[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,13,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,200,212,224,236,248,260,270,282,294,306,318,330,342,354,366,378,390,401,409,421,433,445,457,469,481,493,505,517,527,539,551,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1135930,1,"单选题","试运行的技术准备工作不包括（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","确认可以试运行的条件",false,{"key":24,"text":25,"correct":22},"B","编制试运行总体计划",{"key":27,"text":28,"correct":22},"C","确定试运行合格评价标准",{"key":30,"text":31,"correct":32},"D","编制试运行物资需要量计划",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},1135931,"机电工程项目的特点不包括（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"设计的多样性",{"key":24,"text":41,"correct":22},"环境条件的苛刻性",{"key":27,"text":43,"correct":22},"工程运行的危险性",{"key":30,"text":45,"correct":32},"政策条件的便利性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1135932,"机电工程项目试运行准备工作有（）等方面。",[50,52,54,56],{"key":20,"text":51,"correct":22},"工程采购、组织准备、物资准备",{"key":24,"text":53,"correct":22},"技术准备、工程采购、物资准备",{"key":27,"text":55,"correct":22},"技术准备、组织准备、工程采购",{"key":30,"text":57,"correct":32},"技术准备、组织准备、物资准备",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1135933,"电子招标投标在截止投标时间前可解密提取投标文件的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"招标投标监督部门",{"key":24,"text":65,"correct":22},"招标办公室",{"key":27,"text":67,"correct":22},"招标人",{"key":30,"text":69,"correct":32},"投标人",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1135934,"招投标的分类中，承包商承担工程的设计及土建安装施工，并承担投产运行后设计指标的实现及施工质量的责任的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"设计和采购总承包",{"key":24,"text":77,"correct":32},"设计施工总承包",{"key":27,"text":79,"correct":22},"采购及施工总承包",{"key":30,"text":81,"correct":22},"施工总承包",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1135935,"开标时，有效标书不得少于（）家，否则，此次招标无效。",[86,88,90,92],{"key":20,"text":87,"correct":22},"6",{"key":24,"text":89,"correct":22},"4",{"key":27,"text":91,"correct":32},"3",{"key":30,"text":93,"correct":22},"2",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1135936,"在投标时，不属于商务报价分析的内容是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"认真研究招标文件，核实工程量清单",{"key":24,"text":101,"correct":32},"认真填写报价和密封商务标书",{"key":27,"text":103,"correct":22},"认真评估自身的能力和市场走势",{"key":30,"text":105,"correct":22},"认真分析和考虑工程的风险因素",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1135937,"下列情形应采用公开招标的条件是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"技术复杂、有特殊要求或者受自然环境限制，只有少量潜在投标人可供选择",{"key":24,"text":113,"correct":22},"涉及国家安全、国家秘密或者抢险救灾，不宜公开招标的",{"key":27,"text":115,"correct":22},"采用公开招标方式的费用占项目合同金额的比例过大",{"key":30,"text":117,"correct":32},"国有资金占控股或者主导地位的依法必须进行招标的项目",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1135938,"机电工程项目施工招标投标管理中，下列关于标底的说法，错误的是（??）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"招标人设有最高投标限价的，应当在招标文件中明确最高限价或者最高限价的计算方法",{"key":24,"text":125,"correct":32},"标底必须公开",{"key":27,"text":127,"correct":22},"一个招标项目只能有一个标底",{"key":30,"text":129,"correct":22},"招标人可以自行决定是否编制标底",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1135939,"分包方工作中的停检点应在（）合格的前提下，由总包方检查合格后，总包方报请监理（业主代表）进行检查。",[134,136,138,140],{"key":20,"text":135,"correct":32},"自检",{"key":24,"text":137,"correct":22},"交检",{"key":27,"text":139,"correct":22},"互检",{"key":30,"text":141,"correct":22},"分检",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1135940,"分包工程的预验收应由（）负责组织。",[146,148,150,152],{"key":20,"text":147,"correct":22},"分包单位",{"key":24,"text":149,"correct":32},"总包单位",{"key":27,"text":151,"correct":22},"监理单位",{"key":30,"text":153,"correct":22},"建设单位",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1135941,"关于专业工程分包人的责任和义务的说法,正确的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":32},"分包人须服从承包人转发的发包人下达的与分包工程有关的指令",{"key":24,"text":161,"correct":22},"分包人应履行并承担总包合同中承包人的所有义务和责任",{"key":27,"text":163,"correct":22},"特殊情况下,分包人可不经承