[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137076":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137076,797,2,"多选题","施工单位安全用电事故报告规定的内容包括（）等。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","人身触电重伤",false,{"key":16,"text":17,"correct":18},"B","专线掉闸",true,{"key":20,"text":21,"correct":18},"C","电气火灾",{"key":23,"text":24,"correct":18},"D","重要电气设备损坏",{"key":26,"text":27,"correct":18},"E","停电期间向电力系统倒送电","BCDE","2020版教材P454 \u002F 2019版教材P442 (二)施工单位安全用电事故报告规定 施工过程中对于出现人身触电死亡；导致电力系统停电；专线掉闸或全厂停电；电气火灾；重要或大型电气设备损坏；停电期间向电力系统倒送电等事故的，施工单位应及时向供电部门报告。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]