[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137256":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137256,797,2,"多选题","下列关于光伏发电设备安装技术要求说法错误的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","光伏组件采用螺栓进行固定",false,{"key":16,"text":17,"correct":14},"B","光伏组件之间的接线在组串后应进行光伏组件串的开路电压和短路电流的测试",{"key":19,"text":20,"correct":21},"C","施工时当接触组串的金属带电部位时应做好绝缘防护",true,{"key":23,"text":24,"correct":21},"D","逆变器本体的预留孔及电缆管口进行密封",{"key":26,"text":27,"correct":14},"E","逆变器基础型钢其顶部应高出抹平地面10mm并有可靠的接地","CD","施工时严禁接触组串的金属带电部位。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]