[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-797-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},797,"一建机电工程实务","建筑工程",0,10,50,2021,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,247,259,271,283,295,307,319,331,343,354,366,378,390,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1135779,1,"单选题","固定顶的稳定性试验采用充水到设计最高液位，封闭开孔后用（）的方法进行，罐顶无异常变形为合格。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","稳压",false,{"key":24,"text":25,"correct":22},"B","保持液位不变",{"key":27,"text":28,"correct":29},"C","放水",true,{"key":31,"text":32,"correct":22},"D","加压","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1135780,"关于钢结构的下列说法中，错误的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"钢结构是由型钢、钢板、钢管等制成的钢构件组成的工程结构",{"key":24,"text":41,"correct":29},"钢结构构件难于采用工厂化的制造方式，一般均在施工现场制作",{"key":27,"text":43,"correct":22},"钢结构构件之间用焊缝、螺栓或铆钉连接",{"key":31,"text":45,"correct":22},"工业机电工程的多层框架、管架是钢结构运用的实例",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1135781,"钢结构安装施工中，已安装的框架结构应具有（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"下挠度",{"key":24,"text":53,"correct":22},"外加支撑稳固",{"key":27,"text":55,"correct":29},"空间刚度",{"key":31,"text":57,"correct":22},"遮盖设施",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1135782,"钢结构制作和安装单位应按规定分别进行高强度螺栓连接摩擦面的（）试验和复验，其结果应符合设计要求。",[62,64,66,68],{"key":20,"text":63,"correct":22},"扭矩系数",{"key":24,"text":65,"correct":22},"紧固轴力",{"key":27,"text":67,"correct":22},"弯矩系数",{"key":31,"text":69,"correct":29},"抗滑移系数",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1135783,"外浮顶储罐的优点是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"罐体稳定性好",{"key":24,"text":77,"correct":22},"方便施工作业",{"key":27,"text":79,"correct":22},"便于观测罐内油面",{"key":31,"text":81,"correct":29},"可减少或防止罐内液体蒸发损失",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1135784,"充水试验的相关规定指出，对于不锈钢罐，试验用水中氯离子含量不得超过25ppm。试验水温均不低于（）℃。",[86,88,90,92],{"key":20,"text":87,"correct":22},"3",{"key":24,"text":89,"correct":29},"5",{"key":27,"text":91,"correct":22},"7",{"key":31,"text":93,"correct":22},"8",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1135785,"金属储罐安装方法中，适用于大型浮顶罐的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"倒装法",{"key":24,"text":101,"correct":29},"正装法",{"key":27,"text":103,"correct":22},"气顶法",{"key":31,"text":105,"correct":22},"散装法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1135786,"金属储罐的罐壁作强度和严密性试验时，充水到设计最高液位并保持（）h后，罐壁无渗漏、无异常变形定为合格。",[110,112,114,116],{"key":20,"text":111,"correct":22},"32",{"key":24,"text":113,"correct":29},"48",{"key":27,"text":115,"correct":22},"36",{"key":31,"text":117,"correct":22},"12",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1135787,"分两段到货塔器采用正装法，下列工艺顺序正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"吊装下段、找正→基础验收、设置垫铁→吊装上段、找正→组焊段间环焊缝→整体找正",{"key":24,"text":125,"correct":29},"基础验收、设置垫铁→吊装下段、找正→组焊段间环焊缝→整体找正",{"key":27,"text":127,"correct":22},"基础验收、设置垫铁→吊装上段、找正→吊装下段、找正→组焊段间环焊缝→整体找正",{"key":31,"text":129,"correct":22},"下段吊装、找正→吊装上段、找正→组焊段间环焊缝→基础验收、设置垫铁→整体找正",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1135788,"钢结构安装程序中，钢柱安装的