[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,21,50,2021,[13,34,46,58,70,82,94,106,118,130,139,151,163,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,377,389,397,409,421,433,445,457,469,481,493,505,517,529,541,553,565,577,589,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1136339,1,"单选题","机械设备安装时，设备固定与灌浆的紧前工作是（ ）",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","垫铁设置",false,{"key":24,"text":25,"correct":22},"B","设备装配",{"key":27,"text":28,"correct":29},"C","安装精度调整与检测",true,{"key":31,"text":32,"correct":22},"D","吊装就位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1136340,"解体的大型减速机安装时一次灌浆应在（ ）进行。",[38,40,42,44],{"key":20,"text":39,"correct":22},"底座就位后",{"key":24,"text":41,"correct":29},"底座粗找正后",{"key":27,"text":43,"correct":22},"整体精找正后",{"key":31,"text":45,"correct":22},"底座精找正后",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1136341,"下列关于机械设备安装工作说法错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"可以通过调整垫铁的厚度，使设备安装达到设计或规范要求的标高和水平度",{"key":24,"text":53,"correct":29},"设备二次灌浆是在设备精找正后，对地脚螺栓孔进行的灌浆",{"key":27,"text":55,"correct":22},"一般解体设备装配顺序为：组合件装配→部件装配→总装配",{"key":31,"text":57,"correct":22},"可以通过润滑剂减少摩擦副的摩擦、表面破坏和降低温度，使设备具有良好工作性能，延长使用寿命",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1136342,"关于滑动轴承装配的要求，下列说法正确的是（ ）",[62,64,66,68],{"key":20,"text":63,"correct":29},"轴颈与轴瓦的单侧间隙为顶间隙的1\u002F2～1\u002F3",{"key":24,"text":65,"correct":22},"轴颈与轴瓦的顶间隙可用直径大于顶间隙3倍的铅丝检查",{"key":27,"text":67,"correct":22},"检查上下轴瓦接合面，任何部位塞入深度应不大于接合面宽度的1\u002F2",{"key":31,"text":69,"correct":22},"薄壁轴瓦的接触面亦必须研刮",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1136343,"基础裂纹处不宜采用（ ）地脚螺栓。",[74,76,78,80],{"key":20,"text":75,"correct":22},"固定式地脚螺栓",{"key":24,"text":77,"correct":22},"活动式地脚螺栓",{"key":27,"text":79,"correct":29},"胀锚地脚螺栓",{"key":31,"text":81,"correct":22},"粘接地脚螺栓",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1136344,"现场组装大型设备各运动部件之间的相对运动精度不包括（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"圆周运动精度",{"key":24,"text":89,"correct":29},"配合精度",{"key":27,"text":91,"correct":22},"直线运动精度",{"key":31,"text":93,"correct":22},"传动精度",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1136345,"下列不属于解体设备装配精度的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"各运动部件之间的相对运动精度",{"key":24,"text":101,"correct":29},"各运动部件之间的水平精度",{"key":27,"text":103,"correct":22},"配合面之间的配合精度",{"key":31,"text":105,"correct":22},"配合面之间的接触质量",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1136346,"下列关于机械设备安装精度控制做法错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"控制悬臂轴水平度的偏差方向使其能补偿受力引起的偏差变化",{"key":24,"text":113,"correct":22},"控制相邻辊道轴线与机组中心线垂直度偏差的方向相反可以减少产品在机组运行中的跑偏",{"key":27,"text":115,"correct":22},"控制相邻设备水平度偏差的方向相反使其实现安装精度偏差的相互补偿",{"key":31,"text":117,"correct":29},"控制悬臂轴轴线与机组中心线垂直度的方向使其实现安装精度偏差的相互补偿",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1136349,"下列整定内容中属于成套配电装置过电流整定的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"电压元件整定",{"key":24,"text":125,"correct":22},"温度元件整定",{"key":27,"text":127,"correct":22},"方向元件整定",{"key":31,"text":129,"correct":29},"时间元件整定",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1136352,"机械设备安装程序中，安装精度调整与检测的紧前工作是（ ）。",[134,136,137,138],{"key":20,"text":135,"correct":22},"设备固定与灌浆",{"key":24,"text":21,"correct":22},{"key":27,"text":32,"correct":29},{"key":31,"text":25,"correct":22},{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":31,"analysis":33},1136353,"大型设备的解体安装要保证的精度不包括（ ）。",[143,145,147,149],{"key":20,"text":144,"correct":22},"设备的定位位置精度",{"key":24,"text":146,"correct":22},"各设备间相互位置精度",{"key":27,"text":148,"correct":22},"再现设备制造精度",{"key":31,"text":150,"correct":29},"各设备间相对运动精度",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},1136354,"设备安装精度控制中，采用修配法对补偿件进行补充加工的目的是（ ）。",[155,157,159,161],{"key":20,"text":156,"correct":22},"解决设计存在的问题",{"key":24,"text":158,"correct":29},"抵消过大的安装积累误差",{"key":27,"text":160,"correct":22},"修补制造的加工缺陷",{"key":31,"text":162,"correct":22},"补充零部件的装配偏差",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":27,"analysis":33},1136355,"设备基础验收内容不包括（ ）。",[167,169,171,172],{"key":20,"text":168,"correct":22},"混凝土强度",{"key":24,"text":170,"correct":22},"位置和尺寸",{"key":27,"text":21,"correct":29},{"key":31,"text":173,"correct":22},"预埋地脚螺栓",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},1136356,"关于电动机的干燥说法，错误的是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"电动机的干燥可采用外部加热干燥法和电流加热干燥法",{"key":24,"text":181,"correct":29},"电动机干燥可以用水银温度计测量温度",{"key":27,"text":183,"correct":22},"干燥时应定时测定记录绕组的绝缘电阻、绕组温度等参数",{"key":31,"text":185,"correct":22},"绝缘电阻达到要求，在同一温度下经5h稳定不变，才认为干燥完毕",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":27,"analysis":33},1136357,"下列配电装置安装的说法错误的是（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"基础型钢的接地应不少于两处",{"key":24,"text":193,"correct":22},"柜体按编号顺序分别安装在基础型钢上",{"key":27,"text":195,"correct":29},"每台柜体串联后与基础型钢做接地保护连接",{"key":31,"text":197,"correct":22},"柜门应以裸铜软线与金属柜体可靠连接",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},1136358,"电缆封端要严密，1kV以下的电缆应做（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":22},"交流耐压试验",{"key":24,"text":205,"correct":29},"绝缘电阻测试",{"key":27,"text":207,"correct":22},"直流泄漏试验",{"key":31,"text":209,"correct":22},"直流耐压试验",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":24,"analysis":33},1136359,"不需要进行电动机抽芯检查的是（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"电动机出厂期限超过制造厂保证期限",{"key":24,"text":217,"correct":29},"没有出厂合格证",{"key":27,"text":219,"correct":22},"若制造厂无保证期限，出厂日期已超过1年",{"key":31,"text":221,"correct":22},"经外观检查质量可疑",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},1136360,"电缆线路在进行直流耐压试验的同时，在高压侧测量（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"短路电流",{"key":24,"text":229,"correct":22},"空载电流",{"key":27,"text":231,"correct":29},"泄漏电流",{"key":31,"text":233,"correct":22},"试验电流",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1136361,"下列关于变压器就位说法错误的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"应注意其方位和距墙尺寸应与设计要求相符",{"key":24,"text":241,"correct":29},"装有气体继电器的变压器顶盖，沿气体继电器的气流方向有1.0%~1.5%的下降坡度",{"key":27,"text":243,"correct":22},"变压器与封闭母线连接时，其套管中心线应与封闭母线中心线相符",{"key":31,"text":245,"correct":22},"装有滚轮的变压器，滚轮应转动灵活，在变压器就位后，应将滚轮用能拆卸的制动装置加以固定",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},1136362,"电机干燥时要定时测定并记录的内容不包括（ ）",[250,252,254,256],{"key":20,"text":251,"correct":22},"绕组的绝缘电阻",{"key":24,"text":253,"correct":22},"绕组的温度",{"key":27,"text":255,"correct":22},"环境的温度",{"key":31,"text":257,"correct":29},"环境的湿度",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},1136363,"电动机试运行中的检查项目不包括（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"换向器",{"key":24,"text":265,"correct":22},"振动",{"key":27,"text":267,"correct":22},"温升",{"key":31,"text":269,"correct":29},"接地电阻",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":24,"analysis":33},1136364,"下列关于电力电缆直埋敷设要求说法错误的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"直埋电缆应使用铠装电缆",{"key":24,"text":277,"correct":29},"电缆相互交叉、与非热力管交叉和电缆平行敷设于管道上方或下方时，都要穿在保护管中",{"key":27,"text":279,"correct":22},"中间接头盒外面要有铸铁或混凝土保护盒",{"key":31,"text":281,"correct":22},"电缆敷设后，上面要铺100mm厚的软土或细沙",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},1136365,"下列电缆施放要求中做法错误的是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"人工施放时必须每隔1.5~2m放置滑轮一个",{"key":24,"text":289,"correct":22},"用机械敷设充油电缆时，总拉力达到20kN",{"key":27,"text":291,"correct":29},"把电缆放在地上拖拉时不得损坏保护层",{"key":31,"text":293,"correct":22},"穿入管中的电缆应符合设计要求，交流单芯电缆不得单独穿入钢管内",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},1136366,"下列措施中，能预防由雷击造成输电线路停电的措施是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"减少绝缘子串的片数",{"key":24,"text":301,"correct":22},"采用高阻抗接地",{"key":27,"text":303,"correct":22},"增加杆塔的接地电阻",{"key":31,"text":305,"correct":29},"装设自动重合闸装置",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},1136367,"在雷电特别强烈地区采用双避雷线，少雷地区不设避雷方式适合用于（ ）的高压输电线路。",[310,312,314,316],{"key":20,"text":311,"correct":22},"500kV及以上",{"key":24,"text":313,"correct":22},"220~330kV",{"key":27,"text":315,"correct":29},"110kV",{"key":31,"text":317,"correct":22},"35kV",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":27,"analysis":33},1136368,"下列关于发电厂和变电站防雷措施说法错误的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"采用接闪线预防直击雷",{"key":24,"text":325,"correct":22},"利用阀型接闪器来限制入侵雷电波的过电压幅值",{"key":27,"text":327,"correct":29},"变电站通常采用金属氧化物接闪器",{"key":31,"text":329,"correct":22},"在靠近变电站的一段进线必须架设接闪线，此为进线保护，一般有1?2km",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},1136369,"发电厂的发电机所采用的接闪器应做的试验内容不包括（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"测量接闪器的直流参考电压",{"key":24,"text":337,"correct":22},"测量接闪器的绝缘电阻",{"key":27,"text":339,"correct":29},"测量接闪器的工频放电电压",{"key":31,"text":341,"correct":22},"测量接闪器的泄漏电流",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},1136370,"下列不属于金属接地极的是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"镀锌角钢",{"key":24,"text":349,"correct":29},"镀锌扁钢",{"key":27,"text":351,"correct":22},"镀锌钢管",{"key":31,"text":353,"correct":22},"铜棒",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},1136371,"某80m3金属储罐防静电的接地要求错误的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":29},"防静电的接地装置应与防感应雷和电气设备的接地装置单独设置",{"key":24,"text":361,"correct":22},"防静电接地线应单独与接地干线相连",{"key":27,"text":363,"correct":22},"防静电接地线的连接螺栓不应小于M10",{"key":31,"text":365,"correct":22},"接地点不应少于两处，且接地点的间距不应大于30m",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":24,"analysis":33},1136372,"下列关于配电装置柜体的安装要求说法错误的是（ ）。",[370,371,373,375],{"key":20,"text":191,"correct":22},{"key":24,"text":372,"correct":29},"柜体安装完毕后，每台柜体应串联整体与基础型钢做接地保护连接，以保证柜体的接地牢固良好",{"key":27,"text":374,"correct":22},"装有电器的可开启的柜门应以裸铜软线与金属柜体可靠连接",{"key":31,"text":376,"correct":22},"柜体安装垂直度允许偏差不应大于 