包人允许,直接与监理工程师发生工作联系",{"key":30,"text":165,"correct":22},"分包人须服从业主以及监理工程师直接下达的与分包工程有关的指令",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1135942,"关于施工合同中承包人项目经理的说法,正确的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"项目经理经承包人授权后代表承包人负责履行合同,不须发包人确认",{"key":24,"text":173,"correct":22},"发包人要求更换承包人项目经理,由此增加的费用由发包人承担",{"key":27,"text":175,"correct":32},"承包人项目经理不得同时担任其他项目的项目经理",{"key":30,"text":177,"correct":22},"承包人项目经理事先通知发包人,可离开施工现场",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1135943,"机电工程施工合同风险主要表现形式不包括（）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"合同主体不合格",{"key":24,"text":185,"correct":22},"合同订立或招标投标过程违反建设工程的法定程序",{"key":27,"text":187,"correct":22},"业主指定分包单位或材料供应商",{"key":30,"text":189,"correct":32},"合同条款完备",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1135944,"项目的设备施工现场验收应由（）组织。",[194,196,197,198],{"key":20,"text":195,"correct":22},"安装单位",{"key":24,"text":151,"correct":22},{"key":27,"text":153,"correct":32},{"key":30,"text":199,"correct":22},"生产厂商",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1135945,"设备采购收尾阶段的工作不包括（）。",[204,206,208,210],{"key":20,"text":205,"correct":32},"包装运输",{"key":24,"text":207,"correct":22},"货物交接",{"key":27,"text":209,"correct":22},"材料处理",{"key":30,"text":211,"correct":22},"资料归档",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":30,"analysis":33},1135946,"设备采购工作中，准备阶段主要工作不包括（）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"建立组织",{"key":24,"text":219,"correct":22},"需求分析",{"key":27,"text":221,"correct":22},"熟悉市场",{"key":30,"text":223,"correct":32},"接收请购文件",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":30,"analysis":33},1135947,"进口设备施工现场验收程序正确的是（）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"报关→商检→通关→验收",{"key":24,"text":231,"correct":22},"通关→报关→验收→商检",{"key":27,"text":233,"correct":22},"商检→报关→验收→通关",{"key":30,"text":235,"correct":32},"报关→通关→商检→验收",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},1135948,"下列设备监造大纲内容错误的是（）。",[240,242,244,246],{"key":20,"text":241,"correct":32},"签订设备采购合同",{"key":24,"text":243,"correct":22},"制定计划及控制措施",{"key":27,"text":245,"correct":22},"明确技术和验收要求",{"key":30,"text":247,"correct":22},"明确相应技术人员",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":24,"analysis":33},1135949,"下列设备验收的内容中,不属于外观检查的是（）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"管缆布置",{"key":24,"text":255,"correct":32},"润滑油脂",{"key":27,"text":257,"correct":22},"加工表面",{"key":30,"text":259,"correct":22},"涂漆",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1135950,"根据设备采购工作阶段划分,属于收尾阶段工作的是（）。",[264,265,266,268],{"key":20,"text":207,"correct":32},{"key":24,"text":205,"correct":22},{"key":27,"text":267,"correct":22},"检验",{"key":30,"text":269,"correct":22},"催交",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},1135951,"设备监造月报的内容不包括（）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"设备质量检查内容",{"key":24,"text":277,"correct":22},"监造人",{"key":27,"text":279,"correct":32},"费用情况",{"key":30,"text":281,"correct":22},"进度情况",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":30,"analysis":33},1135952,"设备验收的主要依据不包括（）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"设备采购合同",{"key":24,"text":289,"correct":22},"国家标准法规",{"key":27,"text":291,"correct":22},"监造大纲",{"key":30,"text":293,"correct":32},"设备采购评审",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},1135953,"施工总承包单位将施工用起重机械分包给专业安装公司安装拆卸，其专项工程施工方案由（）组织编制。",[298,300,302,304],{"key":20,"text":299,"correct":22},"施工总承包单位",{"key":24,"text":301,"correct":22},"设备制造单位",{"key":27,"text":303,"correct":32},"专业安装公司",{"key":30,"text":305,"correct":22},"设备监理公司",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},1135954,"对整个项目的施工全过程起统筹规划和重点控制作用的是（）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"单位工程施工组织设计",{"key":24,"text":313,"correct":22},"施工方案",{"key":27,"text":315,"correct":32},