[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":600},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,17,50,2021,[13,34,46,58,70,82,94,106,118,130,139,151,163,175,186,195,207,218,230,242,254,262,274,283,291,303,315,327,339,351,361,373,385,397,409,421,433,444,456,468,480,492,504,516,528,540,552,564,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1136135,1,"单选题","主控项目是对工程质量、安全、卫生，环境保护和（），及对工程质量起决定性作用的检验项目。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","投产后的运转率",false,{"key":24,"text":25,"correct":22},"B","投产后的产能",{"key":27,"text":28,"correct":22},"C","达产达标周期",{"key":30,"text":31,"correct":32},"D","公众利益",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1136136,"观感质量验收时评价为差的检查点，应通过（）等补救。",[38,40,42,44],{"key":20,"text":39,"correct":32},"返修处理",{"key":24,"text":41,"correct":22},"让步处理",{"key":27,"text":43,"correct":22},"拆除返工",{"key":30,"text":45,"correct":22},"协商谅解",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1136137,"分部工程中对工程质量影响大的分项工程定为（）分项工程。",[50,52,54,56],{"key":20,"text":51,"correct":22},"主体",{"key":24,"text":53,"correct":22},"关键",{"key":27,"text":55,"correct":32},"主要",{"key":30,"text":57,"correct":22},"重要",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1136138,"工业安装工程质量验收的程序应按（）的顺序依次进行。",[62,64,66,68],{"key":20,"text":63,"correct":22},"分部工程→分项工程→单位工程",{"key":24,"text":65,"correct":22},"单位工程→分部工程→分项工程",{"key":27,"text":67,"correct":32},"分项工程→分部工程→单位工程",{"key":30,"text":69,"correct":22},"单位工程→分项工程→分部工程",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1136139,"电气装置分项工程应按（）进行划分。",[74,76,78,80],{"key":20,"text":75,"correct":22},"车间",{"key":24,"text":77,"correct":32},"电气设备和电气线路",{"key":27,"text":79,"correct":22},"区域",{"key":30,"text":81,"correct":22},"电气室",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1136140,"单位工程质量控制资料的检查结论应由（）做出。",[86,88,90,92],{"key":20,"text":87,"correct":22},"建设单位",{"key":24,"text":89,"correct":22},"施工单位",{"key":27,"text":91,"correct":22},"监理单位",{"key":30,"text":93,"correct":32},"监理（建设）单位与施工单位共同",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1136141,"工业安装工程分项工程质量验收记录填写的主要内容不包括（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"检验项目",{"key":24,"text":101,"correct":22},"施工单位检验结果",{"key":27,"text":103,"correct":32},"设计单位验收结论",{"key":30,"text":105,"correct":22},"监理单位验收结论",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1136142,"工业管道按介质划分，不应视为主要分项工程的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"氧气管道",{"key":24,"text":113,"correct":22},"煤气管道",{"key":27,"text":115,"correct":32},"冷凝水管道",{"key":30,"text":117,"correct":22},"天然气管道",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1136143,"下列工业安装工程中，可视为主分部工程的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"化工厂房的设备安装分部工程",{"key":24,"text":125,"correct":22},"煤气管道工程",{"key":27,"text":127,"correct":22},"氧气管道工程",{"key":30,"text":129,"correct":22},"电气装置工程",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1136144,"分部工程质量验收记录的检查评定结论由（）填写。",[134,135,136,137],{"key":20,"text":87,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":89,"correct":32},{"key":30,"text":138,"correct":22},"设计单位",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1136145,"虽然检测测定达不到设计要求，但经原设计单位核算认可能满足结构安全和使用功能的检验项目可（）。",[143,145,147,149],{"key":20,"text":144,"correct":32},"验收通过",{"key":24,"text":146,"correct":22},"采取一定措施后让步接受",{"key":27,"text":148,"correct":22},"协商通过",{"key":30,"text":150,"correct":22},"先试用，确认可靠后验收通过",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},1136146,"工业分部工程质量验收的结论由（）填写。",[155,157,159,161],{"key":20,"text":156,"correct":22},"建设或施工单位",{"key":24,"text":158,"correct":32},"建设或监理单位",{"key":27,"text":160,"correct":22},"监理或施工单位",{"key":30,"text":162,"correct":22},"设计或监理单位",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":30,"analysis":33},1136147,"单位工程中，对于投产后的（）均具有举足轻重影响的分部工程，视为主分部工程。",[167,169,171,173],{"key":