,296],{"key":20,"text":291,"correct":22},"受限空间不得作为外来制件的涂漆作业场所",{"key":24,"text":293,"correct":22},"进入受限空间前，办理作业票",{"key":27,"text":295,"correct":32},"作业人员进入深度超过1.5m的受限空间作业时，应在腰部系上保险绳",{"key":30,"text":297,"correct":22},"严禁向密闭空间内通氧气和采用明火照明",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1136469,"新装升降机，投入使用前应进行（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"载重试验",{"key":24,"text":305,"correct":22},"升降试验",{"key":27,"text":307,"correct":32},"坠落试验",{"key":30,"text":309,"correct":22},"牵引试验",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1136470,"工程质量不符合规定要求，但经相关单位认可对安全影响不大，可（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"返修处理",{"key":24,"text":317,"correct":32},"不作处理",{"key":27,"text":319,"correct":22},"降级使用",{"key":30,"text":321,"correct":22},"报废处理",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},1136471,"施工质量问题调查处理程序中，制定纠正措施的紧前工作是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"质量问题调查",{"key":24,"text":329,"correct":22},"原因分析",{"key":27,"text":331,"correct":32},"质量问题评审处置",{"key":30,"text":333,"correct":22},"组织实施",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},1136472,"压缩机在空气负荷试验时，当无规定时，在排气压力达到额定压力的3\u002F4时，应连续运行（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"0.5h",{"key":24,"text":341,"correct":22},"1h",{"key":27,"text":343,"correct":32},"2h",{"key":30,"text":345,"correct":22},"3h",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1136474,"竣工验收管理行为的依据是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":32},"质量验收评定标准",{"key":24,"text":353,"correct":22},"初步设计",{"key":27,"text":355,"correct":22},"可行性研究报告",{"key":30,"text":357,"correct":22},"施工图纸",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":27,"analysis":33},1136475,"下列属于按达到竣工验收条件的验收方式分类的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"施工项目竣工验收",{"key":24,"text":365,"correct":22},"消防工程验收",{"key":27,"text":367,"correct":32},"项目中间验收",{"key":30,"text":369,"correct":22},"防雷工程验收",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1136476,"根据《建设工程质量管理条例》,建设工程在正常使用条件下,最低保修期限要求的说法，错误的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"设备安装工程保修期为2年",{"key":24,"text":377,"correct":32},"电气管线安装工程保修期为3年",{"key":27,"text":379,"correct":22},"供热系统保修期为2个供暖期",{"key":30,"text":381,"correct":22},"供冷系统保修期为2个供冷期",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":30,"analysis":33},1136477,"主要了解在工程施工过程中所采用的新材料、新技术、新工艺、新设备等的技术性能和使用后的效果，发现问题及时加以补救和解决，属于（ ）回访。",[386,388,390,392],{"key":20,"text":387,"correct":22},"周期性回访",{"key":24,"text":389,"correct":22},"季节性回访",{"key":27,"text":391,"correct":22},"经常性回访",{"key":30,"text":393,"correct":32},"技术性回访",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":30,"analysis":33},1136478,"在保修期内，建设工程质量是由建设单位提供的设备、材料等质量不良造成的，应由（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"施工单位承担修理费用和负责修理",{"key":24,"text":401,"correct":22},"双方商定各自经济责任，施工单位负责修理",{"key":27,"text":403,"correct":22},"设计单位承担修理费用，施工单位协助修理",{"key":30,"text":405,"correct":32},"建设单位承担修理费用，施工单位协助修理",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},1136479,"衡量计量器具质量的主要指标是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":32},"灵敏度、分辨率、动态特性",{"key":24,"text":413,"correct":22},"稳定度、准确性、动态特性",{"key":27,"text":415,"correct":22},"动态特性、分辨率、统一性",{"key":30,"text":417,"correct":22},"精密度、溯源性、准确度",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":30,"analysis":33},1136480,"下列计量器具中，属于B类计量器具的是（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"木尺",{"key":24,"text":425,"correct":22},"兆欧表",{"key":27,"text":427,"correct":22},"一级平晶",{"key":30,"text":429,"correct":32},"百分表",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1136481,"计量检定工作，计量器具可送交的计量检定机构是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"公司所在地具有相应资质",{"key":24,"text":437,"correct":32},"工程所在地具有相应资质",{"key":27,"text":439,"correct":22},"计量器具制造单位",{"key":30,"text":441,"correct":22},"计量器具销售单位",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},1136483,"根据工程建设用电的规定,需要提交用电申请资料的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"用电线路",{"key":24,"text":449,"correct":22},"用电档案",{"key":27,"text":451,"correct":22},"用电规划",{"key":30,"text":453,"correct":32},"用电变更",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},1136484,"临时用电是编制临时用电施工组织设计，还是编制安全用电技术措施和电气防火措施的依据是