"施工组织总设计",{"key":30,"text":317,"correct":22},"技术措施",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":30,"analysis":33},1135955,"不需要专家论证的安装专项施工方案，应由（）审核签字后实施。",[322,324,326,328],{"key":20,"text":323,"correct":22},"建设单位项目负责人",{"key":24,"text":325,"correct":22},"总承包单位技术负载人",{"key":27,"text":327,"correct":22},"施工单位技术负责人",{"key":30,"text":329,"correct":32},"总监理工程师",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},1135956,"施工方案经济评价的常用方法是（）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"价值工程法",{"key":24,"text":337,"correct":22},"等值成本法",{"key":27,"text":339,"correct":32},"综合评价法",{"key":30,"text":341,"correct":22},"单位成本比较法",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},1135957,"专项工程施工组织设计的编制对象正确的是（）。",[346,348,350,352],{"key":20,"text":347,"correct":32},"质量要求高的分部工程",{"key":24,"text":349,"correct":22},"工艺复杂的关键工序",{"key":27,"text":351,"correct":22},"多个单位工程组成的单项工程",{"key":30,"text":353,"correct":22},"单位或子单位工程",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1135958,"下列不属于工程文件的是（）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"施工图纸",{"key":24,"text":361,"correct":32},"标准规范",{"key":27,"text":363,"correct":22},"技术协议",{"key":30,"text":365,"correct":22},"会议纪要",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},1135959,"下列施工交底内容中，属于施工方案交底的是（）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"质量、安全、进度目标",{"key":24,"text":373,"correct":22},"工程的重点和难点",{"key":27,"text":375,"correct":32},"操作方法、要领",{"key":30,"text":377,"correct":22},"主要施工工艺及施工方法",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1135960,"下列内容，不属于施工组织设计编制的内容是（）。",[382,384,386,388],{"key":20,"text":383,"correct":32},"施工图深化设计",{"key":24,"text":385,"correct":22},"施工平面图布置",{"key":27,"text":387,"correct":22},"主要的施工方法",{"key":30,"text":389,"correct":22},"项目组织管理机构形式",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1135961,"当机电工程有施工总承包单位时，施工总平面管理由（）负责。",[394,396,397,399],{"key":20,"text":395,"correct":32},"总承包单位",{"key":24,"text":153,"correct":22},{"key":27,"text":398,"correct":22},"设计单位",{"key":30,"text":400,"correct":22},"某主体工程分包单位",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1135962,"某实施工程总承包的工程项目，施工总平面管理的主责单位是（）。",[405,406,407,408],{"key":20,"text":395,"correct":32},{"key":24,"text":153,"correct":22},{"key":27,"text":147,"correct":22},{"key":30,"text":151,"correct":22},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},1135963,"施工中发生以下变化，不需要重新编制或修订施工组织设计的是（）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"重大设计修改",{"key":24,"text":416,"correct":22},"施工方法重大调整",{"key":27,"text":418,"correct":32},"项目技术负责人变更",{"key":30,"text":420,"correct":22},"主要施工机械重大调整",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1135964,"项目部提出变更申请,经现场设计、建设（监理）单位代表签字同意后生效的是（）。",[425,427,429,431],{"key":20,"text":426,"correct":32},"小型设计变更",{"key":24,"text":428,"correct":22},"一般设计变更",{"key":27,"text":430,"correct":22},"重大设计变更",{"key":30,"text":432,"correct":22},"特大设计变更",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},1135965,"工程建设工法按级别分类错误的是（）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"国家级",{"key":24,"text":440,"correct":22},"省（部）级",{"key":27,"text":442,"correct":32},"县市级",{"key":30,"text":444,"correct":22},"企业级",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},1135966,"材料管理ABC分类法的内容不包括（）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"计算项目各种材料所占用的资金总量",{"key":24,"text":452,"correct":22},"根据各种材料占用资金的多少，从大到小按顺序排列",{"key":27,"text":454,"correct":32},"确定材料的经济和安全存储量",{"key":30,"text":456,"correct":22},"计算各种材料的累计数及累计百分比",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},1135967,"下列关于人力资源需求定性分析的方法中，不正确的是（）。",[461,463,465,467],{"key":20,"text":462,"correct":22},"现状规划法",{"key":24,"text":464,"correct":32},"专业平衡法",{"key":27,"text":466,"correct":22},"经验预测法",{"key":30,"text":468,"correct":22},"分合性预测法",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