20,"text":168,"correct":22},"安全和产量",{"key":24,"text":170,"correct":22},"质量和产量",{"key":27,"text":172,"correct":22},"安全和质量",{"key":30,"text":174,"correct":32},"安全和使用功能",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":27,"analysis":33},1136148,"下列管道分项工程中，属于主要分项工程是（）。",[179,181,183,184],{"key":20,"text":180,"correct":22},"物料输送管道",{"key":24,"text":182,"correct":22},"空气输送管道",{"key":27,"text":113,"correct":32},{"key":30,"text":185,"correct":22},"给排水管道",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},1136149,"分部工程质量验收应在各分项工程验收合格的基础上，由施工单位向（）提出报验申请。",[190,191,192,193],{"key":20,"text":87,"correct":32},{"key":24,"text":91,"correct":22},{"key":27,"text":138,"correct":22},{"key":30,"text":194,"correct":22},"质监单位",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":20,"analysis":33},1136150,"承包方项目部的质量部门要收集相关的工程验收记录并建立（）。",[199,201,203,205],{"key":20,"text":200,"correct":32},"工程质量动态台账",{"key":24,"text":202,"correct":22},"工程质量活动记录",{"key":27,"text":204,"correct":22},"质量活动例行检查记录",{"key":30,"text":206,"correct":22},"质量事故返修记录",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},1136151,"分包单位对承包的项目进行验收时，应有（）参加。",[211,213,215,217],{"key":20,"text":212,"correct":22},"质监部门",{"key":24,"text":214,"correct":22},"供应商",{"key":27,"text":216,"correct":32},"总包单位",{"key":30,"text":138,"correct":22},{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},1136152,"分项工程质量验收记录应由施工单位（）填写。",[222,224,226,228],{"key":20,"text":223,"correct":22},"专业施工员",{"key":24,"text":225,"correct":32},"质量检验员",{"key":27,"text":227,"correct":22},"工程资料员",{"key":30,"text":229,"correct":22},"技术负责人",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":30,"analysis":33},1136153,"观感质量验收，通常采用观察及（）等简单的方式进行。",[234,236,238,240],{"key":20,"text":235,"correct":22},"测量",{"key":24,"text":237,"correct":22},"模拟",{"key":27,"text":239,"correct":22},"检测",{"key":30,"text":241,"correct":32},"触摸",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":30,"analysis":33},1136154,"对于难以返工又难以确定的质量部位，由有（）的检测单位检测鉴定。",[246,248,250,252],{"key":20,"text":247,"correct":22},"有能力的",{"key":24,"text":249,"correct":22},"验收组织机构指定的",{"key":27,"text":251,"correct":22},"有经验的",{"key":30,"text":253,"correct":32},"有资质的",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},1136155,"单位（子单位）工程质量验收记录表中的分部工程和质量控制资料的检查记录应由（）填写。",[258,259,260,261],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":32},{"key":27,"text":91,"correct":22},{"key":30,"text":138,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1136156,"主控项目是保证安装工程安全和使用功能的重要检验项目，其要求（）。",[266,268,270,272],{"key":20,"text":267,"correct":32},"必须达到",{"key":24,"text":269,"correct":22},"应该符合",{"key":27,"text":271,"correct":22},"不得违反",{"key":30,"text":273,"correct":22},"严格把关",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1136157,"工程质量验收的组织机构不包括（）。",[278,280,281,282],{"key":20,"text":279,"correct":32},"当地劳动仲裁部门",{"key":24,"text":87,"correct":22},{"key":27,"text":138,"correct":22},{"key":30,"text":91,"correct":22},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},1136158,"工业安装工程中，单位（子单位）工程质量验收记录表中的分部工程和质量控制资料的检查记录应由（）填写。",[287,288,289,290],{"key":20,"text":87,"correct":22},{"key":24,"text":89,"correct":32},{"key":27,"text":91,"correct":22},{"key":30,"text":138,"correct":22},{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":30,"analysis":33},1136159,"镁质耐火材料是以镁石作为原料,因其抵抗（）物质的侵蚀能力较好,常用于有色金属火法冶炼中的耐火材料。",[295,297,299,301],{"key":20,"text":296,"correct":22},"酸性",{"key":24,"text":298,"correct":22},"腐蚀性",{"key":27,"text":300,"correct":22},"氧化性",{"key":30,"text":302,"correct":32},"碱性",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":30,"analysis":33},1136160,"适用于低、中压空调系统及潮湿环境，但对高压及洁净空调、酸碱性环境和防排烟系统不适用的风管，一般用（）制成。",[307,309,311,313],{"key":20,"text":308,"correct":22},"聚氨酯复合板材",{"key":24,"text":310,"correct":22},"玻璃纤维复合板材",{"key":27,"text":312,"correct":22},"无机玻璃钢板材",{