[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,15,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,321,333,345,356,368,378,390,402,414,426,438,450,462,474,486,498,510,522,534,542,554,562,574,586,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1136032,1,"单选题","计量标准器具使用时,除应具备称职的保存、使用人员外,还应具备称职的（）人员。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","检定",false,{"key":24,"text":25,"correct":26},"B","维护",true,{"key":28,"text":29,"correct":22},"C","档案管理",{"key":31,"text":32,"correct":22},"D","质量监督","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1136033,"计量基准的量值应当与（）量值保持一致。",[38,40,42,44],{"key":20,"text":39,"correct":22},"施工所在省区的",{"key":24,"text":41,"correct":22},"施工所在国的",{"key":28,"text":43,"correct":26},"国际上的",{"key":31,"text":45,"correct":22},"本国的",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1136034,"计量检定按其检定的目的和性质分为（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"强制检定、后续检定、使用中检定、周期检定和仲裁检定",{"key":24,"text":53,"correct":22},"首次检定、强制检定、使用中检定、周期检定和仲裁检定",{"key":28,"text":55,"correct":22},"首次检定、后续检定、强制检定、周期检定和仲裁检定",{"key":31,"text":57,"correct":26},"首次检定、后续检定、使用中检定、周期检定和仲裁检定",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1136035,"强制检定和非强制检定均属于（）检定。",[62,64,66,68],{"key":20,"text":63,"correct":22},"重要",{"key":24,"text":65,"correct":22},"最高",{"key":28,"text":67,"correct":22},"常用",{"key":31,"text":69,"correct":26},"法制",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1136036,"施工单位对非强制性检定的计量器进行检定时，（）检定。",[74,76,78,80],{"key":20,"text":75,"correct":22},"应送部门管辖的检定机构",{"key":24,"text":77,"correct":22},"应送工程所在地地市级以上检定机构",{"key":28,"text":79,"correct":22},"应送单位所在地地市级以上检定机构",{"key":31,"text":81,"correct":26},"可送工程所在地具有相应资质的检定机构",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1136037,"为社会提供公证数据的产品质量检验机构，必须经（）计量行政部门计量认证。",[86,88,90,92],{"key":20,"text":87,"correct":26},"省级以上人民政府",{"key":24,"text":89,"correct":22},"地级以上人民政府",{"key":28,"text":91,"correct":22},"县级以上人民政府",{"key":31,"text":93,"correct":22},"市级以上人民政府",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1136038,"计量检定是指评定计量器具的（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"计量偏差",{"key":24,"text":101,"correct":22},"计量效果",{"key":28,"text":103,"correct":26},"计量性能",{"key":31,"text":105,"correct":22},"计量寿命",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1136039,"标志标明“封存”字样的计量器具，所处的状态是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"根据使用频率暂停使用",{"key":24,"text":113,"correct":22},"已经到期检定暂未检定",{"key":28,"text":115,"correct":22},"经检定不合格",{"key":31,"text":117,"correct":22},"有缺陷暂不能使用",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1136040,"计量检测设备每次使用前应（）检查后，方可开始计量测试。",[122,124,126,128],{"key":20,"text":123,"correct":22},"认真清扫",{"key":24,"text":125,"correct":22},"对零部件",{"key":28,"text":127,"correct":22},"对使用场地",{"key":31,"text":129,"correct":26},"校准复位",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1136041,"实行强制检定的工作计量器具目录由（）确定。",[134,136,138,140],{"key":20,"text":135,"correct":26},"国务院",{"key":24,"text":137,"correct":22},"省直辖市人民政府",{"key":28,"text":139,"correct":22},"地级市人民政府",{"key":31,"text":141,"correct":22},"县人民政府",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1136042,"强制检定的检定周期，由执行强制检定的（）按照计量检定规程确定。",[146,148,150,152],{"key":20,"text":147,"correct":22},"管理机构",{"key":24,"text":149,"correct":22},"监督机构",{"key":28,"text":151,"correct":22},"检定机构",{"key":31,"text":153,"correct":26},"技术机构",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1136043,"下列属于企业C类计量器具的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"卡尺",{"key":24,"text":161,"correct":22},"塞尺",{"key":28,"text":163,"correct":26},"钢直尺",{"key":31,"text":165,"correct":22},"温度计",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1136044,"下列列