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"用电设备最大容量",{"key":24,"text":461,"correct":22},"用电设备过载容量",{"key":27,"text":463,"correct":22},"用电设备计算容量",{"key":30,"text":465,"correct":32},"用电设备总容量",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1136485,"220kV电压等级的杆塔周围禁止取土的范围是（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"3m",{"key":24,"text":473,"correct":32},"5m",{"key":27,"text":475,"correct":22},"10m",{"key":30,"text":477,"correct":22},"15m",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},1136486,"下列管道中，属于压力管道中公用管道的是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":32},"热力管道",{"key":24,"text":485,"correct":22},"动力管道",{"key":27,"text":487,"correct":22},"污水管道",{"key":30,"text":489,"correct":22},"城市供水管道",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1136487,"下列不属于压力容器安全附件及仪表的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":32},"膨胀节",{"key":24,"text":497,"correct":22},"爆破片",{"key":27,"text":499,"correct":22},"压力表",{"key":30,"text":501,"correct":22},"紧急切断装置",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},1136488,"下列关于塔器产品焊接试板要求说法错误的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":22},"焊接试板采用与施焊压力容器相同的条件和焊接工艺焊接",{"key":24,"text":509,"correct":22},"焊接试板应同炉、同工艺随塔器进行热处理",{"key":27,"text":511,"correct":32},"焊接试板应由产品的焊工和另外一名塔器安装单位有焊接资格证的焊工同时进行",{"key":30,"text":513,"correct":22},"试板焊接后打上焊工代号钢印，经检验员外观检査合格后，打上检验员钢印号",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":30,"analysis":33},1136489,"下列检测试验中，属于塔器产品焊接试板力学性能试验的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"扭转试验",{"key":24,"text":521,"correct":22},"射线检测",{"key":27,"text":523,"correct":22},"耐压试验",{"key":30,"text":525,"correct":32},"弯曲试验",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},1136490,"下列关于锅炉安装改造许可范围说法不正确的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"1级许可安装改造锅炉的范围不限",{"key":24,"text":533,"correct":22},"2级许可可安装额定出口压力为2.0MPa的锅炉",{"key":27,"text":535,"correct":22},"3级许可可安装铸铁锅炉",{"key":30,"text":537,"correct":32},"锅炉制造单位可安装本单位制造的整装锅炉，但不能对其改造",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":27,"analysis":33},1136491,"需要在现场分片组焊的压力容器，施工单位应当具备（ ）压力容器制造许可证。",[542,544,546,548],{"key":20,"text":543,"correct":22},"A1级",{"key":24,"text":545,"correct":22},"A2级",{"key":27,"text":547,"correct":32},"A3级",{"key":30,"text":549,"correct":22},"A4级",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1136492,"下列特种设备的生产单位应当具备与生产相适应的条件中，不包括（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"质量保证、安全管理和岗位责任制度",{"key":24,"text":557,"correct":32},"资金和业绩",{"key":27,"text":559,"correct":22},"专业技术人员",{"key":30,"text":561,"correct":22},"设备、设施和工作场所",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},1136493,"建筑安装分部工程施工完成后，由（ ）组织内部验评。",[566,568,570,572],{"key":20,"text":567,"correct":22},"专业质检员",{"key":24,"text":569,"correct":22},"专业技术负责人",{"key":27,"text":571,"correct":32},"项目技术负责人",{"key":30,"text":573,"correct":22},"项目部副经理",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":30,"analysis":33},1136494,"检验批质量验收合格的规定中不包括（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":22},"主控项目质量经抽样检验合格",{"key":24,"text":581,"correct":22},"施工操作依据和质量验收记录完整",{"key":27,"text":583,"correct":22},"一般项目质量经抽样检验合格",{"key":30,"text":585,"correct":32},"观感质量应符合要求",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":30,"analysis":33},1136495,"建筑安装单位工程验收记录表签字人不包括（ ）。",[590,591,592,594],{"key":20,"text":123,"correct":22},{"key":24,"text":129,"correct":22},{"key":27,"text":593,"correct":22},"施工单位项目负责人",{"key":30,"text":595,"correct":32},"设计单位项目技术负责人",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":27,"analysis":33},1136496,"工业安装中，对于分项工程划分的说法，不正确的是（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"设备安装的分项工程可按工序划分",{"key":24,"text":603,"correct":22},"管道分项工程可按类别和工作介质划分",{"key":27,"text":605,"correct":32},"防腐分项工程可按施工内容划分",{"key":30,"text":607,"correct":22},"自动化仪表按仪表类别和安装试验工序进行划分",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":24,"analysis":33},1136497,"工业安装分项工程质量验收时，验收成员不包括（ ）。",[612,614,616,618],{"key":20,"text":613,"correct":22},"建设单位专业技术负责人",{"key":24,"text":615,"correct":32},"设计单位驻现场代表",{"key":27,"text":617,"correct":22},"施工单位专业技术质量负责人",{"key":30,"text":619,"correct":22},"监理工程师",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]