紧后工序是（）。",[134,136,138,140],{"key":20,"text":135,"correct":29},"支撑安装",{"key":24,"text":137,"correct":22},"梁安装",{"key":27,"text":139,"correct":22},"平台板",{"key":31,"text":141,"correct":22},"钢梯",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1135789,"发电机转子穿装工作，必须在完成机务、电气与热工仪表的各项工作后，会同有关人员对定子和转子进行最后清扫检查，确信其内部清洁，无任何杂物并（）后方可进行。",[146,148,150,152],{"key":20,"text":147,"correct":22},"项目经理同意",{"key":24,"text":149,"correct":22},"项目总工同意",{"key":27,"text":151,"correct":22},"制造商认可",{"key":31,"text":153,"correct":29},"经签证",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1135790,"在轴系对轮中心找正时，一般先要以（）为基准，并且通常都以全实缸、凝汽器灌水至模拟运行状态进行调整。",[158,160,162,164],{"key":20,"text":159,"correct":29},"低压转子",{"key":24,"text":161,"correct":22},"中压转子",{"key":27,"text":163,"correct":22},"高压转子",{"key":31,"text":165,"correct":22},"电转子",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1135791,"按工作原理划分，汽轮机可以分为（）汽轮机。",[170,172,174,176],{"key":20,"text":171,"correct":22},"抽气式",{"key":24,"text":173,"correct":22},"轴流式",{"key":27,"text":175,"correct":22},"凝汽式",{"key":31,"text":177,"correct":29},"冲动式",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1135792,"旋转磁极式发电机转子并不由（）组成。",[182,184,186,188],{"key":20,"text":183,"correct":22},"转子锻件",{"key":24,"text":185,"correct":29},"端盖",{"key":27,"text":187,"correct":22},"励磁绕组",{"key":31,"text":189,"correct":22},"风扇",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1135793,"锅炉受热面施工形式是根据（）等来决定的。",[194,196,198,200],{"key":20,"text":195,"correct":22},"组合后体积",{"key":24,"text":197,"correct":22},"组合后重量",{"key":27,"text":199,"correct":29},"施工条件",{"key":31,"text":201,"correct":22},"劳动强度",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1135794,"发电机转子穿装，专用工具由制造厂配套供应，一般采用（）方法。",[206,208,210,212],{"key":20,"text":207,"correct":22},"液压提升装置",{"key":24,"text":209,"correct":29},"滑道式",{"key":27,"text":211,"correct":22},"液压顶升平移",{"key":31,"text":213,"correct":22},"专用吊装架",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1135795,"发电机转子穿装前应进行单独（）试验,试验压力和允许漏气量应符合制造厂规定。",[218,220,222,224],{"key":20,"text":219,"correct":22},"通气",{"key":24,"text":221,"correct":22},"真空",{"key":27,"text":223,"correct":22},"气压",{"key":31,"text":225,"correct":29},"气密性",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},1135796,"发电机设备安装程序中，定、转子水压试验的紧后工序是（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"定子就位",{"key":24,"text":233,"correct":22},"氢冷器安装",{"key":27,"text":235,"correct":29},"穿转子",{"key":31,"text":237,"correct":22},"整体气密性试验",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1135797,"大型汽轮发电机组轴系对轮中心找正时，应以（）为基准。",[242,243,244,245],{"key":20,"text":161,"correct":22},{"key":24,"text":159,"correct":29},{"key":27,"text":163,"correct":22},{"key":31,"text":246,"correct":22},"电机转子",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},1135798,"1000MW发电机定子重量可达400t以上，卸车方式主要采用（）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"行车抬吊卸车",{"key":24,"text":254,"correct":22},"桅杆抬吊卸车",{"key":27,"text":256,"correct":29},"液压提升装置卸车",{"key":31,"text":258,"correct":22},"卷扬机提升卸车",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