入项目部A类工作计量器具的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"焊接检验尺",{"key":24,"text":173,"correct":26},"接地电阻测试仪",{"key":28,"text":175,"correct":22},"万用表",{"key":31,"text":177,"correct":22},"压力表",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1136045,"计量基准器具的使用需经（）审批并颁发计量基准证书后,方可使用。",[182,184,186,188],{"key":20,"text":183,"correct":26},"国务院计量行政部门",{"key":24,"text":185,"correct":22},"省人民政府计量行政部门",{"key":28,"text":187,"correct":22},"地级市人民政府计量行政部门",{"key":31,"text":189,"correct":22},"县人民政府计量行政部门",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1136046,"县级以上地方人民政府计量行政部门对计量器具监督时,被监督单位不包括（）单位。",[194,196,198,200],{"key":20,"text":195,"correct":22},"制造",{"key":24,"text":197,"correct":22},"销售",{"key":28,"text":199,"correct":26},"检测",{"key":31,"text":201,"correct":22},"使用",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1136047,"产品质量检验机构提出计量认证申请后，（）应指定所属的计量检定机构或者被授权的技术进行进行考核，考核后可靠后，由该部门发给计量认证合格证书",[206,208,210,212],{"key":20,"text":207,"correct":22},"乡镇政府",{"key":24,"text":209,"correct":22},"街道办事处",{"key":28,"text":211,"correct":22},"县级人民政府计量行政部门",{"key":31,"text":213,"correct":26},"省级以上人民政府计量行政部门",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1136048,"控制计量器使用状态的检定是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"修理后检定",{"key":24,"text":221,"correct":26},"使用中检定",{"key":28,"text":223,"correct":22},"后续检定",{"key":31,"text":225,"correct":22},"周期检定",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1136049,"计费电能表及附件的购置、安装、移动、更换及拆除等,均由（）负责办理。",[230,232,234,236],{"key":20,"text":231,"correct":22},"用户",{"key":24,"text":233,"correct":22},"电能表厂家",{"key":28,"text":235,"correct":26},"供电企业",{"key":31,"text":237,"correct":22},"持证电工",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1136050,"施工现场的临时用电工程检查应（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"每周一次",{"key":24,"text":245,"correct":26},"每月一次",{"key":28,"text":247,"correct":22},"每季一次",{"key":31,"text":249,"correct":22},"半年一次",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1136051,"关于用电计量装置安装位置的说法，正确的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"公用线路的高压用户在变压器输入端装计量装置",{"key":24,"text":257,"correct":22},"专线供电的高压用户在变压器输入端装计量装置",{"key":28,"text":259,"correct":22},"公用线路的高压用户在变压器输出端装计量装置",{"key":31,"text":261,"correct":26},"用电计量装置应装在供电设施的产权分界处",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1136052,"未经供电企业许可，施工单位不允许的用电行为规定中不包括（）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"擅自引入外来电源",{"key":24,"text":269,"correct":22},"擅自将现有电源供出",{"key":28,"text":271,"correct":22},"擅自将自备电源并网",{"key":31,"text":273,"correct":26},"擅自将自备电源扩容",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1136053,"220kV电压等级的杆塔周围禁止取土的范围是（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"4m内",{"key":24,"text":281,"correct":26},"5m内",{"key":28,"text":283,"correct":22},"8m内",{"key":31,"text":285,"correct":22},"10m内",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1136054,"为防止工程项目施工使用的自备电源误入市政电网，施工单位在使用前要告知（）并征得同意。",[290,292,294,296],{"key":20,"text":291,"correct":22},"安全监督部门",{"key":24,"text":293,"correct":22},"电力行政管理部门",{"key":28,"text":295,"correct":22},"建设单位",{"key":31,"text":297,"correct":26},"供电部门",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1136055,"施工现场临时用电工程的定期检查应复测（）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"对地绝缘值",{"key":24,"text":305,"correct":26},"接地电阻值",{"key":28,"text":307,"correct":22},"对地放电值",{"key":31,"text":309,"correct":22},"接地电流值",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},1136056,"工程建设临时用电方案的审批单位（或部门）是（）。",[314,315,317,319],{"key":20,"text":295,"correct":22},{"key":24,"text":316,"correct":22},"监理单位",{"key":28,"text":318,"correct":22},"施工单位",{"key":31,"text":320,"correct":26},"电力部门",