"key":30,"text":314,"correct":32},"酚醛复合板材",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":24,"analysis":33},1136161,"填料塔是静置设备中的（）。",[319,321,323,325],{"key":20,"text":320,"correct":22},"换热设备",{"key":24,"text":322,"correct":32},"塔设备",{"key":27,"text":324,"correct":22},"分离设备",{"key":30,"text":326,"correct":22},"过滤设备",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":27,"analysis":33},1136162,"压缩机按压缩气体方式可分为容积式和（）压缩机两大类。",[331,333,335,337],{"key":20,"text":332,"correct":22},"转速型",{"key":24,"text":334,"correct":22},"轴流型",{"key":27,"text":336,"correct":32},"动力式",{"key":30,"text":338,"correct":22},"螺杆型",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":20,"analysis":33},1136163,"控制设备安装标高的常用测量仪器是（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":32},"水准仪",{"key":24,"text":346,"correct":22},"激光准直仪",{"key":27,"text":348,"correct":22},"全站仪",{"key":30,"text":350,"correct":22},"光学经纬仪",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":27,"analysis":33},1136164,"机电工程中，主要用于测量纵向、横向轴线（中心线）以及垂直度的控制测量仪器是（ ）。",[355,357,359,360],{"key":20,"text":356,"correct":22},"光学水准仪",{"key":24,"text":358,"correct":22},"激光准直（铅直）仪",{"key":27,"text":350,"correct":32},{"key":30,"text":348,"correct":22},{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1136165,"水准点之间的距离，一般地区应为1～3km，工厂区宜小于（ ）km。",[365,367,369,371],{"key":20,"text":366,"correct":22},"2",{"key":24,"text":368,"correct":32},"1",{"key":27,"text":370,"correct":22},"3",{"key":30,"text":372,"correct":22},"1.5",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1136166,"地下管线工程测量时，测量出起、止及相关部位的标高，必须在（ ）进行。",[377,379,381,383],{"key":20,"text":378,"correct":22},"在管道敷设前",{"key":24,"text":380,"correct":32},"回填前",{"key":27,"text":382,"correct":22},"管道敷设过程中",{"key":30,"text":384,"correct":22},"回填后",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1136167,"一般大吨位起重机较多采用（），对起重机站位处的地基的要求相对较低，但行走速度较慢，转移场地需要用平板拖车运输。",[389,391,393,395],{"key":20,"text":390,"correct":22},"汽车式起重机",{"key":24,"text":392,"correct":32},"履带式起重机",{"key":27,"text":394,"correct":22},"轮胎式起重机",{"key":30,"text":396,"correct":22},"塔式起重机",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},1136168,"针对履带起重机吊装时失稳的主要原因,适宜采取的预防措施是（）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"做好吊装受力分析与工艺计算",{"key":24,"text":404,"correct":32},"严格机械检查,严禁超载",{"key":27,"text":406,"correct":22},"打好支腿,确保支腿稳定",{"key":30,"text":408,"correct":22},"吊装现场操作协调一致",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},1136169,"平衡梁在多机抬吊时，可以合理分配或平衡各吊点的（）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"吊索的长度",{"key":24,"text":416,"correct":22},"水平压力",{"key":27,"text":418,"correct":32},"荷载",{"key":30,"text":420,"correct":22},"动滑轮的起吊高度",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1136170,"下列焊接检验方法中，不属于非破坏性试验的是（）。",[425,427,429,431],{"key":20,"text":426,"correct":32},"弯曲试验",{"key":24,"text":428,"correct":22},"渗透检测",{"key":27,"text":430,"correct":22},"耐压试验",{"key":30,"text":432,"correct":22},"泄露试验",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},1136171,"对焊接部位难清理的焊件，宜选用（）焊条。",[437,439,440,442],{"key":20,"text":438,"correct":22},"低温钢",{"key":24,"text":296,"correct":32},{"key":27,"text":441,"correct":22},"低氢性",{"key":30,"text":443,"correct":22},"不锈钢",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":30,"analysis":33},1136172,"目前，我国水泥回转窑筒体中心找正采用的是（）测量技术。",[448,450,452,454],{"key":20,"text":449,"correct":22},"经纬仪",{"key":24,"text":451,"correct":22},"钢丝",{"key":27,"text":453,"correct":22},"筒体外设标板",{"key":30,"text":455,"correct":32},"激光对中",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},1136173,"T形头地脚螺栓是属于（）地脚螺栓。",[460,462,464,466],{"key":20,"text":461,"correct":32},"活动型",{"key":24,"text":463,"correct":22},"固定型",{"key":27,"text":465,"correct":22},"胀锚型",{"key":30,"text":467,"correct":22},"预埋型",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":24