1135799,"电站锅炉辅助设备是指（）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"水冷壁",{"key":24,"text":266,"correct":22},"省煤器",{"key":27,"text":268,"correct":22},"空气预热器",{"key":31,"text":270,"correct":29},"吹灰设备",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":27,"analysis":33},1135800,"锅炉受热面安装程序中，“通球试验与清理”的紧前工序是（）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"设备清点检查",{"key":24,"text":278,"correct":22},"联箱找正划线",{"key":27,"text":280,"correct":29},"合金部件光谱复查",{"key":31,"text":282,"correct":22},"管子对口焊接",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":20,"analysis":33},1135801,"低压内缸组合安装正确的过程是（）。",[287,289,291,293],{"key":20,"text":288,"correct":29},"低压内缸就位找正，隔板调整，转子吊入汽缸并定位，通流间隙调整",{"key":24,"text":290,"correct":22},"隔板调整，低压内缸就位找正，转子吊入汽缸并定位，通流间隙调整",{"key":27,"text":292,"correct":22},"低压内缸就位找正，转子吊入汽缸并定位，隔板调整，通流间隙调整",{"key":31,"text":294,"correct":22},"低压内缸就位找正，隔板调整，通流间隙调整，转子吊入汽缸并定位",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":27,"analysis":33},1135802,"锅炉受热面组件吊装的一般原则是（）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"先下后上，先两侧后中间",{"key":24,"text":302,"correct":22},"先上后下，先中间后两侧",{"key":27,"text":304,"correct":29},"先上后下，先两侧后中间",{"key":31,"text":306,"correct":22},"先下后上，先中间后两侧",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":27,"analysis":33},1135803,"低压外上缸组合安装正确的过程是（）。",[311,313,315,317],{"key":20,"text":312,"correct":22},"先检查水平、垂直结合面间隙，试组合，密封焊接，正式组合",{"key":24,"text":314,"correct":22},"先试组合，以检查水平、垂直结合面间隙，密封焊接，正式组合",{"key":27,"text":316,"correct":29},"先试组合，以检查水平、垂直结合面间隙，符合要求后正式组合",{"key":31,"text":318,"correct":22},"先检查水平、垂直结合面间隙，试组合，正式组合",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},1135804,"不是蒸汽管路冲洗吹洗的对象是（）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"过热器",{"key":24,"text":326,"correct":22},"过热蒸汽管道",{"key":27,"text":328,"correct":22},"再热器",{"key":31,"text":330,"correct":29},"蒸发受热面",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},1135805,"发电机设备的正确安装程序应为（）。",[335,337,339,341],{"key":20,"text":336,"correct":29},"定子就位→定子及转子水压试验→发电机穿转子→氢冷器安装→端盖、轴承、密封瓦调整安装→励磁机安装→对轮复找中心并连接→整体气密性试验",{"key":24,"text":338,"correct":22},"定子就位→定子及转子水压试验→发电机穿转子→氢冷器安装→励磁机安装→端盖、轴承、密封瓦调整安装→对轮复找中心并连接→整体气密性试验",{"key":27,"text":340,"correct":22},"定子就位→发电机穿转子→定子及转子水压试验→端盖、轴承、密封瓦调整安装→氢冷器安装→对轮复找中心并连接→励磁机安装一整体气密性试验",{"key":31,"text":342,"correct":22},"定子就位→发电机穿转子→定子及转子水压试验→氢冷器安装→端盖、轴承、密封瓦调整安装→励磁机安装→发电机穿转子→对轮复找中心并连接→整体气密性试验",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":31,"analysis":33},1135806,"电站锅炉，蒸发受热面及炉前系统在启动前必须进行化学清洗。化学清洗结束至锅炉启动时间不应超过（）d。",[347,348,350,352],{"key":20,"text":89,"correct":22},{"key":24,"text":349,"correct":22},"10",{"key":27,"text":351,"correct":22},"15",{"key":31,"text":353,"correct":29},"20",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},1135807,"电站汽轮机的组成部分不包括（）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"汽轮机本体",{"key":24,"text":361,"correct":22},"蒸汽系统设备",{"key":27,"text":363,"correct":22},"凝结水系统设备",{"key":31,"text":365,"correct":29},"送引风设备",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":27,"analysis":33},1135808,"