[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,20,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,549,561,573,585,596,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1136287,1,"单选题","地下管线工程测量必须在（ ），测出起、止点等数据",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","开挖前",false,{"key":24,"text":25,"correct":26},"B","回填前",true,{"key":28,"text":29,"correct":22},"C","开挖后",{"key":31,"text":32,"correct":22},"D","回填后","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1136288,"长距离输电线路定位并经检查后，可根据起、止点和转折点及（ ）的实际情况，测设钢塔架基础中心桩",[38,40,42,44],{"key":20,"text":39,"correct":22},"沿途参照物的实际情况",{"key":24,"text":41,"correct":26},"沿途障碍物的实际情况",{"key":28,"text":43,"correct":22},"铁塔的定位螺栓尺寸",{"key":31,"text":45,"correct":22},"铁塔底部的几何尺寸",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1136289,"输电线路钢塔架档距约320m，其基础施工时的档距测量应采用（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"十字线法",{"key":24,"text":53,"correct":26},"电磁波测距法",{"key":28,"text":55,"correct":22},"钢尺量距法",{"key":31,"text":57,"correct":22},"平行基准线法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1136290,"安装控制网水平距离的测设常用测量仪器是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"光学经纬仪",{"key":24,"text":65,"correct":26},"全站仪",{"key":28,"text":67,"correct":22},"光学水准仪",{"key":31,"text":69,"correct":22},"水平仪",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1136291,"电磁波测距仪所采用的载波不包括（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"无线电波",{"key":24,"text":77,"correct":26},"超声波",{"key":28,"text":79,"correct":22},"激光",{"key":31,"text":81,"correct":22},"红外光",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1136294,"下列不属于吊装方案中工艺设计内容的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"吊装工艺方法概述",{"key":24,"text":89,"correct":22},"吊装进度计划",{"key":28,"text":91,"correct":26},"吊装应急预案",{"key":31,"text":93,"correct":22},"吊装参数表",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1136295,"下列不属于吊装参数表内容的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"设备规格尺寸",{"key":24,"text":101,"correct":22},"吊装总重量",{"key":28,"text":103,"correct":26},"吊耳强度",{"key":31,"text":105,"correct":22},"吊点方位及标高",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1136296,"下列关于缆风绳设置要求中说法错误的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"直立单桅杆顶部缆风绳的设置宜为6根至8根",{"key":24,"text":113,"correct":26},"缆风绳与地面的夹角宜为15°，最大不得超过30°",{"key":28,"text":115,"correct":22},"直立单桅杆各相邻缆风绳之间的水平夹角不得大于60°",{"key":31,"text":117,"correct":22},"需要移动的桅杆应设置备用缆风绳",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1136297,"下列关于地锚设置要求中，不正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"地锚设置应按吊装施工方案的规定进行",{"key":24,"text":125,"correct":26},"埋入式地锚基坑的前方坑深2倍的范围内不应有地沟",{"key":28,"text":127,"correct":22},"埋入式地锚设置完成后对受力绳扣进行预拉紧",{"key":31,"text":129,"correct":22},"地锚设置完成后应做好隐蔽工程记录",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1136298,"液压提升大型设备与构件有上拔式和爬升式两种方式，适宜于上拔式方式进行吊装的构件的特征是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"投影面积大，重量相对较轻",{"key":24,"text":137,"correct":22},"投影面积一般、提升高度高",{"key":28,"text":139,"correct":22},"重量相对较轻的直立构件",{"key":31,"text":141,"correct":26},"提升高度相对较低构件的整体提升",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1136299,"起重作业中，选择平衡梁形式的条件不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"设备重量",{"key":24,"text":149,"correct":22},"结构特点",{"key":28,"text":151,"correct":26},"设备的就位高度",{"key":31,"text":153,"correct":22},"现场环境要求",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1136300,"卷扬机的使用中，如果实际适用的钢丝绳的直径与卷扬机铭牌上标明的直径不同时，必须进行（ ）校核。",[158,160,162,164],{"key":20,"text":159,"correct":26},"容绳量",{"key":24,"text":161,"correct":22},"工作速度",{"key":28,"text":163,"correct":22},"卷筒强度",{"key":31,"text":165,"correct":22},"额定牵引拉力",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1136301,"可用于桥梁建造的吊装方法是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"桅杆系统吊装",{"key":24,"text":173,"correct":26},"缆索系统吊装",{"key":28,"text":175,"correct":22},"直升机吊装",{"key":31,"text":177,"correct":22},"液压提升系统",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1136302,"两台在合适工况下额定起重量为25t的汽车起重机共同抬吊一件重物，吊装载荷不应大于（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"36.4t",{"key":24,"text":185,"correct":26},"40t",{"key":28,"text":187,"correct":22},"41.3t",{"key":31,"text":189,"correct":22},"45.5t",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1136303,"在进行某工程吊装时，吊车滑轮组重量0.5t，吊索具重量1t，重物重量3t，臂架头部垂下的钢丝绳重量1t，则流动式起重机的吊装载荷为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"3t",{"key":24,"text":197,"correct":22},"3.5t",{"key":28,"text":199,"correct":22},"4.5t",{"key":31,"text":201,"correct":26},"5.5t",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1136304,"关于焊接工艺评定的说法,不正确的有（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"为验证所拟定的焊接工艺正确性的试验过程及结果评价",{"key":24,"text":209,"correct":22},"对拟定的焊接工艺规程进行评价的报告称之为焊接工艺评定报告",{"key":28,"text":211,"correct":26},"一个焊接工艺评定报告只能用于编制一个焊接工艺规程",{"key":31,"text":213,"correct":22},"一个焊接工艺规程可以依据多个焊接工艺评定报告编制",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1136305,"下列关于焊接工艺评定试件的说法不正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"试件的加工可委托分包",{"key":24,"text":221,"correct":22},"试件应由本单位技能熟练焊工焊制",{"key":28,"text":223,"correct":22},"试件检验项目至少包括外观检查、无损检测、力学性能试验和弯曲试验",{"key":31,"text":225,"correct":26},"试件焊接可以使用检测中心的设备完成",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},1136306,"预防焊接变形的装配工艺措施是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"合理选择焊缝尺寸和形状",{"key":24,"text":233,"correct":22},"合理选择装配程序",{"key":28,"text":235,"correct":22},"合理安排焊缝位置",{"key":31,"text":237,"correct":26},"合理的焊接顺序和方向",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1136307,"焊接技术交底的内容不包括（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"焊接工程特点",{"key":24,"text":245,"correct":22},"WPS内容",{"key":28,"text":247,"correct":22},"焊接进度要求",{"key":31,"text":249,"correct":26},"焊接安全要求",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1136308,"下列焊接用气体中属于保护气体的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"乙炔",{"key":24,"text":257,"correct":22},"丙烷",{"key":28,"text":259,"correct":22},"天然气",{"key":31,"text":261,"correct":26},"氧气",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1136309,"下列关于特种设备的焊接材料复验说法错误的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"球罐用的焊条和药芯焊丝应按批号进行扩散氢复验",{"key":24,"text":269,"correct":22},"工业管道用的焊条、焊丝、焊剂库存超过期限，应经复验合格后方可使用",{"key":28,"text":271,"correct":22},"酸性焊接材料及防潮包装密封良好的低氢型焊接材料的规定期限一般为2年",{"key":31,"text":273,"correct":26},"石墨型焊接材料及其他焊接材料的规定期限为2年",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1136310,"下列关于钨极惰性气体保护焊特点说法错误的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"焊接工艺适用性强，几乎可以焊接所有的金属材料",{"key":24,"text":281,"correct":22},"焊接场地不受限制",{"key":28,"text":283,"correct":22},"焊接过程不产生溶渣",{"key":31,"text":285,"correct":26},"焊接过程有烟尘和飞溅，需要做好个体防护",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1136311,"下列检测内容中，不属于焊评试件检验项目的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"无损检测",{"key":24,"text":293,"correct":22},"力学性能试验",{"key":28,"text":295,"correct":22},"弯曲试验",{"key":31,"text":297,"correct":26},"压力试验",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},1136312,"下列不属于焊接技术交底内容的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"预焊接工艺规程内容",{"key":24,"text":305,"correct":22},"焊接质量检验计划",{"key":28,"text":307,"correct":22},"进度要求",{"key":31,"text":243,"correct":22},{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":28,"analysis":33},1136313,"下列不属于防止产生再热裂纹方法的是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"减少焊接应力",{"key":24,"text":316,"correct":22},"预热",{"key":28,"text":318,"correct":26},"降低塑性变形能力",{"key":31,"text