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},1136057,"对于用户与供电企业联系，就工程供电的可能性、用电容量和供电条件等达成意向性协议的新建受电工程项目，其所处的阶段是（）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"立项",{"key":24,"text":328,"correct":22},"批复",{"key":28,"text":330,"correct":22},"施工",{"key":31,"text":332,"correct":22},"竣工",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":31,"analysis":33},1136058,"临时用电是编制临时用电施工组织设计，还是编制安全用电技术措施和电气防火措施，通常的根据是（）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"最小设备容量",{"key":24,"text":340,"correct":22},"平均设备容量",{"key":28,"text":342,"correct":22},"辅助设备容量",{"key":31,"text":344,"correct":26},"设备总容量",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1136059,"用电安全规定未经供电企业许可，施工单位不得擅自（）电源。",[349,351,352,354],{"key":20,"text":350,"correct":22},"迁移",{"key":24,"text":201,"correct":22},{"key":28,"text":353,"correct":26},"引入",{"key":31,"text":355,"correct":22},"关停",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1136060,"以下符合架空电力线路保护区内取土规定的是（）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"预留通道",{"key":24,"text":363,"correct":22},"沙地取土坡度应当高一些",{"key":28,"text":365,"correct":22},"取土坡度50°",{"key":31,"text":367,"correct":22},"各等级塔杆周围取土范围一样",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},1136061,"计费电能表及附件的安装及拆除，负责办理的企业是（）。",[372,373,375,376],{"key":20,"text":295,"correct":22},{"key":24,"text":374,"correct":22},"供货厂家",{"key":28,"text":235,"correct":26},{"key":31,"text":377,"correct":22},"施工企业",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1136062,"临时用电通常是根据（），编制临时用电施工组织设计，或编制安全用电技术措施和电气防火措施。",[382,384,386,388],{"key":20,"text":383,"correct":22},"设备最大容量的不同",{"key":24,"text":385,"correct":22},"设备过载容量的不同",{"key":28,"text":387,"correct":22},"设备计算容量的不同",{"key":31,"text":389,"correct":26},"用电设备总容量的不同",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},1136063,"临时用电施工组织设计应由电气技术人员编制，（）审核，经主管部门批准后实施。",[394,396,398,400],{"key":20,"text":395,"correct":22},"电气工程师",{"key":24,"text":397,"correct":26},"项目技术负责人",{"key":28,"text":399,"correct":22},"项目经理",{"key":31,"text":401,"correct":22},"监理工程师",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":28,"analysis":33},1136064,"施工单位在使用自备电源前应告知并征得供电部门同意后采取安全技术措施，防止自备电源（）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"发生停电故障",{"key":24,"text":409,"correct":22},"遭到外力破坏",{"key":28,"text":411,"correct":26},"误入市政电网",{"key":31,"text":413,"correct":22},"发生用电火灾",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1136065,"建设工程申请新装用电、临时用电、增加用电容量、变更用电和（），应当依照规定的程序办理手续。",[418,420,422,424],{"key":20,"text":419,"correct":22},"照明用电",{"key":24,"text":421,"correct":22},"生活用电",{"key":28,"text":423,"correct":22},"办公用电",{"key":31,"text":425,"correct":26},"终止用电",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1136066,"电力线路保护区为两侧水平延伸距离各0.75m的敷设电缆是（）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"架空线路",{"key":24,"text":433,"correct":22},"海底电缆",{"key":28,"text":435,"correct":26},"地下电缆",{"key":31,"text":437,"correct":22},"江河电缆",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},1136067,"下列用户的安全用电事故，不属于向供电部门报告的是（）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"专线掉闸事故",{"key":24,"text":445,"correct":22},"电气火灾事故",{"key":28,"text":447,"correct":22},"电力系统停电事故",{"key":31,"text":449,"correct":26},"触电重伤事故",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1136068,"110kV的架空电力线路的导线边缘向外侧延伸的距离为（）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"5m",{"key":24,"text":457,"correct":26},"10m",{"key":28,"text":459,"correct":22},"15m",{"key":31,"text":461,"correct":22},"20m",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1136069,"用电计量装置的量值指示是电费结算的主要依据，依照有关法规规定该装置属于强制检定范畴，由（）计量行政主管部门依法授权的检定机构进行检定合格，方为有效。",[466,468,470,472],{"key":20,"text":467,"correct":22},"县级",{"key":24,"text":469,"correct