[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137374":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137374,797,2,"多选题","（2018年真题）多个施工方案进行经济合理性比较时，其内容包括（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","资金时间价值",true,{"key":16,"text":17,"correct":18},"B","技术效率",false,{"key":20,"text":21,"correct":18},"C","实施的安全性",{"key":23,"text":24,"correct":14},"D","对环境影响的损失",{"key":26,"text":27,"correct":14},"E","综合性价比","ADE","经济合理性比较 1）比较各方案的一次性投资总额。 2）比较各方案的资金时间价值。 3）比较各方案对环境影响的损失。 4）比较各方案总产值中剔除劳动力与资金对产值增长的贡献。 5）比较各方案对工程进度时间及其费用影响的大小。 6）比较各方案综合性价比。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]