,"analysis":33},1136174,"机械设备安装工程的施工程序中，（）是机械设备安装工程中关键的一环，它直接影响安装工程质量。",[472,474,476,478],{"key":20,"text":473,"correct":22},"设备基础检验",{"key":24,"text":475,"correct":32},"精度检测与调整",{"key":27,"text":477,"correct":22},"调整与试运转",{"key":30,"text":479,"correct":22},"工程竣工",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":24,"analysis":33},1136175,"设备的二次灌浆是在（）对设备底座和基础间进行的灌浆。",[484,486,488,490],{"key":20,"text":485,"correct":22},"设备吊装后",{"key":24,"text":487,"correct":32},"设备精找正后",{"key":27,"text":489,"correct":22},"设备粗平后",{"key":30,"text":491,"correct":22},"设备装配后",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":20,"analysis":33},1136176,"基础与设备之间的（）强度不够、不密实，会造成地脚螺栓和垫铁松动引起安装偏差发生变化。",[496,498,500,502],{"key":20,"text":497,"correct":32},"二次灌浆的质量",{"key":24,"text":499,"correct":22},"垫铁形式",{"key":27,"text":501,"correct":22},"垫铁的布局",{"key":30,"text":503,"correct":22},"垫铁的组数",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":24,"analysis":33},1136177,"在电动机检查过程中，应作抽芯检查的情况不包括（）。",[508,510,512,514],{"key":20,"text":509,"correct":22},"电动机出厂期限超过制造厂保证期限的",{"key":24,"text":511,"correct":32},"若制造厂无保证期限，出厂日期已超过半年的",{"key":27,"text":513,"correct":22},"经外观检查质量可疑时",{"key":30,"text":515,"correct":22},"经电气试验，质量可疑时",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":30,"analysis":33},1136178,"输配电架空线路施工工序为：线路测量、基础施工、（）等。",[520,522,524,526],{"key":20,"text":521,"correct":22},"放线架线、杆塔组立、线路试验、导线连接、竣工验收检查",{"key":24,"text":523,"correct":22},"导线连接、放线架线、杆塔组立、线路试验、竣工验收检查",{"key":27,"text":525,"correct":22},"导线连接、线路试验、放线架线、杆塔组立、竣工验收检查",{"key":30,"text":527,"correct":32},"杆塔组立、放线架线、导线连接、线路试验、竣工验收检查",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1136179,"变压器低压侧中性点必须（）。",[532,534,536,538],{"key":20,"text":533,"correct":22},"串电阻接地",{"key":24,"text":535,"correct":32},"直接与接地装置引出的接地干线进行连接",{"key":27,"text":537,"correct":22},"串电抗接地",{"key":30,"text":539,"correct":22},"串消弧线圈接地",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1136180,"电动机安装中，做法错误的是（）。",[544,546,548,550],{"key":20,"text":545,"correct":22},"电动机与基础之间衬垫防振物体",{"key":24,"text":547,"correct":32},"拧紧螺母时要按顺时针次序拧紧",{"key":27,"text":549,"correct":22},"应用水平仪调整电动机的水平度",{"key":30,"text":551,"correct":22},"电动机底座安装完后进行二次灌浆",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":24,"analysis":33},1136181,"材质为不锈钢的的管道元件和材料，在运输及储存期间不得与（）接触。",[556,558,560,562],{"key":20,"text":557,"correct":22},"聚丙烯",{"key":24,"text":559,"correct":32},"低合金钢",{"key":27,"text":561,"correct":22},"有色金属",{"key":30,"text":563,"correct":22},"有机硅",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":30,"analysis":33},1136182,"输送极度危害、高度危害流体以及可燃流体的管道在耐压试验合格后应进行（）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"气压试验",{"key":24,"text":571,"correct":22},"气密性试验",{"key":27,"text":573,"correct":22},"液压试验",{"key":30,"text":575,"correct":32},"泄漏试验",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":27,"analysis":33},1136183,"在管道的吹扫与清洗方法中，公称直径小于600mm的气体管道宜采用（）。",[580,582,584,586],{"key":20,"text":581,"correct":22},"人工清理",{"key":24,"text":583,"correct":22},"蒸汽吹扫",{"key":27,"text":585,"correct":32},"压缩空气吹扫",{"key":30,"text":587,"correct":22},"水冲洗",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":24,"analysis":33},1136184,"管道吹洗的顺序应按（）依次进行。",[592,594,596,598],{"key":20,"text":593,"correct":22},"支管→主管→疏排管",{"key":24,"text":595,"correct":32},"主管→支管→疏排管",{"key":27,"text":597,"correct":22},"疏排管→主管→支管",{"key":30,"text":599,"correct":22},"疏排管→支管→主管",[601,604,607,610,613,616],{"id":15,"name":602,"category":7,"favorite":603},"领导干部任职前廉政法规知识测试题",92,{"id":605,"name":606,"category":7,"favorite":15},595,"建筑结构与设备",{"id":608,"name":609,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":611,"name":612,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":614,"name":615,"category":7,"favorite":8},534,"BIM工程师",{"id":617,"name":615,"category":7,"favorite":8},535]