":22},"市级",{"key":28,"text":471,"correct":26},"省级",{"key":31,"text":473,"correct":22},"国家",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":31,"analysis":33},1136070,"用电计量装置原则上应安装在供电设施的（）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"供电侧",{"key":24,"text":481,"correct":22},"用户侧",{"key":28,"text":483,"correct":22},"设备侧",{"key":31,"text":485,"correct":26},"产权分界处",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1136071,"临时用电的用户，对不具备安装计量装置条件的，可按其（）计收电费。",[490,492,494,496],{"key":20,"text":491,"correct":22},"用电容量、使用时间、市场电价",{"key":24,"text":493,"correct":26},"用电容量、使用时间、规定电价",{"key":28,"text":495,"correct":22},"最大容量、工作时间、规定电价",{"key":31,"text":497,"correct":22},"用电容量、工作时间、市场电价",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1136072,"供电企业在新装、换装及现场检验后应对用电计量装置（）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"送电",{"key":24,"text":505,"correct":22},"启封",{"key":28,"text":507,"correct":22},"计量",{"key":31,"text":509,"correct":26},"加封",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},1136073,"对30KV及以上电压供电用户,应有专用的专用的电流互感器二次线圈和电压互感器的（）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"附件",{"key":24,"text":517,"correct":26},"二次连接线",{"key":28,"text":519,"correct":22},"接线端",{"key":31,"text":521,"correct":22},"接地线",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1136074,"下列内容中，属于用户用电申请内容的是（）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"用电地点",{"key":24,"text":529,"correct":22},"用电设备清单",{"key":28,"text":531,"correct":22},"用电规划",{"key":31,"text":533,"correct":26},"供电条件勘查",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},1136075,"供电企业在新装用电计量装置后应对其及时（）。",[538,539,540,541],{"key":20,"text":503,"correct":22},{"key":24,"text":505,"correct":22},{"key":28,"text":507,"correct":22},{"key":31,"text":509,"correct":26},{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":31,"analysis":33},1136076,"关于不同电压等级建设项目对电能计量装置的要求，正确的是（）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"10kV电压的用户应配置共用的电能计量柜",{"key":24,"text":549,"correct":22},"电流互感器二次线圈的保护和测量回路共用",{"key":28,"text":551,"correct":22},"电压互感器二次线圈的保护和测量回路共用",{"key":31,"text":553,"correct":26},"电压互感器专用回路电压降不得超过允许值",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":31,"analysis":33},1136078,"电压在500kV的架空电力线路保护区是指导线边缘向外侧延伸的距离为（）。",[558,559,560,561],{"key":20,"text":455,"correct":22},{"key":24,"text":457,"correct":22},{"key":28,"text":459,"correct":22},{"key":31,"text":461,"correct":26},{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1136079,"下列条件中，不是特种设备的制造、安装、改造单位应当具备的条件是（）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"与生产相适应的设备、设施和工作场所",{"key":24,"text":569,"correct":26},"资金和业绩",{"key":28,"text":571,"correct":22},"专业技术人员",{"key":31,"text":573,"correct":22},"健全的质量保证、安全管理和岗位责任等制度",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},1136080,"特种设备制造和安装、改造、重大修理过程监督检验的主体是（）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"特种设备检验检测机构",{"key":24,"text":581,"correct":22},"当地建设行政主管部门",{"key":28,"text":583,"correct":22},"当地负责特种设备安全监督管理的部门",{"key":31,"text":585,"correct":22},"建设单位质量监督管理机构",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},1136081,"电梯的安装，改造，维修活动结束后，（）应当按安全技术规范的要求对电梯进行校验和调试，并对校验和调试结果负责",[590,592,594,595],{"key":20,"text":591,"correct":22},"设计单位",{"key":24,"text":593,"correct":22},"安装单位",{"key":28,"text":295,"correct":22},{"key":31,"text":596,"correct":26},"制造单位",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":31,"analysis":33},1136082,"供用电协议（合同）应当具备的内容不包括（）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"供电质量和供电时间",{"key":24,"text":604,"correct":22},"用电容量和用电地址",{"key":28,"text":606,"correct":22},"电价、电费结算方式",{"key":31,"text":608,"correct":26},"材料、设备供应情况",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]