[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1137014":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1137014,797,2,"多选题","设备交付现场安装前，主持和参与验收的单位代表有（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":14},"B","监理单位",{"key":19,"text":20,"correct":14},"C","施工单位",{"key":22,"text":23,"correct":24},"D","设计单位",false,{"key":26,"text":27,"correct":14},"E","设备供货厂商","ABCE","2020版教材P282 \u002F 2019版教材P268 设备施工现场验收，参加单位：建设单位，监理单位，设备供货厂商，施工方有关代表参加。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]