1.5‰，相互间接缝不应大于 2mm",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},1136373,"下列高压开关设备的试验内容中不属于高压真空开关试验的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"关断能力试验",{"key":24,"text":384,"correct":22},"短时耐受电流试验",{"key":27,"text":386,"correct":22},"开关绝缘试验",{"key":31,"text":388,"correct":29},"漏气率及含水率试验",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1136374,"下列整定内容中属于成套配电装置过电流保护整定的是（ ）。",[393,394,395,396],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":22},{"key":27,"text":127,"correct":22},{"key":31,"text":129,"correct":29},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},1136375,"配电装置送电运行验收时合低压柜进线开关之前应该（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"合控制柜的开关",{"key":24,"text":404,"correct":22},"合高压进线开关",{"key":27,"text":406,"correct":29},"合变压器柜开关",{"key":31,"text":408,"correct":22},"合总配电柜开关",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},1136376,"工业管道安装工程一般施工程序中，试压清洗紧前工序是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"防腐保温",{"key":24,"text":416,"correct":29},"仪表安装",{"key":27,"text":418,"correct":22},"管道预制安装",{"key":31,"text":420,"correct":22},"调试及试运行",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1136377,"大型储罐的管道与泵或其他有独立基础的设备连接，应注意基础（ ）的影响。",[425,427,429,431],{"key":20,"text":426,"correct":29},"沉降",{"key":24,"text":428,"correct":22},"位移",{"key":27,"text":430,"correct":22},"强度",{"key":31,"text":432,"correct":22},"刚度",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},1136378,"有热位移的管道，吊点应设在位移的（ ）安装。",[437,439,441,443],{"key":20,"text":438,"correct":22},"相同方向，按位移值的1\u002F2偏位安装",{"key":24,"text":440,"correct":22},"相同方向，按位移值的1\u002F4偏位安装",{"key":27,"text":442,"correct":29},"相反方向，按位移值的1\u002F2偏位安装",{"key":31,"text":444,"correct":22},"相反方向，按位移值的1\u002F4偏位安装",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},1136379,"蒸汽管道每段管道的最低点要设置（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"补偿装置",{"key":24,"text":452,"correct":22},"防振装置",{"key":27,"text":454,"correct":29},"排水装置",{"key":31,"text":456,"correct":22},"放气装置",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":27,"analysis":33},1136380,"热力管道两个补偿器中间应设置（ ）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"活动支架",{"key":24,"text":464,"correct":22},"导向支架",{"key":27,"text":466,"correct":29},"固定支架",{"key":31,"text":468,"correct":22},"弹簧吊架",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},1136381,"下列不属于管道工厂化预制场地中应完成工作的是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"破口加工",{"key":24,"text":476,"correct":22},"热处理",{"key":27,"text":478,"correct":22},"检验、标记",{"key":31,"text":480,"correct":29},"包装、运输",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":24,"analysis":33},1136382,"下列关于管道压力试验说法错误的是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"压力试验完毕后不得在管道上进行修补否则需重新进行压力试验",{"key":24,"text":488,"correct":29},"脆性材料若使用气体进行试验需经过设计和建设单位同意认可",{"key":27,"text":490,"correct":22},"环向、纵向对接焊缝在经过设计和建设单位同意认可后可使用100%射线检测和100%超声检测替代压力试验",{"key":31,"text":492,"correct":22},"管道支承件与管道组成件连接的焊缝在经过设计和建设单位同意认可后可使用100%渗透检测或100%磁粉检测 