[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136936":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1136936,797,2,"多选题","自动化仪表的取源部件安装完毕后，应随同（）进行压力试验。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工艺设备",true,{"key":16,"text":17,"correct":14},"B","工艺管道",{"key":19,"text":20,"correct":21},"C","仪表设备",false,{"key":23,"text":24,"correct":21},"D","控制仪表",{"key":26,"text":27,"correct":21},"E","显示仪表","AB","2020版教材P136 \u002F 2019版教材P126 取源部件安装完毕后，应与设备和管道同时进行压力试验。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]