[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1136927":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1136927,797,2,"多选题","凝汽器组装完毕后，汽侧灌水试验的工作内容有（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","灌水高度应充满整个冷却管的汽侧空间并高出顶部冷却管100mm",true,{"key":16,"text":17,"correct":14},"B","维持24h无渗漏",{"key":19,"text":20,"correct":14},"C","增加临时支撑",{"key":22,"text":23,"correct":14},"D","及时将水放净",{"key":25,"text":26,"correct":27},"E","水放净后烘干",false,"ABCD","2020版教材P126 \u002F 2019版教材P116 凝汽器内部设备、部件的安装：包括管板、隔板冷却管束的安装、连接。凝汽器组装完毕后，汽侧应进行灌水试验。灌水高度应充满整个冷却管的汽侧空间并高出顶部冷却管100mm，维持24h应无渗漏。已经就位在弹簧支座上的凝汽器，灌水试验前应加临时支撑。灌水试验完成后应及时把水放净。",{"id":6,"name":31,"category":32,"favorite":33},"一建机电工程实务","建筑工程",0]