[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137352":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137352,797,2,"多选题","（2018年真题）工业管道工程交接验收前，建设单位应检查施工单位的技术文件，其中包括（ ）",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","材料代用单",true,{"key":16,"text":17,"correct":18},"B","安全阀校验报告",false,{"key":20,"text":21,"correct":18},"C","管道元件检查记录",{"key":23,"text":24,"correct":14},"D","管道安装竣工图",{"key":26,"text":27,"correct":14},"E","管道元件复验报告","ADE","本题考查的是工程交接验收技术条件。技术文件包括（1）管道元件的产品合格证、质量证明文 件和复检、试验报告。（2）管道安装竣工图、设计修改文件及材料代用单，（3）无损检测和焊后热处理 的管道，在管道轴测图上准确表明焊接工艺信息。选项 B 属于试验报告，选项 C 属于施工检查记录。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]