大型汽轮机低压外下缸体前段和后段组合找中心时，不可作为基准的是（）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"激光",{"key":24,"text":373,"correct":22},"拉钢丝",{"key":27,"text":375,"correct":29},"吊线坠",{"key":31,"text":377,"correct":22},"假轴",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1135809,"下列系统中，不属于直驱式风力发电机组组成系统的是（）。",[382,384,386,388],{"key":20,"text":383,"correct":29},"变速系统",{"key":24,"text":385,"correct":22},"控制系统",{"key":27,"text":387,"correct":22},"测风系统",{"key":31,"text":389,"correct":22},"防雷系统",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1135810,"发电机设备的安装程序中，定子就位的紧后工序是（）。",[394,396,397,399],{"key":20,"text":395,"correct":29},"定、转子水压试验",{"key":24,"text":235,"correct":22},{"key":27,"text":398,"correct":22},"氢冷气安装",{"key":31,"text":237,"correct":22},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},1135811,"光伏发电设备中，不使用的支架是（）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"固定支架",{"key":24,"text":407,"correct":29},"滑动支架",{"key":27,"text":409,"correct":22},"跟踪支架",{"key":31,"text":411,"correct":22},"可调支架",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":20,"analysis":33},1135812,"风力发电机组塔筒就位紧固后，可用于塔筒内侧法兰缝隙填充的垫片材料是（）。",[416,418,420,422],{"key":20,"text":417,"correct":29},"不锈钢",{"key":24,"text":419,"correct":22},"紫铜",{"key":27,"text":421,"correct":22},"青壳纸",{"key":31,"text":423,"correct":22},"合金钢",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},1135813,"涡轮流量计的信号线采用的线缆是（）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"塑铜线",{"key":24,"text":431,"correct":29},"屏蔽线",{"key":27,"text":433,"correct":22},"控制电缆",{"key":31,"text":435,"correct":22},"裸铜线",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},1135814,"直接安装在管道上的仪表，宜在管道吹扫后（）前安装。",[440,442,444,446],{"key":20,"text":441,"correct":22},"密封试验",{"key":24,"text":443,"correct":29},"压力试验",{"key":27,"text":445,"correct":22},"泄漏性试验",{"key":31,"text":447,"correct":22},"回路试验",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},1135815,"自动化仪表线路安装中，线路的终端接线处及经过建筑物的（）处应留有余度。",[452,454,456,458],{"key":20,"text":453,"correct":29},"伸缩缝和沉降缝",{"key":24,"text":455,"correct":22},"直缝和沉降缝",{"key":27,"text":457,"correct":22},"搭缝和伸缩缝",{"key":31,"text":459,"correct":22},"膨胀缝和直缝",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},1135816,"下列仪表管道的弯曲半径，错误的是（）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"高压钢管的弯曲半径宜大于管子外径的5倍",{"key":24,"text":467,"correct":29},"不锈钢管的弯曲半径宜大于管子外径的3倍",{"key":27,"text":469,"correct":22},"紫铜管的弯曲半径宜大于管子外径的3.5倍",{"key":31,"text":471,"correct":22},"塑料管的弯曲半径宜大于管子外径的4.5倍",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":31,"analysis":33},1135817,"单台仪表的校准点应在仪表全量程范围内均匀选取，一般不应少于（）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"2点",{"key":24,"text":479,"correct":22},"3点",{"key":27,"text":481,"correct":22},"4点",{"key":31,"text":483,"correct":29},"5点",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1135818,"自动化仪表工程的调试程序是（）。",[488,490,492,494],{"key":20,"text":489,"correct":29},"先部件调试后区域调试",{"key":24,"text":491,"correct":22},"先局部调试后区域调试",{"key":27,"text":493,"correct":22},"先区域调试后回路调试",{"key":31,"text":495,"correct