[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137108":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137108,797,2,"多选题","施工单位项目经理部负责质量验收评定工作的部门包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","安全管理部门",false,{"key":16,"text":17,"correct":18},"B","工程技术部门",true,{"key":20,"text":21,"correct":18},"C","物资管理部门",{"key":23,"text":24,"correct":18},"D","质量部门",{"key":26,"text":27,"correct":18},"E","试验部门","BCDE","2020版教材P476\u002F2019版教材P464-465 2．质量验收评定工作的基础工作在施工单位，施工单位由质量部门、工程技术部门负责此项工作。施工项目由项目经理部工程技术部门（质量部门）、物资管理部门、试验部门及工长、班组长负责此项工作。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]