[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137035":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137035,797,2,"多选题","成本管理的任务，包括（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","成本计划编制",true,{"key":16,"text":17,"correct":14},"B","成本控制",{"key":19,"text":20,"correct":14},"C","成本分析",{"key":22,"text":23,"correct":24},"D","成本偏差控制",false,{"key":26,"text":27,"correct":14},"E","成本考核","ABCE","2020版教材P343 \u002F 2019版教材P329 根据工程项目施工成本管理的要求和特点，工程项目施工成本计划实施的步骤为：成本预测→成本计划→成本控制→成本核算→成本分析→成本考核。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]