":22},"先系统调试后回路调试",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},1135819,"下列管道上的取源部件安装，错误的是（）。",[500,502,504,506],{"key":20,"text":501,"correct":22},"用机械加工的方法在管道上开孔",{"key":24,"text":503,"correct":29},"取源阀门与管道连接用卡套式接头",{"key":27,"text":505,"correct":22},"不在焊缝及其边缘上开孔和焊接",{"key":31,"text":507,"correct":22},"取源部件与管道同时进行压力试验",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":20,"analysis":33},1135820,"自动化仪表工程中塑料绝缘电缆敷设时的环境温度应不低于（）。",[512,514,516,518],{"key":20,"text":513,"correct":29},"0℃",{"key":24,"text":515,"correct":22},"-5℃",{"key":27,"text":517,"correct":22},"-10℃",{"key":31,"text":519,"correct":22},"-15℃",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":27,"analysis":33},1135821,"负荷传感器的安装应呈（）状态，保证传感器的主轴线与加荷轴线相重合。",[524,526,528,530],{"key":20,"text":525,"correct":22},"平行",{"key":24,"text":527,"correct":22},"水平",{"key":27,"text":529,"correct":29},"垂直",{"key":31,"text":531,"correct":22},"中心",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},1135822,"自动化仪表工程调校用的标准仪表应具备有效的（）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"使用说明书",{"key":24,"text":539,"correct":29},"检定合格证明",{"key":27,"text":541,"correct":22},"使用年限",{"key":31,"text":543,"correct":22},"出厂合格证书",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},1135823,"自动化仪表工程的高压管道上开孔时，应采用（）的方法。",[548,550,552,554],{"key":20,"text":549,"correct":22},"气割加工",{"key":24,"text":551,"correct":29},"机械加工",{"key":27,"text":553,"correct":22},"电弧加工",{"key":31,"text":555,"correct":22},"凿子加工",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},1135824,"单台仪表的校准点在仪表全量程范围内选取时应（）。",[560,562,564,566],{"key":20,"text":561,"correct":22},"自由选取",{"key":24,"text":563,"correct":22},"随机选取",{"key":27,"text":565,"correct":22},"连续选取",{"key":31,"text":567,"correct":29},"均匀选取",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":27,"analysis":33},1135825,"下列管道材质，不能用于气动信号管道的是（）。",[572,574,576,578],{"key":20,"text":573,"correct":22},"不锈钢管",{"key":24,"text":575,"correct":22},"紫铜管",{"key":27,"text":577,"correct":29},"镀锌钢管",{"key":31,"text":579,"correct":22},"尼龙管",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},1135826,"直接安装在管道上的自动化仪表，宜在（）安装。",[584,586,588,590],{"key":20,"text":585,"correct":22},"管道吹扫后、压力试验后",{"key":24,"text":587,"correct":22},"管道吹扫前、压力试验前",{"key":27,"text":589,"correct":22},"管道吹扫前、压力试验后",{"key":31,"text":591,"correct":29},"管道吹扫后、压力试验前",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":27,"analysis":33},1135827,"自动化仪表工程施工中，综合控制系统设备安装前应具备的条件不包括（）。",[596,598,600,602],{"key":20,"text":597,"correct":22},"基础底座安装完毕",{"key":24,"text":599,"correct":22},"地板、顶棚、内墙、门窗施工完毕",{"key":27,"text":601,"correct":29},"综合控制系统的行程试验合格",{"key":31,"text":603,"correct":22},"供电系统及室内照明施工完毕并已投入运行",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":27,"analysis":33},1135828,"自动化仪表的中心距操作地面的高度宜为（）。",[608,610,612,614],{"key":20,"text":609,"correct":22},"0.8～1.0m",{"key":24,"text":611,"correct":22},"1.0～1.2m",{"key":27,"text":613,"correct":29},"1.2～1.5m",{"key":31,"text":615,"correct":22},"1.5～1.8m",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]