替代压力试验",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":27,"analysis":33},1136383,"下列不属于工业管道泄露性试验巡回检查密封点的是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"阀门填料函",{"key":24,"text":500,"correct":22},"法兰连接处",{"key":27,"text":502,"correct":29},"焊缝连接处",{"key":31,"text":504,"correct":22},"螺纹连接处",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},1136384,"下列关于管道吹洗说法错误的是（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"不锈钢管油系统管道，宜采用蒸汽吹净后进行油清洗",{"key":24,"text":512,"correct":22},"水冲洗以排出口的水色和透明度与入口水目测一致为合格",{"key":27,"text":514,"correct":22},"蒸汽吹扫应按加热→冷却→再加热的顺序循环进行",{"key":31,"text":516,"correct":29},"管道酸洗钝化应按水洗、酸洗、钝化、脱脂去油、水洗、无油压缩空气吹干的顺序进行",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":31,"analysis":33},1136385,"大管道闭式循环冲洗工艺确定时，第一步是确定（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":22},"冲洗速度",{"key":24,"text":524,"correct":22},"除污管段位置",{"key":27,"text":526,"correct":22},"计算能量损失",{"key":31,"text":528,"correct":29},"最大冲洗长度",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},1136386,"大管道闭式循环冲洗管网原则错误的是（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":29},"先冲干管，再冲支管",{"key":24,"text":536,"correct":22},"将供水管道、回水管道的最终端连通，并安装连通阀门",{"key":27,"text":538,"correct":22},"先冲远处，后冲近处",{"key":31,"text":540,"correct":22},"先脏水循环冲洗，再换清水循环冲洗，最后换净水循环冲洗",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":24,"analysis":33},1136387,"材质为不锈钢的管道元件和材料，在运输及储存期间不得与（ ）接触。",[545,547,549,551],{"key":20,"text":546,"correct":22},"聚丙烯",{"key":24,"text":548,"correct":29},"低合金钢",{"key":27,"text":550,"correct":22},"有色金属",{"key":31,"text":552,"correct":22},"有机硅",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},1136388,"工业管道现场条件不允许进行压力试验时，经设计和建设单位同意，可同时采取相应方法代替压力试验，其中不包括（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"所有对接焊缝和螺旋焊缝进行100%射线检测",{"key":24,"text":560,"correct":29},"除对接焊缝和螺旋焊缝外的所有焊缝进行100%超声波检测",{"key":27,"text":562,"correct":22},"进行管道系统的柔性分析",{"key":31,"text":564,"correct":22},"管道系统进行泄漏性试验",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},1136389,"埋地钢管的设计压力为0.1MPa，设计未规定的情况下，管道液压试验的压力为（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"0.1MPa",{"key":24,"text":572,"correct":22},"0.15MPa",{"key":27,"text":574,"correct":22},"0.2MPa",{"key":31,"text":576,"correct":29},"0.4MPa",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},1136390,"关于阀门的安装要求，正确的说法有（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":29},"阀门安装时应按介质流向确定其安装方向",{"key":24,"text":584,"correct":22},"阀门与管道以螺纹方式连接时，阀门应处于开启状态",{"key":27,"text":586,"correct":22},"阀门与管道以焊接连接时，阀门应处于关闭状态",{"key":31,"text":588,"correct":22},"闸阀与管道以法兰方式连接时，阀门应处于开启状态",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":27,"analysis":33},1136391,"热力管道两个补偿器之间应设置（ ）。",[593,594,595,596],{"key":20,"text":462,"correct":22},{"key":24,"text":464,"correct":22},{"key":27,"text":466,"correct":29},{"key":31,"text":468,"correct":22},{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},1136392,"储罐充水试验中对基础沉降观测的说法，不正确的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"在罐壁下部圆周每隔10m设一个观测点，点数宜为4的倍数，且不少于4个",{"key":24,"text":604,"correct":22},"储罐整体均匀沉降超过50mm时，应立即停止充水进行评估",{"key":27,"text":606,"correct":22},"圆周任何10m范围内不均匀沉降超过13mm，应立即停止充水进行评估",{"key":31,"text":608,"correct":29},"充水和放水过程中，应关闭透光孔",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]