":30,"analysis":33},1135968,"从事受监察设备焊接工作的焊工,必须重新考试的是中断监察设备焊接工作（）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"1个月",{"key":24,"text":476,"correct":22},"3个月",{"key":27,"text":478,"correct":22},"5个月",{"key":30,"text":480,"correct":32},"6个月",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":27,"analysis":33},1135969,"下列关于无损检测人员要求的说法,正确的是（）。",[485,487,489,491],{"key":20,"text":486,"correct":22},"Ⅰ级人员可评定检测结果",{"key":24,"text":488,"correct":22},"Ⅱ级人员可审核检测报告",{"key":27,"text":490,"correct":32},"Ⅲ级人员可编制无损检测工艺",{"key":30,"text":492,"correct":22},"持证人员的资格证书有效期以企业上级部门规定为准",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},1135970,"金属圆形螺旋风管制安技术不宜用于（）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"空调送风管道",{"key":24,"text":500,"correct":32},"压缩空气管道",{"key":27,"text":502,"correct":22},"进风管道",{"key":30,"text":504,"correct":22},"防排烟系统",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1135971,"机电工程项目部对工程分承包单位协调管理的重点内容不包括（）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"质量安全制度制定",{"key":24,"text":512,"correct":32},"作业计划的安排",{"key":27,"text":514,"correct":22},"甲供物资分配",{"key":30,"text":516,"correct":22},"资金使用调拨",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":27,"analysis":33},1135972,"施工单位项目部与有合同契约关系的单位间协调包括（）。",[521,522,523,525],{"key":20,"text":398,"correct":22},{"key":24,"text":151,"correct":22},{"key":27,"text":524,"correct":32},"材料供应单位",{"key":30,"text":526,"correct":22},"质量监督单位",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1135973,"施工现场内部协调中，与施工作业面安排的协调包括（）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"钢储罐组装",{"key":24,"text":534,"correct":32},"氧乙炔装置",{"key":27,"text":536,"correct":22},"焊后无损检测",{"key":30,"text":538,"correct":22},"管道涂装防腐",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},1135974,"质量管理协调主要作用于质量检查、检验计划与（）要求的一致性。",[543,545,547,549],{"key":20,"text":544,"correct":32},"施工进度计划",{"key":24,"text":546,"correct":22},"工程实体现状",{"key":27,"text":548,"correct":22},"安装工艺规律",{"key":30,"text":550,"correct":22},"作业人员配备",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":30,"analysis":33},1135975,"机电工程内部协调管理中，关于施工安全管理协调作用的表述，错误的是（）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"作用于全场安全检查计划中部位和顺序的安排",{"key":24,"text":558,"correct":22},"作用于各专业施工用公用安全设施的设立、使用和维修",{"key":27,"text":560,"correct":22},"作用于各专业在同一场所施工时对因作业可能危害他人安全而采取防护措施的设定及实施",{"key":30,"text":562,"correct":32},"作用于质量检查、检验计划编制与施工进度计划要求的一致性",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":20,"analysis":33},1135976,"机电工程采用横道图表示施工进度计划的优点是（）。",[567,569,571,573],{"key":20,"text":568,"correct":32},"便于计算劳动力的需要量",{"key":24,"text":570,"correct":22},"能反映工作的机动时间",{"key":27,"text":572,"correct":22},"能反映影响工期的关键工作",{"key":30,"text":574,"correct":22},"能表达各项工作之间的逻辑关系",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":27,"analysis":33},1135977,"关于赢得值法评价指标的说法,正确的是（）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"当费用偏差（CV）为负值时,表示实际费用小于预算费用",{"key":24,"text":582,"correct":22},"当进度偏差（SV）为正值时,表示实际进度落后计划进度",{"key":27,"text":584,"correct":32},"当费用绩效指数CPI\u003C1时,表示实际费用高于预算费用",{"key":30,"text":586,"correct":22},"当进度绩效指数SPI\u003C1时,表示实际进度超前计划进度",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},1135978,"赢得值参数比较中，施工进度提前、费用节支的是（）。",[591,593,595,597],{"key":20,"text":592,"correct":32},"CV>0，SV>0",{"key":24,"text":594,"correct":22},"CV\u003C0，SV\u003C0",{"key":27,"text":596,"correct":22},"CV>0，SV\u003C0",{"key":30,"text":598,"correct":22},"CV＜0，SV>0",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":24,"analysis":33},1135979,"下列措施中,属于机电工程施工进度控制技术措施的是（）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"建立控制目标体系",{"key":24,"text":606,"correct":32},"施工方案优化",{"key":27,"text":608,"correct":22},"拖工激励措施",{"key":30,"text":610,"correct":22},"进度统计与比较",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]