":320,"correct":22},"用低强度焊缝",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1136314,"下列不属于焊接变形危害的是（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"降低装配质量",{"key":24,"text":328,"correct":22},"降低承载力",{"key":28,"text":330,"correct":22},"提高制造成本",{"key":31,"text":332,"correct":26},"降低矫正工序",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1136315,"与焊接线能量有直接关系的因素不包括（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"焊接电流",{"key":24,"text":340,"correct":26},"焊接温度",{"key":28,"text":342,"correct":22},"电弧电压",{"key":31,"text":344,"correct":22},"焊接速度",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":20,"analysis":33},1136316,"常用的无损检测方法中，适合于焊缝内部缺陷检测的方法是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":26},"射线探伤",{"key":24,"text":352,"correct":22},"涡流探伤",{"key":28,"text":354,"correct":22},"磁性探伤",{"key":31,"text":356,"correct":22},"渗透探伤",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":31,"analysis":33},1136317,"对于钢制管道弯曲半径最大的是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"冲压弯头",{"key":24,"text":364,"correct":22},"焊接弯头",{"key":28,"text":366,"correct":22},"钢管热弯",{"key":31,"text":368,"correct":26},"钢管冷弯",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},1136318,"室内给水管道安装的原则错误的是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"先主管后支管",{"key":24,"text":376,"correct":26},"先下部后上部",{"key":28,"text":378,"correct":22},"先里后外",{"key":31,"text":380,"correct":22},"先钢制管道后塑料管道",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1136319,"下列关于室内排水管道系统试验的说法错误的是（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":26},"隐蔽的排水管道在隐蔽前必须做灌水试验和通水试验",{"key":24,"text":388,"correct":22},"安装在室内的雨水管安装后应做灌水试验",{"key":28,"text":390,"correct":22},"通球球径不小于排水管道管径的2\u002F3",{"key":31,"text":392,"correct":22},"通球率必须达到100%",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},1136320,"下列插座接线中，符合要求的是（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":26},"同一场所三相插座的接线相序一致",{"key":24,"text":400,"correct":22},"插座保护接地线端子与中性线端子连接",{"key":28,"text":402,"correct":22},"保护接地线在插座之间串联连接",{"key":31,"text":404,"correct":22},"相线与中性线用插座的接线端子转接供电",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},1136321,"防雷接地装置施工程序中，引下线敷设的紧后工作是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"接地干线施工",{"key":24,"text":412,"correct":22},"接地体施工",{"key":28,"text":414,"correct":22},"接闪带施工",{"key":31,"text":416,"correct":26},"均压环施工",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},1136322,"对于可弯曲金属导管及柔性导管敷设要求说法不正确的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"与刚性导管连接应采用专用接头",{"key":24,"text":424,"correct":22},"明配金属柔性导管固定点间距不应大于1m",{"key":28,"text":426,"correct":26},"柔性导管在照明工程中不宜大于0.8m",{"key":31,"text":428,"correct":22},"可弯曲金属导管不应作为保护导体的接续导体",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},1136323,"下列关于灯具安装技术说法正确的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"灯具安装前的绝缘电阻值不应小于1MΩ",{"key":24,"text":436,"correct":22},"灯具固定检查应每检验批的灯具数量抽查5%",{"key":28,"text":438,"correct":22},"质量为15kg的灯具，采用60kg对其固定和悬吊装置进行强度试验",{"key":31,"text":440,"correct":26},"灯具固定装置及悬吊装置的载荷强度试验记录应全数检查",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},1136324,"镀锌钢板制作风管时，不适用高压风管连接的形式是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"单咬口",{"key":24,"text":448,"correct":22},"联合角咬口",{"key":28,"text":450,"correct":22},"转角咬口",{"key":31,"text":452,"correct":26},"按扣式咬口",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},1136325,"净化空调系统的检测和调整，应在系统正常运行（ ）h及以上，达到稳定后进行。",[457,459,461,463],{"key":20,"text":458,"correct":22},"8",{"key":24,"text":460,"correct":22},"12",{"key":28,"text":462,"correct":22},"18",{"key":31,"text":464,"correct":26},"24",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},1136326,"柔性短管的制作要求说法不正确的是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"防排烟系统的柔性短管必须为不燃材料",{"key":24,"text":472,"correct":22},"柔性材料应为不透气材料",{"key":28,"text":474,"correct":26},"柔性短管长度宜为300mm",{"key":31,"text":476,"correct":22},"柔性短管不应为异径连接管",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1136327,"对智能化产品选择时，需要考虑的因素不包括（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"品牌",{"key":24,"text":484,"correct":22},"应用实践",{"key":28,"text":486,"correct":22},"监控距离",{"key":31,"text":488,"correct":26},"标准协议",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},1136328,"下列不属于通风空调设备系统调试检测的内容（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"新风量",{"key":24,"text":496,"correct":22},"风机故障报警",{"key":28,"text":498,"correct":22},"电气联锁",{"key":31,"text":500,"correct":26},"低压开关运行状况",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1136329,"电磁阀安装前检验的内容不包括（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"线圈与阀体间的电阻",{"key":24,"text":508,"correct":26},"供电电压",{"key":28,"text":510,"correct":22},"模拟动作试验",{"key":31,"text":512,"correct":22},"试压试验",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1136330,"下列分项工程中，不属于液压电梯安装工程的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":26},"补偿装置安装",{"key":24,"text":520,"correct":22},"悬挂装置安装",{"key":28,"text":522,"correct":22},"导轨安装",{"key":31,"text":524,"correct":22},"对重（平衡重）安装",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},1136331,"关于曳引式电梯的说法不正确的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"层门预留孔必须设有高度不小于1200mm的安全保护围封",{"key":24,"text":532,"correct":22},"当轿厢完全压在缓冲器上时，随行电缆不得与底坑地面接触",{"key":28,"text":534,"correct":22},"动力导体之间的绝缘电阻不小于0.5MΩ",{"key":31,"text":536,"correct":26},"机房接地线接地电阻值不小于4Ω",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":28,"analysis":33},1136332,"关于电梯井道内应设置永久性电气照明的要求，错误的是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"井道照明电压宜采用36V安全电压",{"key":24,"text":544,"correct":22},"电梯井道的照明照度不得小于50lx",{"key":28,"text":546,"correct":26},"井道最高点和最低点0.5m内不应装灯",{"key":31,"text":548,"correct":22},"井道内的中间照明灯间距不超过7m",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1136333,"下列选项中，不属于消防工程验收过程中现场检查内容的是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"生产装置性质",{"key":24,"text":556,"correct":26},"消防人员数量",{"key":28,"text":558,"correct":22},"消防车通道的布置",{"key":31,"text":560,"correct":22},"各类消防设施的配备",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},1136334,"用于高层民用建筑内的可燃油浸电力变压器的灭火系统类别是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":26},"水喷雾灭火系统",{"key":24,"text":568,"correct":22},"干式灭火系统",{"key":28,"text":570,"correct":22},"雨淋系统",{"key":31,"text":572,"correct":22},"湿式灭火系统",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1136335,"消防工程验收条件中，施工单位提交的资料不包括（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"设备开箱记录",{"key":24,"text":580,"correct":26},"消防设施产品合格证明文件",{"key":28,"text":582,"correct":22},"施工记录",{"key":31,"text":584,"correct":22},"竣工图",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},1136336,"根据供水方式分为泵组系统和瓶组系统，闭式系统不应采用瓶组系统的是（ ）。",[589,591,593,594],{"key":20,"text":590,"correct":22},"干式系统",{"key":24,"text":592,"correct":22},"湿式系统",{"key":28,"text":570,"correct":22},{"key":31,"text":595,"correct":26},"高压细水雾灭火系统",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":24,"analysis":33},1136337,"起重吊装中，卷扬机走绳其安全系数一般不小于（ ）。",[600,602,604,605],{"key":20,"text":601,"correct":22},"3.5",{"key":24,"text":603,"correct":26},"5",{"key":28,"text":458,"correct":22},{"key":31,"text":606,"correct":22},"12~14",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":28,"analysis":33},1136338,"在滑轮组选择时，第一步是（ ）。",[611,613,615,617],{"key":20,"text":612,"correct":22},"选择跑绳直径",{"key":24,"text":614,"correct":22},"选择导向轮",{"key":28,"text":616,"correct":26},"选择滑轮组的额定载荷和门数",{"key":31,"text":618,"correct":22},"选择滑轮组穿绕跑绳的方法",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]