[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137101":3},{"question":4,"library":25},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":23,"analysis":24},1137101,797,2,"多选题","分部工程划分的原则是按（）来确定。 A.材料类别 B.专业性质 C.施工工艺 D.设备类别",[11,14,16,18,20],{"key":12,"text":12,"correct":13},"A",true,{"key":15,"text":15,"correct":13},"B",{"key":17,"text":17,"correct":13},"C",{"key":19,"text":19,"correct":13},"D",{"key":21,"text":21,"correct":22},"E",false,"ABCD","2020版教材P474\u002F2019版教材P462 2．承包方项目部相关部门在验收过程中的质量责任（1）项目部的质量部门参与对检验批、分项工程、分部（子分部）、单位（子单位）工程验收工作，收集相关的工程验收记录并建立工程质量动态台账。",{"id":6,"name":26,"category":27,"favorite":28},"一建机电工程实务","建筑工程",0]